Loading…
Loading…
60,190 results • Best match
Improvement to Belpunji Branch canal within RD 1100m to 1800m including slope protection work of Manjore Irrigation Project.
Slope Protection work in Jayamangala Padamala Drainage Channel near village Lehanga (Madhupur) of Narsingpur Block in Cuttack District.
Slope protection work at RD 1290m VRB at RD 2130m and raising strengthening of banks of Kalopala Minor
Restoration of Damaged slope protection work upstream of B Type Block-1 at CISF Residential Establishment Dobat, DGPS.
Repairing of damaged boundary wall in DVC Hospital and slope protection in degree college area at DVC, BTPS.
Slope protection work to Right Bank of river Tel near village Bardipadar of Khaliapali G.P under Kantamal Block.
Construction of approach road and slope protection work on Purana-Odapada Bridge under Raghunathpur Block of Cuttack District.
Slope protection work by providing kerbed wall and concrete road surface at Dhoptala OCM under Sasti Sub Area
Improvement and Slope Protection of Right flood embankment of Kurumunda Bridge down stream for the year 2025-26
Repairs to Slope Protection area on South Bank of Inner Harbour Channel along Lova Garden Slope in VPA
Renovation of structures like fall, CDs and slope protection work of Umer minor from RD 750m to 2050m.
Slope protection work on the hill above the main entrance of Chibro Power House at Chibro, District Dehradun
Repair of Damaged R/Wall at Switchyard along with slope protection work for sliding area of CHEP-I.
Slope Protection to D/S side of Kusumi Barrage by H.G. Stone Packing near village Sunalati, Nayagarh District
Slope protection on Sana Genguti right embankment near village Ulluri, Purusottampur and Jagannathpur for the year 2025-26
Slope protection of Sana Genguti right at u/s of Jagannathpur H.L Bridge for the year 2026-27
Slope protection work on right embankment of Pattamundai Main canal near village Podabara for the year 2026-27
FDR Retaining wall in Madayakunnu Claret Bhavan road Reconstruction of damaged Retaining wall and allied works in Madayakunnu Claret Bhavan Road at ch 1 100 km
Slope protection to Daya left embankment from RD 38.800km to 39.00km near U/S of village Trilochanpur
Slope protection to the scoured bank of Sakhigopal Branch Canal from RD 14.800 km to 19.00 km
Slope protection to Bhargovi right embankment from RD 1.00Km. to 1.015Km. Near D/S of Bhargovi Syphone.
Slope protection to Bhargovi right embankment from RD 28.00 km to 29.00km near village Alarpur and Rathapurusottampur
Construction of Retaining wall, Sector13, Indira Gandhi Nagar, Jagatpura, Jaipur
Proposed Road path and Retaining wall at Bhagrotu ward-5
Ward No.5 me Retaining Wall and CC Road Work
F.D.R TO KANNAD CHIKALTHAN LONI BODKHA BAZARSAWANGI ROAD SH-219 KM 19/00 TO 35/600(FDR PROGRAM GABION RETAINING WALL KM 26/670, 26/400, 25/900, 25/670, 25/570 AND 24/970) TQ.KHULTABAD
Facility Management Services - LumpSum Based - Industrial; Construction of Retaining wall Gabion wall causeway & Pedestal near Ash Pipe Line Bridge of Obra B & C Thermal Power House; Consumables to be provided by service provider (inclusive in cont..
Estimate for the cost Of Construction of Retaining Wall in Illy Park Anakulam Section Anakulam Range During 2023-2024
Retaining wall
Retaining wall
RETAINING WALL
RETAINING WALL
RETAINING WALL
Retaining wall
Retaining wall
- Construction of Retaining wall, Breast wall, and Hume pipe culvert in various Rds.)
Construction of PCC Retaining wall and crate work Breast wall at various RDs
Treatment for formation damages, Construction of Gabin walls (Retaining wall, Breast wall) etcetera
Construction of PCC Retaining wall, Breast wall and crate work for protection work
Construction of RCC bridge approach over river Manu on the road from Bankul Budhamandhir to Hazarai para at ch 0.11 km during the year 2020 2021 SH GSB WBM-IIand III carpeting sand seal coat CC block, RCC Retaining wall and Toe wall etc
Imp of road from TTAADC H Q to Jampuijala SDM via Gurupada Colony and Firm Chowmuhani L 10.90 Km under Belbari RD Block SH Widening by GSB Metalling Carpeting Sand seal coating and construction of retaining wall toe wall and CD etc 2nd Call.
Imp. of road from NH 44 now NH 08 Champaknagar to TTAADC HQ via Balaram Thakur Para and Bikram Molsom L14.00 Km under Belbari RD Block SH Widening by GSB Metalling Carpeting Sand seal coating and construction of retaining wall toe wall and CD etc.
Restoration of rain damages on Kun Galoo to Baroha Ropa Matyal road km. 0/00 to 2/800. (SH- Construction of Retaining wall in wire crates with toe wall at 0/767 to 0/787 and RCC HPC at km 0/791) PDNA 2023
Restoration of road Samkar to Dhameta Bazaar km 0.0 to 1.415 SH Construction of retaining wall RHS at RD 0.660 to 0.670 edge wall in length 14.00 mtr. Wing wall in length 5.00 mtr. existing bridge toe wall D.S and cement concrete pavement in 16mtr
Construction of CD Toe wall at ch Km 4.00 and Retaining wall at km. 19.70. CD repair at km. 3.80, 7.80, 8.10, 10.00, 20.30, 28.50, 32.40, 33.30, 42.80 on Nagargali Katakola SH 138 in Khanapur Taluka under HOA 3054 SH Bridge Maintenance for 2025-26.
Constt. Of Toe wall from the H/o Balbir Singh,Munshi ram and others (ii) Constt. Of Toe wall from H/o Raj kumar,Prem Singh and others at W.No.06
Construction of Toe wall and providing and fixing G I Chain link fabric fencing and concertina coil fencing over toe wall at DMS Plot Murad Nagar and Baghpat dg 2024-25
CONSTRUCTION OF GABION WALL AND PARKING SHED FOR AMBULANCE AT KUMBHROSHI PHC TAL MAHABALESHWAR DIST. SATARA
Construction of fencing fond with Retaining walls in Kananbala Das pond plot no 295 at Sahapur (Act. ID- 110250273)
const of protection wall