bidders are requested to read the tender terms and conditions carefully Bidders are requested to read the tender terms and conditions carefully
As per Scope of Work, Terms and Conditions of the tender Ok
Pl refer the attached NIT for the detailed scope and specifications
Please upload valid BPCL registration certificate
PBG- Applicable as per scope of work.
Routine Maintenance of Bay Control Unit based distributed architecture type Control and Relay Panels along with Substation Automation System with yard AC Kiosk arrangement in 400/220/132kV Substation, GRP, SES of 5X200MW, BTPS, Obra, Sonebhadra.
3500 FRAME, ESC 40A BCHELI, 5400 MAH 4S, PIX HAWK, GPS MSN, STAND, ANTIVIBRATION, FS 96, TELEMETRY, B6 AC, DJI BLDC, PKT SELL LOCK, POWER MODULE, PROPELLER
Tender for completion of OPGW connectivity of 66kV sub- station Hulli and HPPTCL, s 400/220/66kV sub station Pragatinagar (Gumma) for establishing telemetry to SLDC, Shimla.
Supply of Complete DCS PLC System for PFCCU revamp as per MR Sr. No. 1.0001, Site work for Complete DCS PLC System for PFCCU revamp as per MR Sr. No. 2.0001, Transportation for Complete DCS PLC System for PFCCU revamp as per MR Sr. No. 3.0001, ... DCS PLC System ...
Work of Scada and Gateway Maintenance for the SLDC Communication at 220 KV S/S Chhata Under ETD Mathura
Renovation of existing building for Mahananda SCADA automation located at Fulbari, Block - Rajganj, District - Jalpaiguri under National Hydrology Project
Configuration integration of 132 KV Bharwari Feeder-I II in existing CGL make SCADA at KV S/S Sirathu.
For configuration CPT cum Gateway in the existing ZIV make SCADA system installed at 220 KV SS Sirathu Kaushambi
SCADA Integration Work of 01 No. Pepsico Bay at 132 KV Sub-Station Kosi-Kalan UPSIDC Under ETD Mathura
Temperature Gauge for IDBH 150mm (Q3), Thermowell for SCADA RTD (Q3), Temperature Gauge for Heater Treater with thermowell (Q3)
Work of Providing and Fixing of USB KVM Exender for SCADA HMI at 400 KV Sub-Station Manth Mathura
Manufacture, testing, supply and delivery of 12 KV SCADA Compatible Shunt Trip Switchgear Panel with VCB with different combinations.
Construction of OHT, Rising Main, Pipeline, Tubewell, Pumphouse, Staff Quarter House Connection SCADA and other releated work etc. complete
Implementation of SCADA system at Intake and WTP sites of AIIMS Water Supply Scheme in the District of Nadia.
CLEANING AND SWEEPING OF M.D. RESIDENCE, CZE OFFICE, SCADA BUILDING AND COLONY AREA AT VIDYUT NAGAR, HYDEL COLONY, VARANASI.
REPAIR AND SERVICING OF SCADA SYSTEM OF SIEMENS MAKE INSTALLED AT 220 KV S/S MAHOBA UNDER ETD HAMIRPUR
Procurement of SCADA Materials for maintenance of SAS installed at 132 KV S/S Katghar Mahloo, Under ETD Mau
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM SCADA FOR SUBSTATIONS AT NFC KOTA RAJASTHAN
Construction of TW, OHT, CWR, Pump House, Staff Quarter, MCS Room, Laying of Distribution System, Rising Main, SCADA etc
Implementation of SCADA and DMS/OMS works in Faridabad and periphery of Gurugram Under Revamped Distribution Sector Scheme (RDSS)
SCADA integration of 33 KV Dhottar bay at 132 KV S/Stn. Khairekan, District Sirsa - work for SAS integration
Comprehensive maintenance of SCADA arrangement at OHR-1 to 8 in AA-I at New Town under NTK Project.
TAP POSITION INDICATOR (TPI) -MINIMUM 17 POSITION WITH 4-20 mA, Scada output, 110/230 V AC, 50 Hz
TAP POSITION INDICATOR (TPI) WITH DUAL 4-20 MA OUTPUT, SUITABLE TO SCADA 110/230 V AC, 50 HZ
ENGINEERING PROCURMENT, SUPPLY & INSTALLATION OF SCADA COMPATIBLE BOOSTER PUMP AT VARIOUS ESR WITH 03 MONTH TRIAL RUN.(2nd Call)
Custom Bid for Services - NON-COMPREHENSIVE AMC, PLC SYS, Qty 8 Man Day, Custom Bid for Services - EMERGENCY VISIT, PLC SYSTEM, Qty 8 Man Day Similar Category Customized AMC/CMC for Pre-owned Products Customized AMC/CMC for Pre-owned Products
Incomer, MCC Panel, PLC Panel, Drive Panel and Operator desk for Plasma - 1 and Plasma - 2 Furnaces.
Watch and ward of PLC panels installed in command area of MU Block Pitampura BPS re invite
Expert Services of UOP India for troubleshooting and fine tuning of PSA PLC units installed in PRPC
Supply, erection and commissioning of 300 TR VAM S7-1200 PLC PANEL FOR VAM MODEL: D212/59
SIEMENS CNC, PLC AND DRIVE UPGRADATION PACKAGE FOR HORIZONTAL BORING MACHINE AS PER ATTACHED ANNEX-1 (Q3)
SINUMEIK 840DSL, NCU 730.3B PN CARD WITH PLC 317-3 PN/DP INCLUDING TWIN FAN MODULE. (Q3)
SUPPLY, DESIGN, ENGINEERING, SUPERVISION COMMISSIONING OF THE PLC SYSTEM FOR H2S MONITORING AT HEAVY WATER PLANT MANUGURu
Supply and burying of safe earthing electrodes for PLC based fully automatic composting machine at MRF center.
Construction of Kadua PLC AWC under Kadua G P under Ramnagar II Panchayat Samity UDISE CODE 19345250223
Design Supply Installation Testing and Commissioning including Documentation for Setting up of Liquid Off take plant with combimation of 2 Arms 8 Cylinders 47.5kg each and VOT system with Automation System for Cafeteria Located in Service Block
Design, Supply, Installation, Testing and Commissioning of Tank Farm Management System for 2 nos. IFR above ground vertical tanks for Ethanol and integration with existing Terminal Automation System and Supply of FLP lights for TW unloading facility
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Annual Maintenance Contract of Emerson make DCS based Automation System for Coke Oven and By Product Plant including its Auxiliaries for a period for Two ..
Prep of Subgrade Scarifying of Bt Surf PLC of GSB 200Mm WMM 150Mm DBM 60Mm Incl PC and BC 40Mm Incl TC as per MoRTH Spec with Rd Marking Earthwork in Embankment and Sand Blanketing 25Mm Bet Km 13 to Km 25 pt 400 on MS Rd Udr 70 RCC Sector of PJT DPK
Installing Monitoring Mechanism with Complete sensors and hardware for automation and digitalization of 1.5 MLD STP with 1 year warranty Flow meter (1 Nos) OCEMS Outlet Level Transmitter (4 Nos) PLC Hooter Panel and accessories Data Logger Router Wiring with one year OandM under Jal Hi Amrut initiative at 1.50 MLD STP in Devarakonda Municipality
PLC of 200 mm CRMB 60 mm DBM and 40 mm BC incl cleaning of road surface and applying PC comma TC and Rd marking for surf wks bet Km 0 to Km 7 net length 7 km on pt 4840 high ground BL Rd under 108 RCC 759 BRTF of Project Deepak in HP
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024