Loading…
Loading…
10,901 results • Best match
Providing AND Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 3/000 to 4/800
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 5/000 to 6/000
Providing and laying 30mm thick Bituminous concrete in Km 5/00 to 6/00 , 10/00 to 11/00 and 15/00 to 17/00 4.00 Kms)
Providing and laying 30mm single layer bituminous concrete (HP0410VR008218203) km. 0/0 to 1/0, 1/0 to 2/0 , 2/0 to 2/420 and interlocking pavers block at RD 0/190 to 0/250, 0/390 to 0/440, 0/770 to 0/860 and 1/540 to 1/570
Providing and laying 30mm single layer bituminous concrete (HP0404VR008215101 km. 0/0 to 5/0
Providing and laying 30mm thick Bituminous concrete including profile correction in Km. 1/0 to 5/0
SH Providing and laying renewal coat by Bituminous concrete in Km0/0 to 2/0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/000
Metalling and Tarring R/wall B/walls PCC drain Parapets km Stone Setting out Metal beam un-paved shoulder and five year maintenance Package No.HP-06-145
P/L 30mm thick bituminious concrete I KM 2/0 to 2/690
SH Providing and laying renewal coat By providing Bitumenous concrete in Km0/0 to 6/720 including road marking
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
Improvement, Construction of Passing Places, Missing CD, Side Drain, Parapets, CC Pavement, Interlocking Paver Block, Tarring work and Sign boards).
Providing and laying built-up spray grout, bituminous concrete in Km. 2/0 to 4/0
Initial Rectification before Periodic Renewal Between Per kilometer 0/00-4/00 )Repair of Pot holes and Side Drain , Periodical Renewal Per kilometer 0/00-4/00 and Post Maintenace After Periodical Renewal Per kilometer 0/00-4/00)
Providing and Laying and Rolling of Close-graded Mix seal surfacing 25mm thickness. HP0405VR004815401 Km 0.0 to 1.0
Providing and laying 30mm thick Bituminous concrete including profile correction in Km. 7/0 to 8/0 and 12/0 to 21/0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 6/000 to 7/000
Providing and laying built-up spray grout, bituminous concrete in Km.1/0 to 1/500
(SH - P/L 30mm thick bituminous concrete in km.0/0 to 1/0
SH. Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,1/00 to 2/00
Providing and laying Tack coat and Bituminous Concrete
Repair of Pot Holes in between km 0/00 to 16/00, 9/00 to 14/300, 0/00 to 1/500 and 0/00 to 3/00 respectively)
Sarkaghat to Makehar Road 4.0 to 6.0 and Kharoh to Paplog Road Km 0.00 to 1.0 under AMP for the year2025-26 . (Providing and laying 25mm thick bituminous concrete in various (VILLAGE ROADS)
Repair of road in km 0/00 to 2/00, C/O R/wall at Rd.1/615 to 1/621.80
Repair of road in km 0/00 to 2/00, C/O R/wall at Rd.1/250 to 1/256.80
Repair of road in km 0/00 to 5/500, C/O R/wall at Rd. 4/500 to 4/519
Repair of road in km 0/00 to 2/00, C/O R/wall at Rd.0/400 to 0/417
Repair of road in km 0/00 to 2/00, C/O R/wall at Rd.0/250 to 0/256.80
Repair of road in km 0/00 to 8/00, C/O R/wall at Rd. 7/890 to 7/902.40)
Improvement and widening of road at RD 0/070 to 0/0175, C/O Edge wall at RD 0/040 to 0/055(left side) and 0/058 to 0/068 (Both side) and C/O 2.00 mtr span RCC slab culvert at RD 0/057) (MMGSY)
Sub Head - P/L paver block and Hume Pipe 2nd call.
Construction of road from culvert to House of Bhan Singh etc. in GP Fatehpur km 0.0 to 1.0 SH Construction of R.wall at RD 0.015 to 0.055 RHS, 0.135 to 0.215 RHS and E wall at RD 0.0 to 0.060 LHS under Mukhya Mantri Sadak yojna
Construction of road from Dini Larth road Minta to Mata Mandir in village Raud GP Rehan-II Under MMSY SH Construction of Retaining wall at RD 1.013 to 1.028 LHS, 1.017 to 1.037 RHS Wing wall with HPC at RD 1.141.50 and Providing and laying Grading I
Construction of road from Kasial to Village Punal in GP Luthial Km 0.0 to 1.530 SH Construction of formation cutting, 900mm dia HP culvert at RD 0.227 and 0.407, U shape drain at RD 0.121 to 0.225 and cement concrete pavement at RD 0.121 to 0.250 Und
Construction of road from Kasba Kotla to Koi road Km. 0/0 to 2/600 (SH. Providing and laying 30mm thick bituminous concrete with paver finisher in Km. 1/0 to 1/350 1/745 to 1/900 and 2/0 to 2/600 under Industrial Corridor)
Job 1 Construction of road from Lower Panjawar covering Saini Muhalla, Dhakki Muhalla up to Daulatpur llink road and Nagnoli Petrol Pump via ward No. 5 upto Shiv Mandir Panjawar and Maadu Ki Nihali SE Madam-Ka Ghar Tak Village Panjawar Km. 0-0 to 8-0
Construction of road from Patta Jatian road to Paplah bridge via Patta Brahmana in GP Patta SH Construction Edge wall with V shape drain at RD 1.400 to 1.432 and Breast wall from RD 2.245 to 2.295 LHS and providing and aying CC Pavement at RD 5.54
Construction of road from Aghar School to SC Basti Aghar in GP Rey SH Construction Retaining wall at RD 0.170 to 0.175, 0.250 to 0.255,0.370 to 0/387, 0.455 to 0.465 and cement concrete pavement at RD 0.095 to 0.155 and 0.370 to 0.445 Under MMSY
BITUMIN AND PAVER WORK
C/o Primary Health Centre Level-II building at Ghanaghughat Tehsil Arki District Solan HP. (SH- C/o building work, site development ,C/o approach road and boundary wall.Providing water supply and sanitary installation, Rain Harvesting tank and septi
Restoration of WSS Manali Town in Tehsil Manali Distt. Kullu HP. Restoration of WSS Manali Town in Tehsil Manali Distt. Kullu HP Providing crate work at source approach road to WTP, Dredging in Manalsu Nallah for protection of source
Restoration of approach road to Ganvi Power House stage-I by providing wire crate wall left bank of Ganvi Khad RD 10.00 to 20.00 mtr. which was damaged/eroded due to heavy flood in Ganvi khad during July 2023.
SH P/L Tack coat 30 mm Bituminouse Concrete and Thermoplastic Layer on Link road Baffirin Khandera Via Harner VR-056 KM 0/00 to 1/500
C/O link road from Mohan Niwas to Teer km 0/00 to 1/00 SH Improvement of Formation Defficency between km 0/240 to 0/855
C/O link road Dabbar to Galchu km 0/00 to 1/126 SH F/C 5/7 mtr wide road km 0/00 to 0/315
SH providing protection work in D/S side of Bridge and along the Khad on Chanalmajra side
C/o 52.00 mtr span bridge over Tringle/ Maseh Nallah at RD 0/030 including both side approaches) (Under OTMNP Head)