Loading…
Loading…
8 live4 closing this weekmost from HP Irrigation and Public Health and Shimla Jal Prabandhan Nigam Ltd
8 results • Best match
Repairing of 10 KLD Sewage Treatment Plant installed at power house of Parbati III Power Station, Behali, Kullu, Himachal Pradesh
Design, Build and Operate Water Treatment Plants at Manali adjoining area, Sewage Treatment Plants at Palampur zone 1, 3, Karsog and Nahan zone 1,2, 3.
with all contingent civil, including staff quarter, electrical, mechanical, piping and instrumentation works with three months trial run including three-year defect liability period, Shimla and operation and maintenance of entire system for 5 years.
Providing Sewerage system to resettlement colony Jamthal Harnoda in Tehsil Sadar District Bilaspur (SH Operation and maintenance of 0.54 MLD STP and distribution system for two years)
Consultancy services for evaluation, up gradation and modernization of STP Theog
Removal of sludge from STP which is accumulative due to unauthorized drainage of septic tank).
Providing and laying of 150 mm dia DI sewer pipe line from existing chamber to Under Construction Staff Accommodation Building at Annadale View, Chaura Maidan) STP ND Network.
Sub Head Survey, Investigation, Design and Construction of 3.56 MLD capacity STP based on SBR technology as per latest CPHEEO manual with tertiary treatment so as to achieve discharge standard prescribed by NGT, C/o Lab building, Supply and installat