Loading…
Loading…
1,275 results • Best match
Work of retaining wall, jaal and side patri from to near of police chowki to kali mandir paodhoi nadi for dhobi ghat at ward no. 46
Earthwork in Embankment/Formation, Blanketing, Retaining wall, Extension of bridges etc., in connection with Proposal of loop line on Guna line at Sithauli -A Cabin Station
Construction of Fire protection wall, repair/renovation of Control Room Committee Room and Trench at 220 KV S/S R.P.H. Kanpur.
Construction of R.C.C. Protection wall of Sirsa Rotary and Bhati Rotary at 80m wide Asian Paint to Sirsa road, Greater Noida
Construction work of Protection Wall Bhamora Aonla Road to Malgaon Atarchedi Road at Km. 02 and 03 (V.R.) in Distt. Bareilly
Widening, Resurfacing and protection wall of 60M wide road from L.G. rotary to Sharda rotary in Sector KP-3, Greater Noida.
Construction work of Earth filling, retaining wall, drain and interlocking work from Lokman Das house to Santpal house in Ward No. 75 Jalalpur
Providing of HDPE Oven Bag, Nylon Crate and P.P.Rope Gabion at Ahiraulidan-Pipraghat Bund Store Km 0.800 in District Kushinagar.(Lot-5)
Providing of HDPE Woven Bag,Naylon Crate and P.P.Rope Gabion store at Km 8.800 of Chitauni Bund in District Kushinagar (Lot-1)
Construction Of Toe Wall For Stability Of Country Side Slope And To Keep The Land Encroachment Free In Length Of 1000 Meter On Zardi Domra Bund On Left Bank Of River Rohin In District Maharajganj.
Repairing and relaying of damaged boulder Pitching and toe wall at d/s of VRB and fall of Hardoi Branch from Km 65.365 to Km 65.385( R/S) ,Km 68.040 to Km 68.060 (B/S).
Facility Management Services - LumpSum Based - Construction of Approach Road at Electricity Store Centre Balrampur including earth filling toe wall and CC road works; Civil Works; Consumables to be provided by service provider (inclusive in contract ..
C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electrical distribution board at JNV, Pilibhit (UP). SH: Repair of remaining road work.
Facility Management Services - LumpSum Based - Raising of Pathways and Sand Earth Filling Works Including Toe Wall Construction in Switchyard Due to Waterlogging at 33 11 KV Substations Kanshiram and Kabbakhera District Unnao; Civil Work; Consumables..
Work of retaining wall on the pond located at Km-1 of Dokam Amya Kamsar Budhau road from Km-5 of Sohna Trilokpur Kohrauda other district road.
MC EW C OF AM TO CONSERVATION AND REPAIR OF MEDIEVAL PERIOD STRUCTURES AND RETAINING WALL AT NORTHERN SIDE OF THE MOUND KNOWN AS ULTA KHERA HASTINAPUR
Earth filling, retaining wall, drain and interlocking work from the house of Mohan Lal (Jatav) to the house of Hariom in Ward No. 75 Mohalla Ayodhya Puri.
WARD NO 39JAJALIPURA ME AADAMPUR BATULOHIYA MUMTAJ KE MAKAAN SE MASJID HOTE HUEE A40/60 E2 SE A40/57 KM TAK KACCHI GALI INTERLOCKING RETAINING WALL WORK
From Kamlesh house in Ward No. 18 to Soni Shukla house via Rajkumar house to Ramshankar Sharma house, construction of retaining wall CC covered drain and soil
Construction of RCC Retaining Wall both side of Nala, Teen Shed, Toilet, One new shop and CC work onfront market and boundrywall repairing in Azad Nagar market.
WARD NO. 24 MAY KALLU SHAH KE KABRISTAN SE BADRUDDIN VIA KARIM SHAH KE GHAR TAK INTERLOCKING SADAK, RETAINING WALL AVAM DHAKKAN SAHIT NALA KA NIRMAN KARYA
Civil Works related to Construction of Retaining wall Security wall Drain Installation of Sump Pump Gate and Misc Civil Works at 132 KV Sub Station Barahalganj Gorakhpur
Construction work of retaining wall and H.P. culvert at the damaged minor bridge on the Jhansi Mirzapur road to Mauhari Bamhauri Beldaran Charkhari road at km 6.
