Loading…
Loading…
19,199 results • Best match
Construction of link road from Sora Badakhana road to Rather Mohalla by way of EW in cutting , P F GSB Construction of B wall n Pacca drain in km 1st Rd 0-1000. under State Plan
Renovation of lane and other allied works from link road to mohalla Nassib singh and Others Wno 4 Pyt- Jandyal Lower Block Mathwar Under scheme District Capex Budget DDC component for the year of 2022 - 23
Lane from h/o Ram rattan to bod raj w.no.4 and drain h/o subash chander to Bharat Bhushan and L/D h/o balkar singh to laj bakti and balbir singh to link road
Improvement of link road by way of filling of pot holes from Heritage School to Atal Vihar and allied links including Dilli Birpur road by way of providing and laying (Shingling), (Metalling) and 25mm thick SDBC
Up-gradation of road by way of providing and laying 50mm thick Bituminous macadam and 25mm thick Semi-dense Bituminous Concrete on University Link road in Km 3rd RD (850-1000) Km 4th RD (0-350).
Macadamization of link road to Charathni Mohalla by way of providing/laying 150mm thick WBM Grade-II (shingling) in two layers (75mm thick each), 75mm thick Wet Mix Macadam and 25mm thick OGPC with seal coat
Construction of Link road by way of Construction Earth Work in Cutting,Walling and Providing and Laying 150mm thick WBM Gr-II in Km 1st RD 0 to 500 on Main road to Mohalla Miran Khanater
Upgradation of link road main road to House of Kali Dass S O Tirlok Chand R O Charyalla by way of providing and laying WBM Grade II WBM Grade III and 25mm thick OGPC 3rd Call
Constt. of lane drain from the h/o shamsher singh to jawahar lal at wno 5 and constt. of l/d with culvert from link road to the H/o jaswant singh and others wno 3
Construction of link road Motorable bridge Kulani to Upper Khenu Mohalla Chandain via Lower Khenu Near Masjid by way of Walling and Providing and Laying 900mm dia Hume Pipe Culvert and 75mm thick WBM Grade-II
Improvement Upgradation of road from shiva dal bridge to Mandrana link road to sheva bagh via H O DC Raina upto H O Pishori lal Raina by way of construction of Edge wall under State Sector
Construction of link road leading to BGSB University Rajouri. By way of providing and laying WBM GR II, walling home pipe culvert in Km 1st RD 300 to km 2nd RD 400 length 100mtr (under ARD)
Constt. of C/path from link road to H/o Darshan Kumar and others and repairing of drain at Moh. Bougal w.no. 2 pyt. Rajinderpura Block Vijaypur District Samba Capex PRI for the year 2023-2024.
Construction of Fencing using Square PCC Fence Posts and G.I Barbed Wire 5 Strands with 2 Criss Cross 3100 Rft. at Strip Karali-Parsholla link road Gulmana and Batote Kishtwar NH 244 Charya kandote Distt Doda
Lane from h/o Ram rattan to bod raj w.no.4 and drain h/o subash chander to Bharat Bhushan and L/D h/o balkar singh to laj bakti and balbir singh to link road
Constt. of Lane from Link Road to Moh. Shaheed Randeep Singh And Others W. no.4 at Bomal in Pyt Bomal Block -Akhnoor Under (PRI) scheme District Capex Budget for the year 2023-24 ( Pyt Level)
Prot. Of lane from link road to H/o rakesh kumar, sardari lal ,des raj and others at wno 1 constt. of lane with prot. From h/o chagger singh to karan singh at wno 1
Improvement upgradation of road by way of Providing and laying of WMM, 50mm thick BM including 25mm thick SDBC on Kotli Galabana to Khana Chak Purobana road, Link road Rangpur Sidray, Chowala to Badyal Qazian road
