Loading…
Loading…
1,182 results • Best match
Construction of retaining wall and levelling the ground for mechanical passengerlift to make an approach pathway from main entrance gate to the lift entrance and other civil important items as per the site conditions in Club house , Nyayavihar complex , Jubilee Hills , Hyderabad
Restoration of Canal Banks from km 6.304 to km 6.430 and repairs to damaged retaining wall at km 6.370 of U/s of SLRB and Repairs to road culvert at km 5.900 and km 6.370 of Bonakal Branch Canal, Lingagudem(V), Konijerla(M)
Providing Chain link Mesh and signage boards and caution boards to Krishna Nagar Irrigation Nala, Golnaka Bridge to Krishna Nagar Water line and at Kala Bridge Retaining Wall in Golnaka Ward-82, Amberpet Circle-16, SBZ, GHMC. (Rs. 33.00 Lakh) (3rd CALL)
Construction of sullage drain and retaining wall at Mysamma Temple in Ward No.18 and from Gambeer H.No.3-4-209 to Bhumanna House H.No.3-2-344 in Ward No.20 in Adilabad Municipality, Est. Cost Rs.15.00 Lakhs, Pattana Pragathi Fund
Erection of new 33/11 KV SS with connected 33 KV and 11 KV lines along with Construction of Control room, retaining wall for switchyard and other related civil works at RC Puram (V) in Patancheru (M) at Patancheru Division of Sangareddy Circle
Repairs to existing compound wall by raising the height of wall and providing and fixing concertina coil at in Phase-I of HRF at Hayathnagar, Hyderabad. SH: Construction of RCC retaining wall near damaged compound wall in Phase-I of HRF, Hayathnagar, Hyderabad.
FDR to Scoured Berms and Construction of Protection wall at Km 712/0-2 and 723/8-10 on Kalyan-Nirmal-Jagtial reach of NH-61 in Jagtial District in the State of Telangana 2nd call
Construction of Protection wall from H.no 7-1-276/B/24/1, Suprabhathnagar colony to H.No.7-1-276/B/33/1 &Nala at Renuka Nagar in 98-Ameerpet Divn, Khairtabad circle-17, Khairtabad Zone, GHMC.
Construction of Protection wall back side of three sub temples i.e. ( sub temple-2, sub temple-3, sub temple -4) on the top of the Bund near Ramappa Lake at Palampet (V), Venkatapur (M), Mulugu(Dist)
Construction of nala with RCC retaining wall and Laying of NP3 600mm dia storm water drain near RK Nagar RUB to avoid water stagnation in view of Monsoon-2025 in ward 140- Malkajgiri ,under circle-28,Malkajgiri, Sec-bad Zone,GHMC(Reserved for SC Only)
Construction of RCC Cantilever Retaining wall using M30 grade concrete all along the length of Pump House to avoid submerging of Pumps and Motors due to Rain water at Mallaram WTP premises under Mallaram Section, S.D-I, O & M Div-XXI. Control room, Secunderabad.
Construction of sullage drain and retaining wall at Mysamma Temple in Ward No.18 and from Gambeer H.No.3-4-209 to Bhumanna House H.No.3-2-344 in Ward No.20 Adilabad Municipality, Est. Cost Rs.15.00 Lakhs, Pattana Pragathi Grant (6th call)
Erection, testing and commissioning of new 33/11KV Substation with connected 33 KV, 11 KV line lines and Construction of Control room, retaining wall for switchyard and compound wall for substation at TSIIC Industrial Park, Thuniki Bollaram (V), Mulugu (M), Siddipet (Dist) on Turnkey basis.
(a) Construction of Box Drain from H.No. 25-40/43/3A in Anantha Saraswathi Nagar to railway bridge (b) Construction of Retaining wall from from CIEFEL colony railway bridge to S.P Nagar Railway bridge in East anandbagh, Division No.139 in GHMC Malkajgiri Circle-28.
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal duly arranging sand bags for diverting of stream and dewatering at 735MLD WTP premises at Mallaram, Mallaram section, SD-I, Control Room, Transmission Division IV, Control Room.
KTPS-V VI Stages -Civil- O M-II- Construction of Protection wall with RR Masonry along left side of low-level drain to prevent entry of storm water into MCC-I Ground floor breakers room in CHP Area
Construction of protection wall to existing 5 vent pipe culvert (1/850 km.) on road from Tallamada to Penadavaripalem at Malkaram GP of Dammapeta (M) of Bhadradri Kothagudem District, Est. Cost Rs.15.00 Lakhs (reserved for S.C. contractors)
Providing false ceiling and replacement of damaged MS windows with UPVC windows in the control house, Painting to battery room, retaining wall at 220KV side tower, drilling of new bore well, providing water supply arrangements to earth pits and other minor works at 220KV SS Ghanapur
C/o Retaining Wall from Punem Abbaiah (H) to Boda Srinivasa Rao (H) at Latchagudem (V), GP Gangaram of Tekulapally Mandal ( Invited under earmarked works- SCs/STs/Waddera/SAgara (Uppara) Societies and individuals belonging to such communities as the case may be, are only eligible to participate)
C/o Retaining Wall from Cheemala Nagaiah (H) to Chintala Veeraiah (H) at Thummalachelaka (V),GP Badduthanda of TEkulapally Mandal (Invited under earmarked works SCs/STs/WAders/Sagara (Uppara) sociaties and individuals belonging to such communities as the case mya be, are only eligible to participate.)
