Loading…
Loading…
10,897 results • Best match
P/L Tarring in km. 0/0 to 0/350,0/410 to 0/550 and P/L interlocking paver block at Rd. 0/350 to 0/410) Under SCSP Head
C/O Formation cutting, ROFD and PCC R/Wall at RD 0/300 to 0/315) OTMNP
P/L 600mm dia R.C.C. hume pipe culvert at R.D. 0/600 C/o R/wall at R.D, 0/650 to 0/655 with wing wall respectively
C/o R/wall at RD 0/035 to 0/070, 0/195 to 0/225 and 0/430 to 0/465, V-shape drain in Km. 0/035 to 0/230, M.T. work in Km. 0/685 to 1/0 and P/L 1 4 8 and 1 2 4 in Km. 0/415 to 0/463 and 0/583 to 0/685)
Construction of Formation cutting , Sub Base, Metalling and Tarring, cross drainage work Retaining wall, Breast wall, Parapets, Km. stones, dumping site etc. Km. 0/00 to 2/075 including five year maintenance) Under NABARD RIDF-XXXI
C/o Balance Work of 10.00mtr. Span Bridge at RD 0/045
(SH- Geological investigation of soil/strata, preparation of hydraulic data, detail design and drawing and DPR/Estimate)
Providing and Laying GSB, G-II in Km 0/0 to 3/165
Formation cutting in km. 0/0 to 0/090, 0/120 to 0/345, 0/375 to 0/55, P/L 900 mm dia RCC hume pipe culvert at Rd. 0/100,0/360, C/O R/wall at Rd. various rds. and P/L GSB in km. 0/0 to 0/550) Under OTMNP Head
SH F/C 5/7 mtr wide in Km 0/300 to 0/0/525
C/O PCC R/Wall at Rd 0/305 to 0/345 and PCC V shape side drain in Km 0/100 to 0/400 and 0/450 to 0/500
P/L CC work in Km 0/165 to 0/315) under MMGSY
(SH- R/wall B/wall , Cross drainage works,P/L Kharanja stone soling, Drain, Parapets and dumping site in Km 0/00 to 6/000)UNDER NABARD RIDF
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 I/c paver block, G-III in pot holes
C/O PCC Breast Wall at Rd 0/230 to 0/245 and 0/280 to 0/300
C/O PCC R/Wall at Rd 3/200 to 3/225
SH P L BC in K M 0 0 to 4 0
Fomation cutting between km RDS 0/0 to 0/360 HPC at km 0/150 and wire crated wall between km 0/040 to 0/085
P/L GSB,G-II,G-III,Metalling and Tarring at RD 0/650 to 1/160,HP Culvert at RD 0/720 and CC Pavement at RD 0/072 to 0/196 and 0/300 to 0/450,Edge wall at RD 0/300 to 0/450
P/L GSB,WBM_II and M.T.works at RD 0/0 to 0/350 MMGSY
(Sub Head -Construction of Breast wall for protection of Cow shed at Km 0/720 to 0/733).
Formation Cutting C.D. works Providing and laying M/T in Km. 0/0 to 0/510
C/o U-Shape drain at RD 0/005 to 0/125, 1/040 to 1/120 and Cement concrete in berms at RD 0/600 to 0/800 and 0/850 to 0/950 and Cement concrete passing point at RD 0/800 to 0/830). OTMNP
SH Metalling/ Tarring C.D work R/wall and V-shape drain in Km 0/0 to 1/0
(SH formation cutting in km 3/525 to 3/870 C/O R/Wall at RD 3/965 to 3/990 P/L900 mm dia RCC hume pipe culvert at Rd 3/795 P/L 600 mm dia RCC hume pipe culvert at RD 3/945 and P/L GSB WMM and SDBC in km 3/525 to 4/020)(Under SCSP Head)
900mm dia Hume pipe culvert at various RDs
SH C O U Shape drain at RD 0 200 to 0 300 and 0 740 to 0 860
SH Providing and laying WBM G-I,C.D. Works, etc
F.C. in km. 0/0 to 0/300, P/L WBM G.I, G.II and Tarring work in km. 0/0 to 0/400, C/o 900mm dia RCC Hume Pipe Culvert ) Under DMFT
Construction of 900 mm dia Hume pipe culvert in km 1/750, 1 /990 and 2/350
SH Construction of cement concrete pavement at RD 0/930 to 1/030
Formation cutting km 0/0 to 2/400
SH- Formation cutting and wire crate for dumping sites
C/OToe wall and catch pit at RD 0/200 to 0/300 OTMNP
C/O 900 mm dia hume Pipe Culvert at RD 0/585 and 1/370)
Providing and Laying G-I G-II and M/T in Km 0/000 to 0/740
C/O PCC R/Wall at Rd 0/092 to 0/105 0/140 to 0/160 and B/Wall at Rd 0/720 to 0/735
C/o C.C. Pavement of Berms from RDs 0/680 to 0/730 and 0/740 to 0/800
C.O R.wall at RD 0.0 to 0.070 and Cement concrete pavement at 0.070 to 0.080 and 0.090 to 0.099) Under Deposit
Construction of C.C.Pavement at RD 1/900 to 1/930, 2/150 to 2/180 and C/O R/Wall at RD 1/060 to 1/075 ) (UNDER SCSP)
/L WMM and Tarring from R.D . 0/0 to 0/300 and Edge walls at various RDs. (D.C. Deposit)
C/o 2.00 meter RCC Slab Culvert at RD 0/525
SH - C/O B/Wall in wire crate at RD 2/250 to 2/290.
Providing and Laying WBM G-II for profile correction and 2 cm Thick premix carpet with seal coat Km 0/00 to 0/500
Formation Cutting 5/7 mtr wide road in Km 0/285 to 0/540 and P/L Kharanja Stone Soling at Rd 0/000 to 0/540
P/L Solid cause way at rd.0/135 to 0/165 with toe wall, 600mm dia RCC hume pipe culvert ,edge wall at various rds.)Under OTMNP
(SH-F/C 5/7 mtr wide in km 0/300 to 0/556) under SCSP
F/C at Rd 0/00 to 0/060, C/O R/wall at RD 0/049 to 0/060 and P/L CC Pavement at RD 0/00 to 0/014.40) Deposit BSP/2023/41
SH Construction of cement concrete pavement at RD 1/600 to 1/700
SH Construction of PCC Retaining wall a RD1/655 to 1/660 PCC Breast wall at RD 1/657 to 1/675