Loading…
Loading…
1,906 results • Best match
Annual Maintenance Plan for the year 2026-27 on Chaila Sainj Yashwant Nagar Oachghat Sultanpur Kumarhatti road in Km. 75/375 to 86/450.(SH P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 8100 to 84/00)
Annual Maintenance Plan for the Year 2025-26 on Shalaghat Arki Kunihar Barotiwala road in Km. 26/00 to 70/00.( SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km.3100 to 3200 32300 to 340
Annual Maintenance Plan for the Year 2023 24 on Dharampur Kasauli Cart road MDR 10 and Gandhi Gram Tarol via Green Hills road SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 200 to 600 an
Annual Maintenance Plan for the Year 2025-26 on Patta Goela Chhachhi road and Patta Kownta Dhamreu Kiyar link road.(SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km.15/00 to 16/00 17/00
Providing and laying 30 mm thick Bituminous Corncrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/00 and 5/00 to 7/00 ) under AMP for FY 2023-24
Annual Maintenance Plan for the year 2026-27 on Jandhori to Pratha Nabon road in Km. 0/00 to 8/00.(SH P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 5/00 to 7/00) Under PMGSY
Annual Maintenance Plan for the year 2022-23 on Bhatt Ki Hatti Kuthar Rampur road in Km 0 00 to 22 300 SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 0 00 to 4 00
Annual Maintenance Plan for the Year 2025-26 on Garkhal to Dewari road in Km. 0/00 to 1/200.( SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km. 0/00 to 1/200)Under PMGSY
Providing and laying built-up spray grout, tack coat, bituminous concrete 30mm thick and thermoplastic strip in km. 1/00 to 2/00, 2/00 to 3/00, 3/00 to 4/00, 4/00 to 5/00 and 5/00 to 6/00).
SH ROFD, Protection of works, CD works Metalling Tarring, V-Shape drain, Parapets, road safety, Kilometer stone, irrigation crossing and dumping site at RD.0/0 to 5/440 (including five year maintenance) under PMGSY-III Batch-1 for the year 2023-24
Improvement and Strengthening of Kimmughat to Chakki Ka Mod road in Km 0/00 to 16/380(SH Removal of Formation deficiency Retainning Structures PL Cross drainage works, PL GSB WMM, Tarring road side drain, CO Parapets sign boards and road safety work
Annual Maintenance Plan for the the year 2024-25 on Gandhi Gram Tarol via Green Hills in Kms 0/00 to 5/750 (SH P/L renewal coat by providing 25mm thick Mix Seal Surfacing (Type-B), thermoplastic edge line in Km 3/00 to 4/00)
Annual Maintenance Plan for the Year 2025-26 on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/320.(SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km. 4/00 to 6/00, 8/00
SH P/L 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat, Tack coat and thermoplastic layer on VR Road 1 Janni Jaggian to Kunna road km 0/0 to 1/500 2 Link road to village Dobbar Kalan km 0/0 to 1/0
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/00 and 9/00 to 11/200) (under approved AMP for the FY- 2020-21)
Annual Maintenance Plan for the Year 2024 25 on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 58/320 (SH Providing and Laying renewal coat by providing 25mm thick Mix Seal Surfacing, thermoplastic edge line in Km 46/00 to 50/00 and 52/
Annual Maintenance Plan for the year 2021 22 for Patta Joharji road in Km 0 00 to 8 00 SH Providing and laying G III and renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 7 00 to 8 00 Under PMGSY
Annual Maintenance Plan for the year 2021 22 for Parwanoo Kasauli Dharampur Subathu Solan road MDR 06 in Km. 0/00 to 57/100 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km. 32/00 to 34/00
Annual Maintenance Plan for the year 2026-27 on on Gandhi Gram Tarol via Green Hills road in Km. 0/00 to 6/510.(SH- P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 0/00 to 3/00)
Annual Maintenance Plan for the Year 2025-26 on Kheel Ka More Subathu road in Km. 0/00 to 6/765.( SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km.5/00 to 6/765)UNDER PMGSY
Annual Maintenance Plan for the year 2024-25 on various roads under Kasauli Division(SH P/L renewal coat by providing 25mm thick Mix Seal Surfacing (Type-B), thermoplastic edge line on link road to Village Nahari in km 0/00 to 2/250 Shaktighat to Ban
Special repair to Old NH-22 to TTR in Km 62/200 to 67/200 (SH Providing and Laying renewal coat by providing 50mm thick BM with 30mm thick Bituminous Concrete and thermoplastic edge line in Km. 62/200 to 64/00)Under NHAI Deposit 2nd call
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 3/00 and 7/00 to 8/100 )(under approved AMP for the FY- 2020-21 )
SH-Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 16/300 TO 17/500 and 18/500 to 20/000) under approved AMP for the FY- 2020-21
Annual Maintenance Plan for the year 2024-25 on link road to Village Jagjitnagar in Km. 0/00 to 1/200 (SH P/L renewal coat by providing 25mm thick Bituminous concrete and thermoplastic edge line in Km. 0/00 to 1/200)Additionality 2024-25.2nd call
