Loading…
Loading…
1,275 results • Best match
ROAD NALI
ROAD NALI
Restoration of stone pitching work of Karma Mr. From km 0.00 to 0.150 and km.1.00 to km 1.200,fall at km 0.900 and construction of protection wall From km 1.400 to Km 1.430. LOT-01
ROAD NALI
Road and Nali
ROAD NALI
Estimate for restoration of stone pitching work from Km.0.00 to km 0.150 and from Km.0.700 to km 0.750 of parahi mr.construction of protection wall from km 2.970 to km 3.00 of maddhupur dy LOT-11 RETENDER
ROAD NALI
ROAD NALI
Construction of Protection wall and Restroration of Damaged 02 No. C.C. Spur and 10 No. C.C. Stud Situated of L.P. Band in D/s of Hathnikund Barrage for Proctect Village Kheri, Faizabad, Madhti, Naushera, Fatehpur etc. Block-Saddholi Kadim Distt.SRE
ROAD NALI
ROAD NALI
ROAD NALI
ROAD NALI
ROAD NALI
Estimate for Repair of stone pitching work from Km.6.500 to km 6.560 of maddhupur dy, Repair of head regulator of madhupur minor and construction of Protection wall on L/S of madhupur minor from km 0.00 to 0.025 LOT-05 RETENDER
Estimate for Restoration of fall at Km 2.400 ,km 3.200, km 3.410 and construction of protection wall at U/S and D/S (100m in length ) of khairpur mr under project GMC km 32.00 to km 41.600 and Restoration of madhupur Dy System. LOT-05 RETENDER
Kurhool Rajwaha ke Km. 0.000 to 0.400, Km. 1.400 to 1.800, Km. 2.200 to 2.600, Km. 3.200 to 3.900, Km. 5.380 to 5.680, Km. 7.350 to 7.850, Km. 8.275 to 8.875 Ke Maddhy Protection Wall Nirman and Km. 0.000 to 9.300 Ke maddhy Earth Work, Boundary Pilla
Hiring of inspection vehicle for Hamirpur sub division office Subwork/Packages: Ch to Development work of the HPTU campus with the development of of playground with seating capacity 200 students and formal seating for the dignitaries and construction ... of Retaining wall for ...
Estimate for ReConstruction of VRB at Head, Repairing of fall at km 0.595, km 1.300 and km 1.700, km 2.400, km 3.250, km 4.500 and km 6.500 and Construction of Protection wall from km 0.007 to km 0.022, km 0.980 to km 1.010 , km 1.042 to km 1.061,
Estimate for Repairing Fall at km 18.440 an km 20.202 ,Construction of Protection wall from km 11.510 to 11.520, km 13.342 to 13.362, km 13.367 to km 13.392, km 18.197 to km 18.207, km 20.100 to km 20.106, km 20.370 to km 20.392, km 23.508 to km 23
Volleyball Ring, Synthetic 8 Layer Cushion System IT F Approved, 12 into LED Flood Light Including Electrical Work and Installation, Digital Electronic Score Board With Stand 3 ft by 6ft including installation, Volleyball Pole comma Board Ring and ... Height, Toe Wall , ...
Field dimension, Digging and black soil treatment, Sub surface work for court, Sub head drainage, Asphalt work, Synthetic hockey turf, Retaining wall, Goal post and nets, Seating Teams dugout, High mast light, Line marking of ground, Water and electricity, Hockey stick composite size 37 right handed with carry bags, Shin pad, Hockey ball, Abdominal guard, Gloves left hand, Face shield, Goal keeper kit, Shoes, Water submersible system
Soiling, Asphalt Work, Deco Turf 8 Layer Cushion system for synthetic, Volleyball court line marking with paints as per international standards, Volleyball Pole gear system with earth work, Volleyball pole gear system with net referee stand and 02 x ... height Retaining wall with ...
Modular Structure Containerized Shooting Range made of AR five hundred, Master Control Unit complete with systems and accessories, Wireless Overhead Target System, Firing Bays NIJ Level three Protection two Lanes, Bullet Trap System, Anti Ricochet ... Target Protection Wall To ...