Loading…
Loading…
390 live249 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Haryana Government
390 results • Best match
BZADivision-1)Provision of Sewage Treatment plant in compliance to NGT guide lines, APPCB and CPCB at TDD( 100 KLD) & NDD (100 KLD) stations.2)BZA Division:- Provision of sewage Treatment plant in Compliance to NGT guidelines ,APPCB and CPCB at SLO ... of Sewage Treatment plant in ...
Procurement of 02 Nos Open Channel Inlet Flowmeter with Totalizer 01 each for SNH AND DGN Sewage Treatment Plant of PPS 1
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Scientific Operation of Spray pond Overflow Treatment Plant; Under Warranty and functional
Design, Build and Operate Water Treatment Plants at Manali adjoining area, Sewage Treatment Plants at Palampur zone 1, 3, Karsog and Nahan zone 1,2, 3.
Selection of vendor for Operation and Maintenance of Existing Sewage Treatment Plant at Animal Birth Control Centre at Puliyanthope division 77 Zone VI
Selection of vendor for Operation and Maintenance of Existing Sewage Treatment Plant at Animal Birth Control Centre at Kannammapet, Division 141 Zone X
Remaining work of Providing, Supplying & Installation of SEWAGE Treatment Plant, Drilling of Borewell, Providing & Laying External Drainage and Construction of Wire Fencing for STP at PHQ Khutaliya, Chhotaudepur Dist Chhotaudepur (Including Concealed Electrification) [1st Attempt]
OPERATION AND MAINTENCE OF THE SEWAGE TREATMENT PLANT (10.28 MLD) AT MUTHUMANDAPAM NEAR NEW BUS STAND IN VELLORE CITY MUNICIPAL CORPORATION FOR SIX MONTH
Selection of vendor for Operation and Maintenance of Existing Sewage Treatment Plant at Animal Birth Control Centre at Lloyds Road Division 120 Zone IX
Design and Construction of Sewage Treatment Plant (STP) of 5.0 MLD capacity at Sindhi Nallah Section with Interception And Diversion (IandD) works along with Gravity Main works of ITARSI Used Water Management Project under SBM 2.0
Annual operation and maintenance contract for Sewage treatment plant (3.00 MLD) based on SBR technology of Kurasia Sub Area of Chirimiri Area (For Two years)
Operation and Maintenance of Sewage Treatment Plant 3 MLD capacity on SBR Technology at Bassi Pathana for the year 2026 to 2027 (01.09.2026 to 31.03.2027).
INTERCEPTION AND DIVERSION I AND D OF DRAINS AND CONSTRUCTION OF A 12 MLD SEWAGE TREATMENT PLANT STP WITH CO TREATMENT AND ASSOCIATED WORKS IN NAGAR PALIKA PARISHAD MUBARAKPUR DISTRICT AZAMGARH UNDER THE SBM U 2.0 PROGRAMME
Custom Bid for Services - 200153808 Operation of pumps & motors at sewage pumping station at NTPC Kahalgaon Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Construction of 10KLD Faecal Sludge Treatment Plant ( FSTP) in Pallipet Town Panchayat
SITC of 250 KLD Sewage Treatment Plant and 25 KLD Effluent Treatment Plant with O and M 5 Years (Based on MBR Technology) at Govt. Hospital Nagaur
SITC of 250 KLD Sewage Treatment Plant and 25 KLD Effluent Treatment Plant with O and M 5 Years (Based on MBR Technology) at Govt. Hospital Nagaur
Operation and maintenance of sewage treatment plant Chinchpada Kalyan East, Kolsewadi SPS, Vitthalwadi SPS, Chakkinaka SPS, Valdhuni SPS in Kalyan East Division for the period of Three years.
Request for Expression of Interest EOI for Development of Sludge Centre at Kasarwadi for Management of Sludge from various Sewage Treatment Plants of Pimpri Chinchwad Municipal Corporationon Public Private Partnership Basis
RAW WATER TREATMENT PLANT, DM WATER, CONDENSATE POLISHING UNIT, EFFLUENT TREATMENT PLANT WITH ZLD AND SEWAGE TREATMENT PLANT AT BHARAT COAL GASIFICATION AND CHEMICALS LIMITED AT JHARSUGUDA, ODISHA (INDIA)
Operation and Maintenance of Sewage Treatment Plant 4 MLD and 5 MLD Capacity on SBR Technology at Sirhind Zone I and II for the year 2026 to 2027 (01.09.2026 to 31.03.2027).
Repairing and refixing of 25HP Non-clog sewage motor at Sewage Treatment Plant and Supply and delivery of 3HP motor 3 Phase D.O.L.Panel Board at Kuppannan street Lifting manhole
Construction of Sewage Treatment Plant of 3.60 MLD in Malebennur & 2.49 MLD STP in Nayakanahatti towns along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BLR-Pkg-7)
Construction of Sewage Treatment Plant (STP) of 1.70 MLD at Babaleshwara ULB of Vijayapura District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BGM-Pkg-15)
Additional work related to installation of faecal sludge septage treatment plant of 3 kld capacity based on bio-digestor aided constructed wetland (BAC FSTP) for English Bazar, Dev. Block, Malda
Custom Bid for Services - Comprehensive service contract for operation and maintenance of ST Plant and Sumpwell in HAL Township area for Two years Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Facility Management Services - LumpSum Based - Industrial; Operation and maintenance of Sewage treatment plant and Carrying out disinfestation treatment for all plant buildings; Consumables to be provided by service provider (inclusive in contract c..