SH-Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 10/00 TO 11/00 and 13/00 to 15/00) under approved AMP for the FY- 2020-21
Annual Maintenance Plan for the Year 2025-26 on Shalaghat Arki Kunihar Barotiwala road in Km. 26/00 to 70/00(SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km54/00 to 56/00, 63/00 to 640
Annual Maintenance Plan for the year 2021-22 for link road from Subathu to SAKB via Radiana in Km. 0/00 to 2/700 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 0/00 to 2/700
Annual Maintenance Plan for the year 2024 25 on Patta Goela Chchachi road in Km 0/00 to 20/00 (SH Providing and Laying renewal coat by Providing 25mm thick Bituminous concrete and Thermoplastic edge line in Km 13/00 to 15/00)Additionality 2024 25
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/700 to 3/000 and 5/000 to 5/700 ) Add. Kms. under AMP 2025-26- Village Road
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/600 and 0/640 to 1/0 I/c 80 mm thick ISI marked paver block at RD 0/600 to 0/640 and u-shape drain in kms. 0/520 to 0/545 and thermoplastic strips
AMP for the year 2020-21 for Johar ji Mallah road in km 0/0 to 27/465 SH P/L renewal coat by Providing 30 mm thick bitumenious concrete thermoplastic edge line and C/O V-shape drain in km 13/0 to 23/600 under PMGSY
Annual Maintenance Plan for the year 2026 27 on Patta Beja Masoolkhana road in Km. 0/00 to 17/500.(SH P/L Renewal coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 0/00 to 3/00 and 80mm thick interlocking tile pavem
Annual Maintenance Plan for the Year 2025-26 on Barotiwala to Gunai road in Km. 0/00 to 19/120.(SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km.7/00 to 8/00 and 9/00 to 10/00)
Annual Maintenance Plan for the Year 2024 25 on Shalaghat Arki Kunihar Barotiwala road in Km 26/00 to 70/00 (SH Providing and Laying renewal coat by providing 25mm thick Mix Seal Surfacing, thermoplastic edge line in Km 26/00 to 29/00 and 32/00 to 32
Providing and laying WBM, G-III, priming coat, tack coat, 25 mm thick bituminious concrete, Thermoplastic paint Rissa Surangari Bhaderwar via Grroru road KM 0/00 to 1/00 and P/L 20 mm thick premix carpet with seal coat on Thona to Gehra road KM 0/00
Annual Maintenance Plan for the Year 2024 25 on Shalaghat Arki Kunihar Barotiwala road in Km 26/00 to 70/00 (SH Providing and Laying renewal coat by providing 25mm thick Mix Seal Surfacing, thermoplastic edge line in Km 44/00 to 46/00, 47/00 to 50/00
AMP for the year 2026-27 on Joharji Mallah road in Km. 0/00 to 27/460(SH P/L renewal coat by providing 30mm thick bituminous concrete and thermoplastic edge line in km. 0/00 to 2/00 and 80mm thick interlocking tile pavement at slusly reaches
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/230 and 0/270 to 1/0 and 80 mm thick ISI marked paver block at RD 0/230 TO 0/270 AND U-shape drain in kms. 0/080 to 0/120 and thermoplastic strips
Annual Maintenance Plan for the year 2026-27 on on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/320.(SH P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 19/00 to 21/750, 24/200 to 25/
AMP for Village Roads for the year 2025-26 on link road to Rest House Kalol Km 0/0 to 0/450 (SH-Providing and laying 25 mm thick (BC) Bituminious Concrete on link road to Rest house Kalol Km 0/0 to 0/450 and P/L Hot applied Thermoplastic).
Annual Maintenance Plan for the year 2021-22 for Patta Goela Chhachhi road in Km. 0/00 to 19/500 SHProviding and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 0/00 to 1/00, 4/00 to 5/00, 16/00 to 1
Periodical renewal and maintenance of Garkhal to Subathu road in Km. 0/00 to 17/315.(SH Scarifying, P/L GSB, WMM,WBM, G-III, BM, at various Rds and P/L 25mm Bituminous Concrete along with thermoplastic edge line in Km. 0/00 to 16/00)Under PMGSY incen
Annual Maintenance Plan for the year 2026-27 on on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/320.(SH- P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 45/00 to 46/00 and 49/00 to 5
Providing and laying WBM G-III, priming coat, tack coat, 25 mm thick bituminiun concrete, Thermoplastic paint on Patti to Dawardu road KM 0/00 to 3/00, Nabahi to Materi road ( Nabahi to Baldwara Materi) KM 0/00 to 3/00, Behna to Daroli road KM 1/00 t
Periodical renewal and maintenance of Garkhal to Gahi road in km 0/00 to 6/300 (SH scarifying , P/LWBM Gr-II, WBM Gr-III, BM at various RDs and P/L 25 mm thick bituminous concrete along with thermoplastic edge line in km 0/00 to 6/300) Under
Upgradation of Groni to Sari road via Bohron in Km 0/00 to 6/510 (SH Formation cutting Retainning Structures PL Cross drainage Works PL GSB WMM, Tarring C O Parapets sign boards, and road safety works etc in Km 000 to 6/510)Under NABARD RDIF-XXX