Loading…
Loading…
853 results • Best match
REPAIR/MAINT OF STP AND CONNECTED PIPE LINE SUB MOTORS, FITTING AT LGJ MIL STN
Annual Contract for Routine, Breakdown, Capital Maintenance and Operation work of STP Plant and all connected supply pits and upkeep of the STP area of Phase-I and II, CTPP, Chhabra.
Devpura 08 MLD STP Wall construction work on government land located near. at Bundi
MG Hospital Bhilwara me STP Plant ke Sanchalan avm Rakh Rakhav ka karya
Construction of Boundray wall from Kabir Chowk to Sugar Mil STP, Sri Ganganagar
Operation and maintenance of 20 MLD STP near Agyara village for Two Years.
O and M work for STP at Shaheed Chandra Shekhar affordable housing scheme
Outsourcing of STP for DRDO Unit and allied works under GE (N) Bikaner
Construction of approach CC road from Kadera Road main road to STP plant.
Construction of community Sarayi at Rada ji Bavaji Near STP ward No. 22
DRAIN WALL FILLING AND SEWER LINE REPAIRING WORK NEARBY 8 MLD STP BHRAMPURI
Channelization work for Gajadharpura STP plant to kalakh Dam Bandi River District Jaipur
Works of Sewer Seystem, STP and SPS,MWP (if any) at AJMER BEAWAR
Rate Contract for Operation of 10 MLD STP (Suratgarh-Padampur Bypass), Sri Ganganagar
Laying of treated water pipe line from STP to Noah Village for Reuse
SITC OF GRID INTERACTIVE GROUND MOUNTED SOLAR POWER PLANTS AT STP DEHLAWAS, JAIPUR
Operation and Maintenance/upkeep of Soil bio technology based STP at Kishangarh Airport
P/F of HDPE pipe for supply of STP treated water for agriculture.
Construction of Sump well to store treated water at 5 MLD STP, Hanumangarh
Annual Contract for RBC Mtc and Opr Work of ETP, STP and all Connected Effluent Supply pits and upkeep the equipment of ETP, STP of Unit 5 and 6 at CSCTPP,Chhabra
UTP, STP, 2, 4, Corner, Pipe 1, Pipe 2, IO Box, IO BOX, Panel, Manager, UTP Cord, RJ45, Surge, Laying
Annual Contract for Routine, Breakdown, Capital Maintenance and Operation work of STP Plant and all connected supply pits and upkeep of the STP area of Phase-I and II, Unit #1to4 CTPP, Chhabra.
Annual Contract for Routine, Breakdown, Capital Maintenance and Operation work of STP Plant and all connected supply pits and upkeep of the STP area of Phase-I and II, Unit #1to4 CTPP, Chhabra.
OCEMS IN MCJ SOUTH FOR SALAWAS STP PHASE 1
Ncap Work of planting trees at STP and Cand D plant under
SEWER LINE WORK AND CONSTRUCTION OF STP IN VIGYAN NAGAR SCHEME, ALWAR.
PROVN OF SUPPLY OF CHEMICALS FOR STP / WATER SUPPLY INSTALLATION AT LGJ MIL STN
Opration and Maintantence Work at old STP in Municipal Council area. (Annual Work Contract)
CONSTRUCTION OF EARTH FILLING AND MASSONARY NEAR FIRE STATION STP IN WARD NO 07
S and F of Vedio Conferencing Room with Interactive Panal at STP Office. 7505
Providing, Laying and jointing of pipe line under WSS 2 STP sub division Sangaria
Construction of Tin shade and Interlocking Road for MRF Center at Near STP Santpur
PROVN OF SUPPLY OF CHEMICALS FOR STP / WATER SUPPLY INSTALLATION AT LGJ MIL STN
Operation and Maintenance of 20 MLD STP Near Agyara Village Alwar for Two Years
Construction of Nalla From Suratgarh-Padampur byepass road to 10 MLD STP , Sri Ganganagar
Supplying ,Fixing ,Testing and Installation of Pump at Mandawa Pump House And STP Fatehpur
Earth filling work in green belt, Biogas, STP at Dev Narayan Nagar Scheme, Kota
Operation and Maint. of Existing 20 MLD STP Based on ASP Technology at Khanpura
Operation and Maint. of Existing 13 MLD STP Based on SBR Technology at Annasagar
Silt Clearence and Site Clearence at 10 MLD STP Suratgarh Padampur Bypass Road, SGNR
Laying HDPE Pipe Line for disposal of rain water at STP Road, Sri Ganganagar.
MANNING AND OPERATION TO STP AT NIWARU JAIPUR MIL STN UNDER GE (S) JAIPUR
Providing and Laying New Disposal line from R.H.B STP to Toll Plaza (Alwar Bypass)
Laying of HDPE pipe line from STP to different location in forest (Beed) Jhunjhunu
Development and maintenance of Lawn and Plantation at 4.3 MLD STP Nari Bari Fatehpur
Works of Sewer Seystem, STP and SPS,MWP (if any) at BUNDI and BARAN
Providing operation and comprehensive maintenance including consumables for 1 MLD STP in MNIT Jaipur
Providing pipeline to supply treated water of STP to all garden areas of campus at NIFT, Jodhpur(Raj.) Subwork/Packages: Providing pipeline to supply of water of STP
Providing Laying and Jointing of Main Trunk Sewer Line of size 800 mm to 1200 mm dia with construction of Manholes for PRN (north) area to 30 MLD STP Nevta, under Jurisdiction of EE PHE-II, JDA, Jaipur
Spl Rep to OR Md Accn Qtr No 178/1 to 8 at RA Line-I to roof treatment floor tilling elect wiring plumbing work sewage treatment replastering distemper wall putty replacement of door windows modular kitchen fitment and misc repair work at Nasirabad