Loading…
Loading…
2,219 results • Best match
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2025-26
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual Maintenance Estimate of 10 MLD STP at Jind for the year 2024-2025
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
ANNUAL MAINTENANCE ESTIMATE OF 10 MLD STP AT BHIWANI FOR THE YEAR 2024-25.
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2025-26
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2024-2025
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2025-26
Esitmate for repair of existing damaged 600mm i/d RCC pipe sewer near STP
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2025-26
ANNUAL MAINTENANCE ESTIMATE OF 10 MLD STP AT BHIWANI FOR THE YEAR 2024-25.
A/MTC. ESTIMATE OF 10 MLD STP AT BHIWANI FOR THE YEAR 2026-27.
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Consturction of Brick work/Rcc Work in dumping site near STP at M.C Ellenabad
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Hiring of gaseous type full vacuum chlorination system with comprehensive maintenance and supply of chlorine gas complete in all respect
Repairing of 500mm i/d rising main for sewerage treatment plant by providing, lowering, laying aligning, fixing in position 500mm mechanical joint collar, laying of 500mm i/d DI pipe with specials etc. complete in all respect and all other works
Hiring of hydra and JCB for removing of vegetation/Sarkanda at 500mm i/d sewerage rising main along JLN canal, U/E, Rohtak and all other works contingent thereto
ANNUAL MAINTENANCE ESTIMATE OF HORTICULTURE WORKS IN CIVIC PARK RESI. AREA M.T.S. BHATTU FOR THE YEAR 2025-2026.
Construction of boundary wall with brick work plaster RCC columns prov and fixing of concertina fencing prov and fixing of 80mm thick interlocking paver block with kerbs for footpath etc and all other works contingent thereto
Construction of ETP Based on SBR Technology i.e. capacity calculation to meet NGT Guidelines for STP of 1.50 MLD in Shaheed Hasan Khan Mewati Govt. Medical College, Nalhar in Distt. NUH (INTEGRATED ETP plus STP).
Construction of ETP Based on SBR Technology i.e. capacity calculation to meet NGT Guidelines for STP of 1.50 MLD in Shaheed Hasan Khan Mewati Govt. Medical College, Nalhar in Distt. NUH (INTEGRATED ETP plus STP).
A/MTC OF LED STREET LIGHT FITTING ON T-POINTS ON PCC POLE/ ST POLE/HIGH MAST INCLUDING ON/OFF OPERATION SYSTEM IN SEC-27 AND 28 AND SEC-27 PARK AND 28 PARK, SEC-28 STP U/E PANCHKULA (AS PER ENCLOSED DETAIL) FOR THE PERIOD OF 2 MONTHS.
Annual maintenance of 10 MLD STP Gohana Road, Jind. Supply and refilling of chlorination tonner for chlorination of effluent at 10 MLD STP Gohana Road Jind complete in all respect and all other works contingent thereto
Annual maintenance of 10 MLD STP Gohana Road, Jind. Dismantling and rewinding of burnt non clog sewerage submersible motor at 10 MLD STP Gohana Road, Jind complete in all respect and all other works contingent thereto
Annual maintenance of 7.50 MLD STP in RGEC Sonipat. (for the Year 2023-24Operation and maintenance of 7.50 MLD STP on ASP technology at RGEC Sonipat and all other works contingent thereto. from 13.05.2023 to 12.05.2024
Annual maintenance of 15 MLD STP in Zone-III Hisar. Providing and fixing of CCTV camera with all accessories at 15 MLD STP Zone-III Hisar complete in all respect and all other works contingent thereto
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
Annual operation and maintenance of sewerage system, STP, IPS and disposal complete in all respect
Cleaning/Remodeling of ditch drain from STP to Peharawaar/Kanheli Drain in Sector-25, Rohtak
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
Repair and Raising of RCC effluent channel at 3 MLD STP Farrukh Nagar Distt. Gurugram
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
A/Mtc estimate for sewerage scheme and 4.5 MLD STP Kharkhoda for year 2025-26
Special repair for renovation and upgradation of existing 4.5 MLD STP bassed on MBBR Technology.
Operation and maintenance of 7.5 MLD STP in Sector 21 U.E., Kaithal for 24 Months.
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
Special repair of staff quarters (at STP) in Surya Vihar, Sec-9A, Gurugram (Balance Work)
O and M of 20 MLD STP (SBR based) Kelnia Road Sirsa for 3 years.
Annual Maintenance Estimate of 15 MLD STP Zone-III, Hisar of the year 2026-27