Loading…
Loading…
18 live10 closing this weekmost from Department of Local Government and Department of Agriculture
18 results • Best match
CLEANING OF SEWAGE SUMPS, REPAIR OF SEWAGE PIPE LINES, STARTER PANEL AND ALLIED SEWAGE TREATMENT PLANT WORKS UNDER AGE(I) SURANUSSI
Operation and Maintenance of Sewage Treatment Plant 3 MLD capacity on SBR Technology at Bassi Pathana for the year 2026 to 2027 (01.09.2026 to 31.03.2027).
Operation and Maintenance of Sewage Treatment Plant 4 MLD and 5 MLD Capacity on SBR Technology at Sirhind Zone I and II for the year 2026 to 2027 (01.09.2026 to 31.03.2027).
Installation of Solor System at STP in MC Talwandi Sabo
Supply of skilled and unskilled staff for STP and IPS (MC Bhucho Mandi)
CONSTRUCTION OF MPS OF CAPACITY 120 MLD (PEAK FLOW) CONSTRUCTION OF 60 MLD STP PROVIDING LAYING JOINTING TESTING AND COMMISSIONING OF FOLLOWING PIPELINES AND OTHER WORKS AS UNDER AT NORTH ZONE GAUSABAD AMRITSAR TOWN DISTRICT AMRITSAR UNDER AMRUT 2.0
SUPPLY INSTALLATION 5 YEARS O AND M OF ERP REMOTE ONLINE MONITORING SOFTWARE FOR INTEGRATING MULTIPLE PLC BASED STPS ON A SINGLE PORTAL AND MONITORING THEIR PERFORMANCE FOR 95 MLD STP SOUTH ZONE KHAPER KHERI ASP TECHNOLOGY AT AMRITSAR
Chamber clearance of Silt in various blocks/bungalows and clearance of sludge filter Bed in STP at BBMB Nangal Township.
Repair of Under ground pipeline project for utilization of treated water for irrigation from STP Shri Anandpur sahib Distt Rupnagar
Providing and installing of Online Continuous Monitoring System (OCMS) including 3-year complete maintenance and O and M on STP MC Goniana.
Providing and laying of High-Density Polyethylene (HDPE) pipeline (Dia.200 mm, PE-80, 4 Kg/cm2 working pressure as per IS 4984-2016 standards) including all allied electrical and civil works with material from 4 MLD STP Sultanpur Lodhi, District KPT
Providing and Fixing of OCEMS including One Year Warranty and 3 year Operation and Maintenance at 27 MLD STP at Bukanwala Road, Moga Distt. Moga (Under JHA)
Providing Laying Jointing Testing and Commissioning of DI K7 pipeline network for reuse of STP treated water and flushing requirements in Malout and Abohar including construction mtc room Abohar
SPL REPAIR TO SEWAGE PIPE LINE APPROX 400 MTRS TO CONNECT MANHOLE TO MAIN PIPELINE/STP AND REPLACEMENT OF GI PIPE LINE AT OFFICE COMPEX OTM AND UNIT AREA AT OLD AMRITSAR CANTT
Earthwork for excavation of trenches for laying of HDPE UGPS construction of pump room construction of sump well pumping system and electric work in pump room complete at STP Kot Shamir Tehsil and District Bathinda
Construction of STP of Cap. of 20 MLD and Const. of MPS cap. of 45 MLD Peak Flow including 5 Years O and M and all other alied works at Ferozepur Town Distt Ferozepur under AMRUT 2.0 Scheme.
Prov. and Fixing of OCEMS including 1 Year warranty and 3 years O and M and Prov. Laying of interlocking tiles including the construction of Brick Masonry Toe wall Earth Filling for Raising of already constructed roads at 4 MLD STP Dharamkot
Underground pipeline project for utilization of treated water for irrigation at STP Rahon SBS Nagar