Loading…
Loading…
1,906 results • Best match
SH- Providing and laying 30mm thick bituminous concrete alongwith providing and laying hot applied thermoplastic compound 2.50 mm thick edge line in Kms. 0/0 to 7/0 ) Under AMP MDR for the year 2023-2024 PMGSY incentive
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 to 2/00) Under Addl. KMS. AMP. 2024-25.
Providing and Laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 2/770 to 4/00 and 4/690 to 4/750).
Providing and laying built-up spray grout, tack coat, bituminous concrete 30mm thick and thermoplastic strip in km. 0/00 to 1/00, 2/00 to 3/00, 5/00 to 6/00, 6/00 to 7/00).
SH P/L Tack coat 30 mm Bituminouse Concrete and Thermoplastic Layer on 1 Bhota Tal Via Shidhpur road VR-092 KM 2/00 to 3/00. 2 Bhira Halana road VR-043 KM 0/00 to 2/00
SH- Providing and laying 30 mm thick Bituminous Corncrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 11/00 ) under AMP for FY 2023-24
AMP for the year 2022 23 on Patta Goela Chhachi road in Km 0 00 to 19 500 SH P/L Renewal coat by Providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 11 00 to 13 00
Annual Maintenance Plan for the year 2023 24 on Patta Beja Masoolkhana road in Km 000 to 17 500 SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km. 500 to 8900
Providing and Laying G-III, built-up-spray grout, tack coat, bitumenious concrete 25mm thick and thermoplastic strip in km. 12/00 to 13/00,13/00 to 14/00,14/00 to 15/00 and 15/00 to 16/00).
Annual Maintenance Plan for the year 2022-23 on DharampurKasauli Road MDR-10 in Km 000 to 10735 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 6 00 to 10840
SH Providing and laying 30 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 to 3/00 ) under AMP for FY 2023-24
Annual Maintenance Plan for the year 2022-23 on Barotiwala to Gunai road in Km 000 to 19 120 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 800 to 900
Annual Maintenance Plan for the year 2022-23 on Bhojnagar Chakki Ka More road in Km 000 to 1400 SH Providing and Laying Renewal coat by Providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 1200 to 1400
Providing and Laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 thick for edge line in between km. 5/00 to 7/330) Addl. Kms under AMP 2025-26 Village Road.
Repair to Parwanoo Khadeen Banasar road in Km. 0/00 to 13/190.(SH P/L renewal coat by Providing 25mm thick Bituminous Concrete and Thermoplastic edge line in Km. 12/240 to 13/186)DC Deposit.2nd call
Providing and laying 25mm thick Bituminous concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00) Addl. Kms under AMP 2025-26 village road.
Excavation in earthwork, C/o B/walls, C/o R/walls, CD works (HPC), V shape road side drain, parapets Etc, P/L GSB, Gr-II, Gr-III, Metaling and Tarring works, P/L logo board, P/F km stone (ordinary km stone, 5th km stone, 200m stone) and road marking
Link road Lower Broha to Upper Baroha VR-133 KM 0/00 to 0/750. 2 Link road to Village Dugha Chowki VR-135 KM 0/00 to 0/250. 3 Link road from Kisan Bhaban Broha to Dugga Kallan VR -187 KM 0/00 to 0/800. Link road Harson to Langwan to V
Annual Maintenance Plan for the Year 2023 24 on Barotiwala Gunai road and Masoolkhana to Labour Shed Colony Tharugarh road SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 700 to 800, 90
Annual Maintenance Plan for the year 2021-22 for Barotiwala to Gunai road SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 3/760 to 5/00 6/00 to 7/00
AMP plan for the year 2020-21 for Bhatt Ki Hatti Rampur road in km 13/00 to 22/30SH P/L renewal coat by Providing 30 mm thick Bituminous concrete thermoplastic edge line in km 13/00 to 22/300
Annual Maintenance Plan for the year 2026-27 on Patta Joharji road in Km. 0/00 to 8/00.(SH P/L Renewal coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 5/00 to 7/00)
SH- Providing and laying 30 mm thick Bituminous Concrete along with providing laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/000 to 2/825 ) under AMP Village Road for FY 2023-24.
