Loading…
Loading…
60,073 results • Best match
Formation cutting , Retaining Walls and Breast Wall between RD.2/00 to 2/135
Retaining Wall Kallar Kurisupara Ward 2
Slope protection measures at landslide affected downstream left bank area of Hatidubi Dam, Karbi Langpi Hydroelectric Project (2 x 50 MW), West Karbi Anglong, Assam.
PROTECTION WALL
Protection Wall
CONSTRUCTION OF RETAINING WALLS, BRICK WALL, PEB FOUNDATION AND SCREEDING WORKS at Kudappanakkunnu, in Thiruvananthapuram District.
Construction of Toe Wall and Garland Drain in Ash Pond area of BPSCL
Slope protection measures at landslide affected area at downstream left bank of Hatidubi dam, Karbi Langpi Hydro Electric Project (2X50 MW), APGCL, West Karbi Anglong, Assam (Phase-II).
CONSTRUCTION OF ROAD PROTECTION WALL BY TALI OF HERANBA NONDAL TO DIBAKAR SARDAR HOUSE AT MITHAKUNDU SANSAD
CONST OF WAITING SHED STORE ROOM LEVELLING WORK AND CONST OF RETAINING WALL AT RATANPUR SADAK SHAMSHAN GHAT W 84 Z 19 second call
Construction Of Protection Wall to Govt.Land to Stop Encroachment at Village Palaskhed GP Madakhed Tq Jalgaon Ja. Dist Buldana
Road Protection wall at chowdhury pukur, Mouza-Patrasayer, under Patrasayer GP under Patrasayer Panchayat Samity under CFC-BG Fund
Construction of brick soling with both side retaining wall from the H/o Anil Debbarma to Jhon Debbarma at Khejurbagan under AMC Ward NO-4 (SH Construction of Toe wall, earth filling, C/D, Brick soling etc work)
Restoration of rain damages on Chharour Nallah to Barogi road Km 0/00 to 7/850 (SH- Construction of Retaining wall with PCC Toe wall at RD 1/145 to 1/155 and 1/530 to 1/540
Restoration of rain damages on Chharour Nallah to Barogi road Km 0/00 to 7/850 (SH- Construction of Retaining wall with PCC Toe wall at RD 3/530 to 3/580 and 4/985 to 5/00).
PROVISION OF AWNING TO FRONT OPEN VERANDAH OF ASHOKA BLDG AND CONNECTING PASSAGE OF TRISHAKTI AND PROVN OF RETAINING WALL CUM TOE WALL, GUARD ROOM AND ALLIED WORKS ON ROAD FROM MEMORIAL CIRCLE TO PINES AT DSSC WELLINGTON.
Repairing of road embankment, constn. Of retaining wall, toe wall, repairing of shoulders of different roads at Makhan Nagar section, Sub Dn. Narmadapuram (1) Mudiyakheda to Gurla road (2) Khargawali to Tamcharu road (3) Khargawali to Mudiyakheda ro
Improvement of road starting from Sarkar Para to Garden High Resort road under AMC ward no_6_SH_WBM_II, WBM_III, Carpeting, seal coat, road marking, retaining wall, toe wall, road side drain and other allied works etc.(length is 850.00 Mtr).
Repair/Maint of fencing, drain, path, culvert and retaining wall, toe wall at GE (Utilities) AOR and internal wiring, light fitting, switch sockets, LED fittings along with connected accessories in CHNC and other areas under GE (Utilities) Udhampur
Mtc. of existing internal road and construction of new peripherial road around newly constructed academic block in the premises of Womens Polytechnic College, Hapania SH Soling, WBM, Paver Block, Toe Wall, RCC Retaining Wall, Patch Grouting, Re-Carpe
RETAINING WALL
Retaining wall
Construction of slope protection wall within RD 1.240 km to RD 1.450 km, RD 2.400 km to RD 2.550 km and construction of new Vertical Fall at RD 1.550 km and construction of VRB at RD 2.850 km of Kangarukonda Minor
Fd Protection Work Retaining wall
Lakshamkavala Vallikkettukavala Road Retaining Wall
MANANGOTTUPARA ROAD RETAINING WALL CONSTRUCTION
Retaining Wall Near Shamshanghat Narsinghpura
CHEMMANAMPARAMBU ROAD RETAINING WALL CONSTRUCTION
Retaining wall at Sarsabad Tetultala
PANAMKAVU ROAD RETAINING WALL CONSTRUCTION
CHEENIKKODU ROAD RETAINING WALL CONSTRUCTION
Karimpara Gomathy Culvert/Retaining wall
Maintenance of RCC retaining wall
Retaining wall, CC Road Work
SCHOOLPADY PEZHUMKAVALA ROAD RETAINING WALL
Retaining Wall At Zurgo Bogdang
Const. of concrete breast wall with drain towards railway track at playfield salmeri
Construction of Breast Wall at Ch36500 for maintenance of Mughal Road Buffliaz End.
Construction of Breast Wall at Ch21600 for maintenance of Mughal Road Buffliaz End.
Construction of Breast Wall at Ch14640 for maintenance of Mughal Road Buffliaz End.
Construction of Breast Wall at Ch18800 for maintenance of Mughal Road Buffliaz End.
SUPPLY FOF BREAST WALL FOR VARIOUS RCC UNDER 753 BRTF & 50 BRTF (Q3)
Construction of Breast Wall at Ban link Road Opposite Govt Primary School Ban
Construction of Breast Wall at Ch40700 for maintenance of Mughal Road Buffliaz End.
RETAINING WALL-ESTIMATE FOR THE COST OF RETAINING WALL AROUND CAMPSHED AT MEDAMCHAAL UNDER KARIMALA RANGE DURING - 2026-27-General Civil Work
Paint work of toe wall and MS flat railing in parks along V4 and V5 roads in sector 36, 37, 39, 40 and Maloya, Chandigarh under Revenue Head
Restoration and slope protection to Alaka right embankment from RD 1960m to 2013 mtr
Slope protection and construction of bathing ghat on Alaka left embankment near village Begunia