C/o Retaining Wall from Veesam Krishna (H) to Uke Swamy (H) at Petramachelaka (V) GP Bodu of Tekulapally Mandal ( Invited under earmarked works- SCs/STs/Waddera/Sagara (Uppara) societies and individuals belonging to such communities as the case may be , are only eligible to participate)
HYB Division:-Proposed Extension of FOB at Basar Railway station in connection with the work of " BSX-Prov of PF No 4,shelter(COP), retaining wall and extension of exg FOB to PF 4 as part of dev of new holding area on account of Pushkaram.
Construction of RCC 2 Vents Box Drain of size 3.00 m x 2.50 m drain from Shivanagar Graveyard Ch. 0 m to Ch. 610 m (near mosque) and Construction of retaining wall from Mud Fort to Shivanagar Graveyard upto 101.00 m under Hon'ble CM Assurance in GWMC
Construction of RCC Cantilever Retaining wall and open drain using nominal mix cement concrete all along the length of air vessels to avoid submerging of pump house due to Rain water at Mallaram WTP premises under Mallaram Section, S.D-I, O & M Div-XXI. Control room, Secunderabad.
C/o Retaining Wall from Chintha Nageswar Rao (H) to Punem Suresh (H) at Petramachelaka (V), GP Bodu of Tekulapally Mandal ( Invited under earmarked works SCs/STs/Wadders/Sagara (Upara) Societies and individuals belonging to such communities as the case may be, are only eligible to participate).
Reconstruction of retaining wall cum compound wall at the damaged portion in east and south sides of the existing compound wall of 132/33 KV SS Choutuppal in OMC, Nalgonda (Invited under earmarked works individuals belonging to Waddera/Sagara (Uppara) community are only eligible to participate)
C/o Retaining Wall from Kalathi Shekar (H) to Kunja Suresh (H) at Bodu (V),GP Bodu of Tekulapally Mandal ( Invited under earmarked works- SCs/STs/Waddera/Sagara (Uppara) Societies and individuals belonging to such communities as the case may be, are only eligible to participate)
Erection of 33/11 KV Sub-Station with connected 33 KV & 11 KV lines and Construction of Control room, Retaining wall for Switchyard and Compound wall for SS at TSIIC, ShivaNagar village in Jinnaram (M) & Section in Gummadidala Sub Division of Patancheru Division of Sangareddy Circle.
C/o Retaining Wall from Uke Paparao (H) to Uke Saraiah (H) at Thummalachelaka (V),GP Badduthanda of Tekulapally Mandal ( Invited under earmarked works- SCs/STs/Wadders/ Sagara (Uppara) societies are individuas belonging to such communities as the case may be, are only eligible to participate)
Removal of Jungle and deposited earth from Km 23.30 to Km 30.00 on Mudimanikyam Major and Construction of Protection wall @km 25.756 near Dunnapothulagandi on Mudimanikyam Major in Block-IV of NSLBC of Adavidevulapally(M), Nalgonda District (2nd call)
Construction of 10,000 T Ground level bunker and connected civil works such as Trippler conveyor gantry, Connecting gantry, 2 Nos. retaining walls, ramps and approach roads, civil works including fabrication and erection for accommodating 4x60 ton capacity coal receiving bunkers & 2 Nos 500 TPH feeder breakers , construction of slack coal bunker and its connected gantry and supply of RCC sleepers at SRP-CHP in Srirampur Area, Mancherial Dist., T.S
Establishment of National Animal Resource Facility for Bio-medical Research at Genome valley, Hyderabad, Turkapally, Medchal district, Telangana state. SH: Construction of balance hostel building for Research scholars including internal water supply, ... pathways, retaining walls , ...
Construction of CC Retaining wall from Km.6.820 to Km.6.920 km.6.940 to Km.6.960 on both sides at Chikkadpally Bridge on Hussain Sagar Surplus Nala and formation of channel in downstream of vent No.14 of Bridge across weir of Hussain Sagar Lake from 30.00m to 180.00m
Raising of Chimneys, coping for 200 Nos Tower legs and providing number plates, circuit plates & Danger Boards in 132 KV Bussapur - Nirmal line & 132 KV Nirmal Adilabad line and construction of retaining wall at Loc. No. 93 of 132 KV Nirmal line in OMC Adilabad of Karimnagar zone
Erection of new 33/11 KV Substation with connected 3.8KM 33 KV line and 4.4KM 11KV line and Construction of Control room, Retaining wall, internal security fencing, compound wall and Bore well, water sump for 33/11KV SS at Gummadam (V) in Pebbair Mandal, Wanaparthy Division in Wanaparthy Circle.
