Loading…
Loading…
1,906 results • Best match
SH Providing and laying renewal coat with BC in Km. 0/00 to 2/00 and 4/00 to 5/00 and 2.5mm thick 10cm wide thermoplastic paint.
P/L G-III in patches and p/L bitumen concrete 30mm thick in kms 0/0 to 1/0 including paver block, thermoplastic strips in various reaches
Providing and laying renewal coat by providing 25mm thick Bituminous concrete and thermoplastic edge line in km. 0/00 to 1/00 and 4/00 to 5/690
Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 1/450 to 2/000, 5/000 to 5/545)
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 2/0 to 3/0 including paver block, thermoplastic strips in various reaches
Providing and laying 25mm thick Bituminous concrete and thermoplastic paint in K.M. 21/0 to 22/0, 23/0 to 24/0 and 26/0 to 27/0
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 1/0 to 2/0 including paver block, thermoplastic strips in various reaches
P/L 30mm thick bituminous concrete km 5/00 to 8/00 i/c interlocking paver block at RD 6/195 to 6/245 and Thermoplastic paint strips)
P/L G-III in patches and P/L bitumen concret 30mm thick in kms 0/0 to 3/700 including paver block, thermoplastic strips in various reaches
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 1/0 to 2/0 and paver block, thermoplastic strips in various reaches
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,3/00 to 4/00
Providing and Laying BUSG for correction layer, Bituminous concrete in kilometre6-0 to 10-0,Providing Laying Hot applied Thermoplastic edge line and const of hill side drain
P/L 30mm thick bitumen concrete, PCC drain, missing Km. stone and 2.5mm thick applied thermoplastic strip. km. 0/0 to 1/0 , 2/0 to 3/0
SH PL 30mm thick Bituminous concrete, Wet Mix Macadam WMM Priming coat and Tack coat and Providing and applying thermoplastic layer in km 0 0 to 3 740
Construction W-Beam railing on RD145/100 to 145/200,145//440 to 145/990, 145/550 to 145/600, 145//760 to 145/825, 145/845 to 145/952, 145/952 to 146/180, 146/520 to 147/045, 147/060 to 147/270, 147/390 to 147/870, 147/945 to 148/105, 148/265 to 148/3
) (SH- Repair of pot holes with bituminous macadam and providing 10Cm wide road marking and 30mm thick bituminous concrete in Km 1/0 to 2/0, 6/0 to 7/0 and 7/0 to 7/800)
ROFD, Protection work, Cross Drainage work, MT road side drain, Road Safety work and dumping Site) km 0/0 to 2/570 under NABARD RIDF-XXX
P/L bituminous concrete 30mm thick in G-III in pot holes, interlocking paver block ISI marked , thermoplastic paint contra/edge line in kms 1/0 to 2/500
P/L 30mm thick bituminous concretae in km 0/000 to 2/000 i/c interlocking paver block at km 0/00 to 0/087 and Thermoplastic paint strips)
Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 0/0 to 0/800 and 0/0 to 0/600
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 8/00 to 9/00 and 9/00 to 10/00
SH- Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 2/000 to 2/600, 1/000 to 2/000
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 0/00 to 1/00 and 1/00 to 2/00
Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 4/00 to 4/390 and 1/000 to 1/450 )
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 4/000 to 5/000 and 5/000 to 5/800 ).
SH -Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 2/000 to 3/000, 3/000 to 4/000
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 6/00 to 7/00 and 7/00 to 8/00
Providing and laying built-up spray grout, Tack Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 13/0 to 14/0 and 18/0 to 19/0)
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 0/00 to 1/00 and 2/00 to 3/00
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 2/00 to 3/00 and 5/00 to 6/00
SH -Providing and laying 25mm thick seal surfacing with plastic waste using hot mix plant and paver finsher and hot thermoplastic compound in km 0/000 to 1/000
P/L 30mm thick bituminous concrete in km 4/000 to 5/200 i/c interlocking paver block at km 4/310 to 4/365 and Thermoplastic paint strips)
SH. Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,1/00 to 2/00
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 10/700 to 11/00 and 11/00 to 11/300
Providing Renewal coat by 25 mm thick Bituminous concrete a/w hot applied thermoplastic compound 2.50mm thick edge line in km 5/00 to 6/00). AMP-2025-26
SH Providing and laying renewal coat with BM 30mm thick bitumen concrete at RD 156/750 to 157/0, 157/0 to 158/0, 160/0 to 161/0 and 162/0 to 163/0 and road marking).
SH Providing and laying pot hole, periodical maintenance Km. at Rd. 0.0 to 2.0 and 5.00 to 6.500 and 2.5 mm thich road marking strips (retro reflective ) Km. 2.0 to 5.0 and 5.0 to 6.500)Under PMGSY incentive
C/o Earth Work, Protection work, V-Shape Drain, Metalling and Tarring, Paver blocks and Road Safety works in km 5/000 to 7/475) Under MMSY.
SH P L Bituminous concerete 25 mm thick unlined drain and providing and applying thermoplastic centere line and edge line and Zebra crossing in K.M 67/0 to 68/0
Providing and laying renewal coat using 25 mm thick BC in KM.0/00 to 2/00 and 2.5mm thick (10cm wide) Thermoplastic paint i/c 5 years routine Maintenance
Providing and laying BUSG for correction layer, bituminous concrete in km3-0 to 5-0 providing and laying hot applied thermoplastic edge line and construction of PCC Hill side drain
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound 0/0 to 2/490 including 5 year routine maintenance after completion of work
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 8/0 to 9/0 and 9/0 to 10/0
Providing and laying renewal coat using 25 mm thick BC in KM.0/00 to 2/00 and 2.5mm thick (10cm wide) Thermoplastic paint i/c 5 years routine Maintenance
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 7/0 to 8/0 and 8/0 to 9/0
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound 0/0 to 1/510 including 5 year routine maintenance after completion of work.
P/L G-III in patches and P/L of work bitumen concrete 30mm thick in kms 0/0 to 3/0 including paver block, thermoplastic strips in various reaches.
AMP for 2020-21 for Barotiwala Gunai road SH P/L renewal coat by provding 30 mm thick bituminous concrete thermoplastic edge line in km 13/0 to 14/0
SH - Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 0/000 to 1/000 and 1/000 to 2/000
SH - Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 0/000 to 1/000 and 1/000 to 2/000