Construction of Retaining Wall of Budaun Bijnour Road to Bhatri Goverdhanpur Wazirganj Road (ODR) In Km 8 and 16 Under Special Repair in Financial Year 2025-26
VIKAS KHAND NAUTANWA KE GRAM PANCHYAT CHAKDAH KETOLA MADARBHAULI POKHARE KE BAGAL ME 1X3 MITER SPAN KI RCC PULIYA 10 MITER RETAINING WALL AVM APROCH NIRMAD KARYA
Bewa musthakam se kapiya marg ke km 01(130) me sthit talab ke kinare sadak ke chatigrast bhag ko surakchit karne hetu retaining wall ka nirman karya
Construction of Retaining Wall and other miscellaneous civil work for Revetment of Tower location No. 1/0 Situated on 132 KV Chandpur (220KV)-Tajpur DC Line Bijnor
Under District Sitapur, Painting road from Kalli Naimisharanya road to Samdaspur and construction of 80 meter retaining wall on the banks of the pond. Lot No 1
Special Repair, Retaining Wall and Construction of C.C. road and drain in abadi portion of Paraur to Kundariya Link Road in Distt. Shahjahanpur Fin. Year 2025-26
Construction of Retaining wall and Earth filling in between DFC Track & ROW in DDUN-UNDN section of DDU Unit of Eastern Dedicated Freight Corridor, CGM/DDU unit.
15. WARD NO. 20 ME MAJNU WALA ROAD SE HULLAS RAI FACTORY KE PICHE PULIYA TAK CC SADAK CHODIKARAN AUR NALE KI RETAINING WALL KA NIRMAN KARYA
Special repair work at Km. 1(400) 2(600) of Kapasi to Mahuvaara link road and construction of retaining wall on the damaged embankment at Km. 1
Special repair work of Damaged Hume Pipe Culvert on Lehra Sakha Road (Saidupur Pahadpur) and Drain in Abadi Portion and Protection Wall
Repairing of protection wall and pavement at light vehicle diesel filling point and providing drain near drill section shed at Khadia Project
Providing of HDPE Oven Bag, Nylon Crate and P.P.Rope Gabion at Ahiraulidan-Pipraghat Bund Temporary Store Km 13.000 in District Kushinagar.(Lot-6)
STONE BOULDER PITCHING WITH TOE WALL OF BUND SLOPE BETWEEN KM 15.920 TO KM 16.220 AND KM 16.800 TO KM 17.250 OF KARMAINI-BELAULI BUND ON RIGHT BANK OF RAPTI RIVER IN TEHSIL MEHDAWAL DISTRICT-SANTKABIRNAGAR.
BRICK SOLING WORK BETWEEN KM 5.386 TO KM 6.850 AND CONSTRUCTION OF TOE WALL WITH SLOPE PITCHING FROM KM 6.200 TO KM 6.450 ON KANAIL-MAJHGAVAN TATBUND ON RIGHT BANK OF RIVER RAPTI IN DISTT. GORAKHPUR
Facility Management Services - LumpSum Based - Raising of Pathways and Sand Earth Filling Works Including Toe Wall Construction in Switchyards Due to Waterlogging at 33 11 KV Substations Industrial Area Banthar and Magarwara District Unnao; Civil Wo..
Old NH-2 ka shahri bhag (Bihar Border Section) Cantt Padav marg ka vishesh marammat ka karya (Chuakaghat Fly Over ke retaining wall ka nirman va anya karya)
Construction of retaining wall in place of damaged embankment at Km. 2.365 to 2.400, 2.453 to 2.468, 7.266 to 7.291, and 7.301 to 7.306 on Hansar Kailgwan Road.
Gram Targuwa Talbahet me Kasturba Gandhi Avasiya School Bhawan and Hostal Bhawan se lagi huyi purani boundrywall ko surakshit kiye jane hetu 90 Mtr Retaining wall ka nirman
Under District Maharajganj, Construction of CC road and retaining wall on Pokhra from Pitch Road in Gram Panchayat Talhi to Manoj Chaudhary house via Idgah, Lot No 1
Construction of two side drains clay filling retaining wall and color interliking road up to the house of Karan Gupta from Karan Gupta house in Ward no 11
Repair of retaining wall along the toe of dump along CTR near barrier no-1 and removal of silt behind wall at Khadia project during monsoon 2026-27
Construction work of Earth filling, retaining wall, drain and interlocking work in Awantan Colony from transformer to Ashok house and link streets in Ward No. 75 Jalalpur area
Construction of RCC Slope structure with Retaining wall Pedestal Staircase Ramp Stone pitching work and Cut off wall at first stage of newly constructed Singhvahini Pump canal Banda
Gram Peeplo Deoband bypass se vishvas ke khet tak khranja and Retaining Wall and Vishvas ke khet se gaon ke main road tak cc road and nali nirman
CONSTRUCTION 01 NO CULVERT, PUMP HOUSE, LT PANEL ROOM, APPROACH ROAD, RETAINING WALL AND EARTH FILLING IN CAMPUS OF NEWLY CONSTRUCTED TH AT POLICE LINE SIDDHARTH NAGAR U.P.
36- Year 2025-26 Gram Panchayat Kari ghat pul se Patandeen ke ghar va Pasinpurwa tak ke Dain taraf Retaining wall ka Nirman karya. (Block Tejwapur) (80 Mtr)
Cons. work of CC Road Narli and retaining wall under special repair in the populated part of Mursaina Azimnagar Milkkhanam road via Khimotiya Bakhti via Alinagar Shumali road