Annual Maintenance Plan for the year 2022-23 on ParwanooGadyar road in Km 0 00 to 13 795 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 2 00 to 5 00
Providing and laying 25 mm Thick Bituminous concrete, Penetration, A/W hot applied thermoplastic compound, 2.50 mm thick for edge line on km 0/00 to 1/00 and 1/00 to 1/790) Village road (Under AMP 2024 - 2025)
AMP for the year 2022 23 on Deothi Delgi Via Koon road in Km 0 00 to 10 500 SH P/L renewal coat by providing 30mm thick Bituminous concrete thermoplastic edge in Km 3 00 to 4 00 IInd call
P/L 30 mm thick bituminous concrete in km 0/000 to 2/000 i/c interlocking paver block at km 0/490 to 0/515 ,1/020 to 1/070 and 1/560 to 1/570 and Thermoplastic paint strips)
SH-Providing and laying 30 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/240 under approved AMP for the FY- 2021-22
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 3/000 to 3/600 ) Add. Kms. under AMP 2025-26- Village Road
Annual Maintenance Plan for the year 2025-26 on Barotiwala to Gunai road in Km. 0/00 to 19/120.(SH PL renewal coat by providing 25mm thick Bituminous Concrete and thermoplastic edge line in Km. 10/00 to 10/300)
AMP plan for the year 2020-21 for Shaktighat Bandh Road VR116 MRL SH P/L renewal coat by providing 30 mm thick bituminous concrete thermoplastic edge line in km 0/0 to 3/0 and 5/0 to 6/0
AMP for the year 2021-22 for for Old N H TTR to Parwanoo road km 62/200 to 67/200 SH P/L renewal coat by providing 30mm thick B C thermoplastic edge line km 62/200 to 67/200
Special repair to Parwanoo Kasauli Dharampur Subathu Solan MDR 06 road in Km. 000 to 57320 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km 000 to 400 Under NHAI Deposit 3rd call
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 TO 2/600) ( under approved AMP for the FY- 2020-21)
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 3/00 to 4/700) ( under approved AMP for the FY- 2020-21 )
AMP for the year 2020-21 for Patta Beja Masulka road in km 0/0 to 17/500 SH P/L renewal coat by Providing 30 mm thick Bitumenious concrete thermoplastic edge line in km 3/0 to 4/0
Annual Maintenance Plan for the year 2021-22 for kimmughat Dak Bangla road in Km. 0/00 to 0/700 SH Providing and laying renewal coat by providing Premix carpet thermoplastic edge line in Km 0/00 to 0/700
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 3/000 to 4/000 ) Add. Kms. under AMP 2025-26- Village Road
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 TO 3/270) ( under approved AMP for the FY- 2020-21 )
Providing and Laying 25mm thick Bituminous Concrete in Km. 0/00 to 1/00 along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 0/00 to 1/00) Under AMP 2025-26
Annual Maintenance Plan for the Year 2023-24 on Jandhuri to Pratha road in Km. 000 to 800 SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 300 to 500Under PMGSY. 2nd call
Providing and Laying 25mm thick Bituminous Concrete in Km. 0/00 to 0/650 along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 0/00 to 0/650) Under AMP 2025-26.
Sh-Providing and laying 30 mm thick Bituminous Corncrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 2/00 to 4/00 ) under AMP PMGSY for FY 2022-23
SH Providing and laying 30mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 7/00) Additional Kms under PMGSY Financial Incentive F.Y. 2023-24
Annual Maintenance Plan for the year 2021 22 for garkhal to Ghai road in km 0/0 to 6/200 SH P L renewal coat by providing 30mm thick B C thermoplastic edge line in km 0/0 to 2/00
AMP for the year 2022-23 on Parwanoo Kasauli Dharampur Subathu Solan road MDR 06 in Km 000 to 58320 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 5500 to 5700
SH Providing and laying 30mm thick BC V-Shape Drain Thermoplastic Edge Line in i Link road Mandetar T-3 to Manjhot Km. 4/0 to 7/0. ii Link road Chhamehar to Sadwan Km. 1/0 to 2/0
Annual Maintenance Plan for the year 2020 21 for Parwanoo Gadyar road SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 0/00 to 2/00 Under NABARD VR0155 Substituted from Old Kalka
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/000 to 1/000 ) Add. Kms. under AMP 2025-26- Village Road
C/o Passing Places, Retaining Walls, Missing Cross Drainage, Side Drains, CC Pavements, Road Safety Measure, Place of Identification Sign Boards, Protection Work, BM and Tarring including routine maintenance for five years after completion c/o work