Loading…
Loading…
60,021 results • Best match
Construction of retaining walls at Project campus under WBCADC Kalimpong Project
REPAIRS TO STONE PITCHING AND RETAINING WALLS OF ARN AT CME
Construction of Retaining Walls at Bhalukhop road near Arun Rai House
PROVISION OF RETAINING WALLS AT VARIOUS PLACES AT AF STATION KASAULI
Repairs (stone packing to damaged road Retaining walls) to Dawson road
Construction of Composite Gabion Bandhara , At-Javkhede Dumala, Pathardi,
Construction Of Protection Wall Infront Of Grampanchayat Near Bhavani Mandir Oddha At Somardi Tal Jaoli Dist Satara
CONSTRUCTION OF PROTECTION WALL FOR BACKWARDS CLASS SMASHANBHUMI ( GAT NO- 1 ) AT VILLAGE CHANDHAI ,TQ CHIKHALI ,DIST.BULDHANA
Construction of protection wall to avoid encroachment on Govt land at TarapurTq.Buldana Dist. Buldana Gat No 262
21.1 Construction of Protection wall and Improvement of Road Manewadi to Bhacharwadi VR 30 Tal. Panhala Dist.Kolhapur.
Package 50 Widening Impts Impts to quality Construction of Retaining wall and Breast wall, Reconstruction of Culvert Paver block including CD works to Government Roads in Nanguneri HCandM Sub Division including upkeeping for a period of 60
Slope protection to Dihabaringi TRE near Maa Dhyanadhyai Temple ( Earth work, Concrete and Packing work )
Repair and paint work of toe wall, MS flat railing and gate in various parks of sector 40 A and B, Chandigarh, under revenue head.
Repair and Paint Work of Toe Wall, MS Flat Railing and Gate In Green Belt of Sector 41 and Neighbourhood Parks of Sector 41A, Chandigarh.
REPAIR AND PAINT WORK OF TOE WALL, MS FLAT RAILING, AND GATE IN PARKS NEAR EWS FLATS AND PALM PARK, DADUMAJRA, CHANDIGARH, UNDER REVENUE HEAD
Co Protection wall Avoid Encroachment On Govt. Land Gut No. At.Village Anjani Khu. Tq.Lonar Dist.Buldhana
CO Protection wall at Shrikshetra Malachi Devi sansthan Deulgaonmahi Tq. Deulgaonraja Dist. Buldhana. (with hotmix
CONSTRUCTION OF CCR ROAD PROTECTION WALL BY MOKER POLE TO TULSIRCHAK SANSAD AT CHAKTARBAIDYA SANSAD
Construction of Protection wall For Dalit wasti Road side At. Nartawade, Tal. Radhangari , Dist Kolhapur
Construction of road protection wall with tali from tranasforma towards dibakar mondal khamar at mollarchak
Const. of Retaining Wall at Daruwala Chawl, Tadipita Chunabhatti. (Retaining Wall) (Kurla)
Pro.No. 145/24 Retaining wall for chirakkappara areekkal Culvert Retaining wall construction
Const. of Retaining Wall at Chauhan Chawl, Tadwadi, Chunabhatti. (Retaining Wall) (Kurla)
CONSTRUCTION OF TOE WALL FOR SEPARATING MINI MARKET AND RE LAYING OF DAMAGED WALKING TRACK AFTER DEMOLISHING EXISTING TRACK IN PARK NEAR STEPPING STONES SCHOOL SECTOR 38A, CHANDIGARH, UNDER WDF
Balance work for the construction of link road from Thunia Gala to HSS Udhan Block Khawas by way of slip clearance, protection wall, Gabion structure.
Slope protection, launching and packing
The fencing work and slope protection work of 02 nos. Rainwaterharvesting pond at NKSTPP.
Construction of Toe wall along light vehicle road from existing toe wall end towards near single row H.P culvert under ROCP.
Slope Protection to CE No. 39A on Birupa right embankment from RD 2850 m to 3100 m ,from RD 2500 m to 2800 m, Slope Protection to OAE Jamunapat Birupa right embankment from RD 700 m to 950 m , Slope protection to C.E. 34(B) Birupa right embankment fr
Construction of Retaining and breast wall for Towers in District Kargil
Construction of Breast Wall on Kanna Sandori Road at Kanna Chargal.
Dhai Nala (Right Bank) Approach Road Breast Wall on TPH Road.
Constt. of Breast Wall and fencing of school at NPS Dhaloga
Construction of Retaining and breast wall for Towers in District Kargil
Construction of breast wall at 1x6.3MVA Kochik Substation in District Kargil
Construction of Retaining and breast wall for Towers in District Kargil
Precast Breast Wall 2 mtr x 2 mtr x 2.25 mtr
CO Breast Wall Taxi Stand Totu Bazar ward No 6 Totu
Decorative Painting and Vertical Garden for Retaining Walls and BoundaryWalls at PVUNL Township.
Imp. Of Footpath and Retaining Wall in Nala from Sacham Nahar to Sector-3 Sumpwell in ward 77 Zone 03
Slope Protection work
Construction of road protection wall with tali from tranasforma towards Santosh Halder Pond at Kamarchak GP
Construction of link road to Village Bhalyani Km. 0/0 to 2/00 under NABARD SH Formation cutting, Retaining wall, Breast wall, cross drainage work, unlined drain, wire crates for dumping, Km. Stone and Setting out RIDF-XXVIII.
REPAIR TO DRAIN, PATHS, RETAINING WALL, COMPOUND WALLS, GATES, FENCING, BREAST WALL, PARAPET ETC AT LOWER DAHUNG, UPPER DAHUNG, CHINDIT TOP, TENGA LEDGE AND OTM ACCN NEAR DUNN BRIDGE AREA OF AGE B/R UNDER GE 859 EWS
S/R TO PBD ROAD SUCH AS CONSTRUCTION OF RETAINING WALL FROM 30.120 TO 30.150 KM AND DRAIN CUM BREAST WALL FROM 29.750 TO 30.020 KM AND RECESSED PARAPET WALL FROM 29.200 TO 29.300 KM FOR 2024-25
Const. of Youkma Shattu khul Stakpa by way of PCC Channel, retaining wall and Breast wall, cattle crossing at spot including construction of distributaries (Asthana, Youkma Shatoo, Zingzar, Khar) Under the project of Const. Youkma Shatoo Khul Stakpa
Restoration of rain damages on Khabli Dosarka to HLB Nadaun Road in Km 0.00 to 7.300 SH Construction of Breast wall at RD 6.410 to 6.420 6.610 to 6.630 Retaining wall at RD 5.230 to 5.260). Under PDNA
Restoration and Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on Batote- Khellani stretch