Construction of link road leading to BGSB University Rajouri by way of providing and laying WBM GR II walling home pipe culvert in Km 1st RD 300 to km 2nd RD 400 length 1100mtr (under ARD)
BALANCE WORK IMPROVEMENT UP GRADATION OF LINK ROAD FROM YOURDOO BHATTA TO PETHGAM BY WAY OF GRADE I,II,III INCLUDING BM AND 25 MM THICK SDBC L 2KM UNDER CITY AND TOWN PROGRAMME 2024 25
Construction of Link road from MLA road end Point Gagrian to Central Gagrian via Jamia Masjid Gagrian by way of Earth Work in Cutting, Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Permanent Restoration of Link Road from Punni Di Hatti to Gangwoon via Sujatpur Pupa road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-04, Block Marh, District Jammu
Const. of Lane drain from Link Road to H/o Prem Kumar Ward No. 1 and Const. of drain near H/o Kuldeep and Vijay Kumar Ward No. 1, Kishanpur Kandi Panchayat Kishanpur Kandi Block Barnoti
Prot. Of lane from link road to H/o rakesh kumar, sardari lal ,des raj and others at wno 1 constt. of lane with prot. From h/o chagger singh to karan singh at wno 1
Construction of lane AND drain from link road via H/o Mehraj-ud-Din Bhat S/o late Ghulam Muhammad Bhat to H/o Gulzar Ahmad Reshi at Abu-Bakar Colony, Mulfaq, Lane No 01 Tailbal
Construction of Drain with allied work from SSP Link Road towards house of Rashwantsingh and others opposite Nirankari Bhawan ward no. 06 Pyt Mari-B Block Reasi under Capex Budget DDC for the year 2026-27
C/O Arch of Dever Stones on Link Road near National Highway road leading to Ziyarat Sharief Tapper and Monouments Park Tapper District Baramulla Pyt. Takiya Tapper . block. Pattan under CDF Hble MLA year.2026-2027
please read boq
Please Refer BOQ
Please Refer BOQ
please refer boq
Restoration of of PMGSY Division Budhal on emergency basis(Motorable paths only) by way of clearance of snow likely to occur during financial year 2023-24 on i. Darhal to Chowkian Package No JK12 135 ,Length 5.00 Km
Please Refer to BOQ.
Please refer in BOQ
please refer BOQ
Permanent Restoration of road from Badhole to Romain Package No. JK14-595, Length 4.425 km Block-Ramnagar , District-Udhampur
Permanent Restoration of road from Ther to Pachote JK14317
Providing and Laying of Renewal Coat BBarmeen Bridge to Satyalta Khas JK14283 BlockGhordi Distt Udhampur
Preparartion of DPRs including Road Survey Traffic Survey with automatic traffdic counter Soil Investigation and vetting of DPRs sub division Ghordi
Permanent Restoration on road from BB Chenani to Dalsar Khas Pkg No JK14 505
I) Permanent Restoration of road from Sunetar khas to Dhanwalt Pkg No JK14-351, Length 11.700 km Block-Perli Dhar II) Permanent Restoration of road from Lower Marta to Sunetar Khas Pkg No JK14-482, Length 6.00 km Block-Ramnagar
Providing and Laying of Renewal Coat road from Chak to kalta JK14361 Block Udhampur District Udhampur
Permanent Restoration of road from Kirmoo to Plassian Package No. JK14-7008, Length 7.500 km Block-Ramnagar, District-Udhampur
please refer in BOQ
Supply and erection of crash barriers on Package Nos JK14310JK14313JK14504
Providing and Laying of Renewal Coat on road from Darsoo to Gudhar Part II Package No JK14379 Phase VIII Stage II Block and District Udhampur Length 6.70 Kms
Permanent Restoration of road from Kulwanta Block Boundary Ramnagar to Joffer-1 Package No. JK14-246, Length 10.600 km Block-Kulwanta, District-Udhampur.
Providing and Laying of Renewal Coat Barota to Lerh Khas JK14270 BlockGhordi Distt Udhampur