Loading…
Loading…
945 results • Best match
As per Tender documents
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, Tube well, Pump House, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, SCADA automation etc.
Rectification of SCADA installed at 132 KV Substation Saidabad, Under Electy. Trans Division-I, Prayagraj
work of Repairing of Numerical ABB REF615E DRelay SCADA BASED at 132 KV SS Anoopshahr
SCADA REPAIRING AND BAY INTEGRATION WORK AT 132KV SUBSTATION MUSAFIRKHANA UNDER ELECTRICITY TRANSMISSION DIVISION, SULTANPUR
Work of Annual Maintenance of SCADA Based 220 KV Sub- Station Vrindavan under ETD Mathura
OHT Pump House staff quarters SCADA Room Rising Main Feeder main Distribution Network House connection
Rectification of SCADA installed at 132 KV Substation Kaurihar, Under Electy. Trans Division-I, Prayagraj
Custom Bid for Services - Maintenance of 25 KV OHE (Flexible/Rigid overhead catenary system) and Power Supply Installations (ASSs & RSSs) (excluding SCADA) of Uttar Pradesh Metro Rail Corporation Ltd at Lucknow for 03 years Similar Category Customized AMC/CMC for Pre-owned Products Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Annual Operation and Maintenance of SCADA Based 132 KV Sub-Station Kosikalan UPSIDC under ETD Mathura
Providing and Installation of SCADA Gateway at 132 KV SS Sarai Akil, under ETD-IV Prayagraj
YEARLY AND EMERGENCY MAINTANACE OF SCADA SYSTEM AT 220 KV S/S RASARA UNDER ETD BALLIA
Scada associated work as per BOQ at 220 kV substation RC Green under ETD-II Noida
Configuration of standby CPT cum gateway in the existing SCADA system at 132KV S/S Jari
REPAIR WORK OF SCADA AND ASSOCIATED WORKS AT 220KV S/S NEW TANDA UNDER ETD, AYODHYA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmssion Substation; SCADA System; Service Provider
Custom Bid for Services - LUMP SUM PRICE FOR CABLING REVAMP OF SCADA DATA CENTRE AT GAIL JUBILEE TOWER NOIDA INCLUDING GST Similar Category Electric Cabling Service Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network Cluster Outsourcing for Maintenance of Landline and Broadband network Copper wire Non IT Professional Service (version 2)
Work of Annual Operation and Maintenance of SCADA Based 220 KV Sub- Station Maanth under ETD Mathura
Annual Operation and Maintenance of SCADA base 220 KV Substation Malwan, Fatehpur under Electy. Trans. Division-Fatehpur
Manufacturing and erection of suitable indoor type Automatic Power Factor Corrector (APFC) Panel compatible with Scada/IOT
repairing AND rectification work of SCADA system installed at 132 KV SS Sareni Salon under ETD Raebareli
Work of Annual Operation and Maintenance of SCADA Based 220 KV Sub- Station Maanth under ETD Mathura
Procurement of Gateway Suitable for SEL make SCADA system at 220KV S/S Bhadaura Under ETD-Ghazipur
For inspection and rectification of ZIV make SCADA system installed at 220 KV S/S Sirathu Kaushambi
ANNUAL MAINTENANCE WORK
Rectification of Defect of SCADA system ZIV Make installed at 220KV Sub Station Rania under ETD I Kanpur
Work of Annual Operation and Maintenance of SCADA Based 132 KV Sub- Station Sonkh Road under ETD Mathura
Work of Annual Operation and Maintenance of SCADA Based 132 KV Sub- Station Sonkh Road under ETD Mathura
Routine Maintenance of Bay Control Unit based distributed architecture type Control and Relay Panels along with Substation Automation System with yard AC Kiosk arrangement in 400/220/132kV Substation, GRP, SES of 5X200MW, BTPS, Obra, Sonebhadra.
Work of Scada and Gateway Maintenance for the SLDC Communication at 220 KV S/S Chhata Under ETD Mathura
Configuration integration of 132 KV Bharwari Feeder-I II in existing CGL make SCADA at KV S/S Sirathu.
For configuration CPT cum Gateway in the existing ZIV make SCADA system installed at 220 KV SS Sirathu Kaushambi
SCADA Integration Work of 01 No. Pepsico Bay at 132 KV Sub-Station Kosi-Kalan UPSIDC Under ETD Mathura
Work of Providing and Fixing of USB KVM Exender for SCADA HMI at 400 KV Sub-Station Manth Mathura
Construction of OHT, Rising Main, Pipeline, Tubewell, Pumphouse, Staff Quarter House Connection SCADA and other releated work etc. complete
CLEANING AND SWEEPING OF M.D. RESIDENCE, CZE OFFICE, SCADA BUILDING AND COLONY AREA AT VIDYUT NAGAR, HYDEL COLONY, VARANASI.
REPAIR AND SERVICING OF SCADA SYSTEM OF SIEMENS MAKE INSTALLED AT 220 KV S/S MAHOBA UNDER ETD HAMIRPUR
Procurement of SCADA Materials for maintenance of SAS installed at 132 KV S/S Katghar Mahloo, Under ETD Mau
Construction of TW, OHT, CWR, Pump House, Staff Quarter, MCS Room, Laying of Distribution System, Rising Main, SCADA etc
Supply and burying of safe earthing electrodes for PLC based fully automatic composting machine at MRF center.
Supply, Installation, Testing, Commissioning, Training and Maintenance of Complete Automation with SCADA and Electrification of Pahuj Dam, Jhansi, Uttar Pradesh
Work of Configuration of SCADA Gateway Backup data to Modipuram at 132 KV sub Station kosikalan UPSIDC under ETD Mathura
Repairing and restoration of the existing Siemens make SCADA System at 220 KV sub stations Sikandra under ETD I Kanpur
False Ceiling, Roof Treatment, Plaster Repair, Painting and Other Related Civil Works On The First Floor Of SCADA Building, Aligarh.
Work of Gateway Configuration of Siemens make SCADA System installed at 132 KV S/S Sonkh Road under ETD Mathura
Construction of TW, Pump House, Staff Quarter, OHT, laying of distribution and rising main, SCADA, renovation of existing infrastructure etc
Integration of XP95 Facilities in Bay 2 and 4 with necessary modification in the existing TAS software PLC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC OF PLC SYSTEM; Service Provider
Work of Construction and SCADA Integration of 2X10 MVAR Capacitor Bank at 132 KV S/S Sonkh Road Under ETD, Mathura
Construction of OHT Pipeline Rising Main Pumphouse Tubewell SCADA House Connection Staff Quarter Boundary Wall and other releated works etc. complete