Construction of RCC Retaining wall ,crs steps and cc road near 8-15-115/11/a/3 and 8-15-115/10/b at akbar colony in Ward No.58, div shastripuram in Rajendranagar Circle.GHMC (A S Date 07-08-2025, Budget Year 2025-26) (Rs.15.80 Lakhs)
Providing patch work/Paver patches for the balance stretches of other damages R&B roads in Jagtial sub-division in Jagtial Dist (Sub work:- ER to damaged retaining wall at km 18/400 on Gopalraopet-Dharmapuri via Sarangapur, beerpur road from km 0/0-23/0 in Jagtial Dist
Consultancy Services for Survey, Investigation and Preparation of Detailed project Report for Formation of alternate roads along the Uppal Nala - Utilization of existing open Channel -Construction of RCC retaining wall to storm water drain and laying Sewer Pipeline to carry sewerage from Ali Cafe, Moosarmbagh to Nalla Cheruvu, Uppal.
Consultancy services for preparation simulation model for Hydraulics of Musi River from Osman Sagar Dam Down stream point to ORR East near Gowrelli and from Himayat Sagar down stream point confluence point at Bapughat under Musi riverfront ... for Retaining Wall
Construction of RCC Cantilever Retaining wall and open drain using nominal mix cement concrete all along the length of substation and upto Pallacheruvu to avoid submerging of pump house due to Rain water at Mallaram WTP premises under Mallaram Section, S.D-I, O & M Div-XXI. Control room, Secunderabad.
Erection of new 33/11 KV Substation with connected 3.5KM 33 KV line and 4.0KM 11KV line and Construction of Control room, Retaining wall, internal security fencing, compound wall and Bore well, water sump for 33/11KV SS at Manajipeta (V) in Ghanpur Mandal, Wanaparthy Division in Wanaparthy Circle.
"Construction of Gabion wall as protection work at Loc.No.49 of 220KV DC line from 400KV SS Oglapur(Warangal) to Bommakal & Oglapur to Huzurabad line" (Tender invited under earnmarked works - STs, Socieities & individuals belonging to ST communities are only eligible to participate)
Laying of SS flooring and Protection wall to Nalla Pochamma Temple in west Chandra Nagar in view of Bonalu Festival -2025 in 31-Reinbazar div in Santhosh Nagar circle-7,CRZ,GHMC(Reserved for SC Contractors / Proprietorship Firms / Partnership Firm)Rs.4.95
Operation and Maintenance for construction of protection wall & toe drain for head works of Dindi Medium Project from Km.0.00 to Km. 1.100 on left flank & from km.0.00 to 0.950 on right side flank for Dindi Project , Gundlapally (V&M) , Nalgondsa Dist.
Construction of Circle office building for SE/OMC/Khammam (G+2) and Construction of balance compound wall, protection wall and laying of CC Road in the switch yard and for circle office in the premises of 132/33KV SS Khammam in Khammam District.
Engaging a 110 HP hydraulic excavator for removal of sludge/silt in IDPL Colony and rising of the retaining wall of the nala to increase the clearance of the steel bridge at various locations in Ward No. 131, Quthbullapur Circle-25, Kukatpally Zone, GHMC. (AS year 2025-26) (Item No. 06)
Construction of CC Retaining Wall from Km 9.610 to km 9.810 (200m) on R/s & from km 9.735 to km 9.810 (75m) on L/s and provide chain link mesh from km 9.610 to km 9.695 (85m) on R/s near Nasar School at Khairatabad Circle on Balkapur Nala (MN4)
Construction of RCC Retaining wall of 3.5m height with reverse "L" footing for a length of 250m on either side of murkinala (P9)in Reach-II i.e., Gap portion of nala at Aljubail Colony from H. NO. 19-4-8/307 to 19-4-8/660/1, Hashamabad and Aljubail Colony
Erection, testing and Commissioning of 33/11KV SS switch yard along with connected 33KV and 11KV lines construction of control room, retaining wall for switch yard, culvert, providing of bore well, security fencing, outer fencing , gate and road formation at new 33/11KV SS Alwal(V), Haliya (M) of miryalguda division
Construction of retaining wall cum compound wall in place of collapsed wall in North west corner and providing earthen drains along main road side of 220/132 KV SS Manthani in OMC Circle Karimnagar-Invited under earmarked works-Waddera and Sagara(Uppara) societies and individuals are only eligible to participate