Loading…
Loading…
1,906 results • Best match
(Sub Head- Providing and laying built-up spray gout, Tack coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km 3/0 to 4/0).
(Sub Head- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km. 2/000 to 3/000)
(Sub Head- Providing and laying built-up spray gout, Tack coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km 4/0 to 5/0).
P/L 30mm thick bituminous concrete in Kms. 4/0 to 5/0 including 80mm thick ISI marked interlocking paver block and thermoplastic paint strips.
(Sub Head - Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km. 32/000 to 34/300)
(Sub Head- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 60/000 to 65/000).
Providing and laying Bitumen concrete Thermoplastic edge lining, Zebro crossing in Km. 0/0 to 0/726 and C/O PCC drain 100 mtrs. Length).
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 3/0 to 4/0 including paver block thermoplastic strips
SH- Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot applied thermoplastic compound 2.5mm in km 0/000 to 0/600
(SH-Providing renewal coat at R.D. 8/00 to 9/00,11/00 to 12/00 and 14/00 to 17/00 Providing and applying 2.5mm thick road marking strips (retro-reflective) (Under Village Road)
SH C/O 5/7 metre wide road formation cutting, hume pipe culverts R/Wall B/Wall V-Shape drain Parapets, Metalling/Tarring Sign board and road marking etc 0/0 to 2/500
Providing and laying 25mm thick Mix seal surfacing and road marking in K.M. 5/0 to 6/0, 6/0 to 7/0, 7/0 to 8/0 and 8/0 to 8/500
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat Road Side V Shape Drain and Providing and applying thermoplastic layer
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 4/0 to 5/0 and 5/0 to 6/0
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 0/0 to 1/0 and 1/0 to 2/230
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 including 80mm thick ISI marked interlocking concrete paver block and thermoplastic paints strips.
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 53/0 to 54/0 and 54/0 to 55/0
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 0/0 to 1/0 and 1/0 to 1/450
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 0/0 to 1/0 and 1/0 to 2/0
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 1/0 to 2/0 and 2/0 to 2/200
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 3/0 to 4/0 and 4/0 to 5/0
(SH P/L Tack coat 30 mm Bituminouse Concrete and Thermoplastic Layer on Link road to Village Baloh L-033 KM 0/00 to 1/200.
Providing and laying 30mm bituminous concrete, thermoplastic paint in Km. 94/000 to 95/000, 100/0000 to 101/000 and 101/000 to 102/000
Providing Renewal coat by 25 mm thick Bituminous concrete a/w hot applied thermoplastic compound 2.50mm thick edge line in km 1/00 to 3/00).
Providing Renewal coat by 25 mm thick Bituminous concrete a/w hot applied thermoplastic compound 2.50mm thick edge line in km 0/00 to 2/00).
Providing Renewal coat by 25 mm thick Bituminous concrete a/w hot applied thermoplastic compound 2.50mm thick edge line in km 0/00 to 1/700).
SH- P/L 25mm thick bituminous concrete with hot applied thermoplastic compount paint paver block PCC drain in Km 0/0 to 1/00 under PDNA
SH Providing and laying pot hole, periodical maintenance Km. at Rd. 12.0 to 13.0 and 17.0 to 18.0 and 2.5 mm thick road marking strips (retro reflective ) Km. 12.0 to 13.0 and 17.0 to 18.0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 2/000 to 3/000
P/L 30mm thick bituminous concrete in kms 1/0 to 2/0 including G-III in patches interlocking paver block, C/O drain and thermoplastic strips.
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 6/000 to 6/600
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 including G-III in patches interlocking paver block, C/O drain and thermoplastic strips.
P/L G-III in patches and P/L of work bitumen concrete 30mm thick in kms 2/0 to 3/0 including paver block, thermoplastic strips
SH- Providing and laying 25mm thick bituminous concrete WBM G-III and thermoplastic paint in Km 16/00 to 17/00 and 17/00 to 18/00
SH P/L Tack coat 30 mm Bituminouse Concrete and Thermoplastic Layer on Link road Baffirin Khandera Via Harner VR-056 KM 0/00 to 1/500
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 3/000 to 4/000
P/L 25mm thick bituminous concrete and Thermoplastic line in Km 15/00 to 16/00, 16/00 to 17/00 and 17/00 to 18/00
Providing and laying renewal coat using Bituminous Concrete 25mm thick i/c rectification of surface and Thermoplastic Paint Strip between KM RD 0/0 to 7/0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 4/000 to 5/000
SH- Providing and laying 30mm bituminous concrete, thermoplastic paint in Km. 62/0000 to 63/000, 68/000 to 71/000 and 83/000 to 85/000.
P/L 30mm thick bituminous concrete in kms 2/0 to 3/0 including G-III in patches, interlocking paver block, C/O drain and thermoplastic strips.
SH Providing and laying renewal coat with BC Km. 8/00 to 10/00 and 13/0 to 14/0 and 2.5mm thick 10cm wide thermoplastic paint.
SH Providing and Laying Tack coat 30mm Bituminious concrete and thermoplastic layer on PMGSY roads 1 Hamirpur to Baru road Km 0/0 o 1/0 HP0306VR002910101
SH bituminous concerete unlined Drain and providing and applying thermoplastic center and Edge Line in KM 3 0 to 4 0 and 6 0 to 8 0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 5/000 to 6/000
Formation cutting for 5/7 mtr wide, R/walls, B/walls , CD, M/T, V-Shape drain ,Parapets and road signages road furniture etc. in Km 0/00 to 1/190 i/c 1 No bridge over Muttarad at Rd 0/695) (under Nabard RIDF-XXX) including routine maintenance
(SH - Providing and laying 25 MM thick Bitumen concrete laying with paver finisher, Road marking strips of hot applied theromplastic compound (Painting line) between Km 7/00 to 8/00 and 9/00 to 10/00)
SH Providing and laying pot hole, periodical maintenance Km. at Rd. 3.0 to 6.0 and13.0 to 15.0 and 2.5 mm thick road marking strips (retro reflective ) Km. 3.0 to 6.0 and 13.00 to 15.0)under MDR
(SH - Providing and laying 25 MM thick Bitumen concrete laying with paver finisher, Road marking strips of hot applied theromplastic compound (Painting line) between Km 19/00 to 20/00 and 20/00 to 21/00)
Providing and Laying patch work, Maintenance of drain and Maintenance of berms, 25 mm thick Bituminous concrete and thermoplastic paint line between km. 0/00 to 6/00).