Construction of Fecal Treatment Plant under Fecal sludge Management Project at Aarewadi Tal.Kawathemahankal Dist.Sangli
Construction of Sewage Treatment Plant (STP) of 2.17 MLD at Siddapura ULB of Uttara Kannada District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BGM-Pkg-16)
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Operation and maintenance contract (AMC) of the Effluent Treatment Plant of 4000 LPH capacity in round the clock at Loco Shed, Eastern Railway, Jamalpur for 03 (three) ye..
Construction of Sewage Treatment Plant of 2.33 MLD in Koratagere along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plant of 10 MLD in Madanayakanahalli town along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
BID DOCUMENTS FOR DESIGN, CONSTRUCTION, ERECTION, TESTING AND COMMISSIONING OF 53 MLD SEWAGE TREATMENT PLANT AT KANAKPUR KANSAD FOR NEWLY ADDED AREA OF NEW SOUTH ZONE, SURAT MUNICIPAL CORPORATION. (INCLUDING 10 YEAR OF OPERATION AND MAINTENANCE)
Construction of 150 KLD capacity Sewage Treatment plant including SITC of E&M works and distribution lines for treated water at CRPF campus, Kalikiri, Chittoor Dist., S.P. SH. Providing pump sets and cable Laying Subwork/Packages: Providing Pumpsets and cable laying
Remaining work of Providing, Supplying & Installation of Sewage Treatment Plant (0.30MLD), Construction of External Drainage Network and Strom Water Drain Network in New Police Head Quarters Makansar Morbi, Dist- Morbi (Including Electrical work) (without SBD) (1st Attempt)
Construction of Sewage Treatment Plant of 0.15 MLD in Hoskote Ph-2 town along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Custom Bid for Services - ETP Effluent water testing for specialized parameters by MOEF&CC/MPCB recognized laboratory Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant Selection of Laboratories for Testing of Products/Material Testing of Water Quality
Facility Management Services - LumpSum Based - Hospitality; Selection of an Agency Vendor for AMC of Operation and Maintenance of Sewage Treatment Plant for 01 year as per Central Govt Minimum Wages for Skilled manpower 02 Operators and 01 reliever f..
BID DOCUMENTS FOR COMPREHENSIVE OPERATION AND MAINTENANCE OF CIVIL, MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORK FOR 6.10 MLD SBR BASED SEWAGE TREATMENT PLANT INCLUDING JAGNATH KUVA AND JOSHI KUVA DRAIANAGE PUMPING STATION AT UMRETH, GUJRAT FOR UMRETH NAGARPALIKA FOR 01 (ONE) YEAR.
Construction/Upgradation of Sewage Treatment Plant of 2.0 MLD to 5.0 MLD in Chintamani Phase-2 along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plants (STP) of capacity 3.03 & 3.37 MLD at Aurad & Hallikhed-B ULBs of Bidar District, 2.26 & 3.56 MLD at Yelburga& Kustagi ULBs of Koppal District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/KLB-Pkg-7) Call 6
Tree Plantation Near Sewage Treatment Plant and MRF Centre at Kathlal.
CONSTRUCTION OF NEW SEWAGE TREATMENT PLANT 8.5 MLD AT SOHNA, DISTRICT GURUGRAM
BALANA - PROVIDING SEWEARGE FACILITY AND SEWAGE TREATMENT PLANT AT VILL. BALANA DISTT. PANIPAT BALANA
Construction of Sewage Treatment Plant of 6.00 MLD based on SBR ( Sequential Batch Reactor) Technology
Sewerage Network and 500 KLD Sewage Treatment Plant based on Developed MBBR a Fluidised Media Reactor using attached growth process (Micro STP) for waste water treatment
Operation and Routine Maintenance for 150KLD Sewage Treatment Plant at Nabanna during the year 2026-27.
Supply, Installation, Testing and Commissioning of Online Continuous Effluent Monitoring System (OCEMS) at Sewage Treatment Plant (STP) at Siraj Nagar in Mettupalayam Municipality for Continuous Monitoring of treated
DESIGN, SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF A SEWAGE TREATMENT PLANT (OPEN TECHNOLOGY) OF 143 MLD CAPACITY, INCLUDING PIPING, MECHANICAL, ELECTRICAL, AND INSTRUMENTATION COMPONENTS, COMPLETE WITH OPERATION AND MAINTENANCE FOR UP TO TEN YEARS FOR OF TP 84 (KOSAD-BHARTHANA KOSAD-MOTA VARACHHA-ABRAMA) & TP 86 (KOSAD) UNDER IN NEW EAST (SARTHANA) ZONE-B, SURAT MUNICIPAL CORPORATION.
ESTABLISHMENT AND COMMISSIONING OF 3.00 MLD CAPACITY TERTIARY SEWAGE TREATMENT PLANT AT KSIIDC BENGALURU SIGNATURE BUSINESS PARK (BSBP) NEAR DEVANAHALLI, BENGALURU ON TURNKEY BASIS INCLUDING OPERATION AND MAINTAINANCE OF THE TREATMENT PLANT FOR A PERIOD OF 5 YEARS