Loading…
Loading…
1,752 results • Best match
Preventive maint and servicing of E/M Equipments of STP at Old Cantt and Fort Cantt Prayagraj.
Repair and maintenance of STP and NON CLOG submersible pump and allied work at Old Cantt Allahabad.
Ward 25 mundera me ram chandra mition railway line se lekar STP pongahat nala ka safai karya
Design, Engineering, Procurement, Erection, Testing and Commission of Volute Sludge Dewatering System at 120MLD STP Goithaha Varanasi
Construction work of anaerobic waffle reactor (manual STP Plant) on the pond on Mo Mayapuri sewer drain.
Operation and maintenance work of 137 MLD STP including MPS OandM (for 60 months) at Kasna, Greater
Stanley marg se bela kachar STP Rasoolabad ghat Hote hue Gangaji ke Kinare Tak Inter Locking Road
Construction of 500KLD STP and 50 KLD ETP Including Sewer Line etc at Medical College Campus Firozabad
REPAIR/MAINT OF SWIMMING POOL, STP AND CHEMICAL DOZING EQUIPMENTS AND OTHER MISC WORKS AT FATEHGARH CANTT
New Construction to Interlocking from Prayagraj Lucknow Marg to Bela Kachhar Marg via STP in Phaphamau side
D/o Green Belt Area (Stadium) with 02 year Maintenance Sector-123 Near STP Tank/Plant Noida
Material supply and work for the operation of Sewer Treatment Plot (STP) located at Awas Vikas Colony.
Operation and Maintenance work for 5 year of 2-10 MLD STP at Sadopur Badalpur, Greater Noida
UPGRADATION OF EXISTING STP AT LOHARA MARG FOR SECONDARY TREATMENT FOR TERTIARY TREATMENT UNDER GE W MATHURA
Comprehensive Maint/Repair of STP, Equipment (Motor Panel, pumps) etc other connected items under GE (West) Mathura
OUTSOURCING OF DG SET STP SEWAGE PUMP AND CONNECTED ACCESSORIES AT VARIOUS LOC UNDER GE EAST AGRA
New Construction to Interlocking from Prayagraj Lucknow Marg to Bela Kachhar Marg via STP in Phaphamau side
Operation and maintenance work of 700 KLD STP at Sector Omicron-1 (Lohiya Enclave) in Greater Noida.
CONSTRUCTION WORK FSTP IN NBPKT
FSTP BOUNDARY WALL NIRMAN KARYA
O/M of STP (Five Year Running Operation and maintenance of 34 MLD (with Combitreat/power generation) and 25 MLD based on SBR-Technology STP,Including Supply,installation, testing and commissioning of CCTV,OLMS, and Flow meter at Sector-50,Noida
O/M of STP (Five Year Running Operation and maintenance of 54 MLD (with Combitreat/power generation) and 33 MLD based on SBR-Technology STP,Including Supply,installation, testing and commissioning of CCTV,OLMS, and Flow meter at Sector-54,Noida
M/o of STP ( Two Year Repair and maintenance work of various capacity non clog Sewage Submersible pump set, TPMO, Transformer, HT and LT armoured Cables and other allied wall at connected and open UGR in STP -50 compound) NOIDA
M/o UGR STP (Cleaning and removal of existing Desilting/Debris/Silt rubbish/Bio mass/Grit and Sediment Material from Open/Covred UGR including Cleaning of etc. Machine/Chemical Cleaner in STP Compound 35 MLD UGR at Sector-123)NOIDA
Cylinder Maintenance and Handling Service - Statutory testing & Painting(STP); Domestic; 14.2 Kg, Cylinder Maintenance and Handling Service - Statutory testing & Painting(STP); Commercial; 19 Kg, Cylinder Maintenance and Handling Service - Repainting; Domestic; 14.2 Kg, Cylinder Maintenance and Handling Service - Repainting; Commercial; 19 Kg, Cylinder Maintenance and Handling Service - Repainting; Commercial; 5 Kg, Cylinder Maintenance and Handling Service - Repainting; Commercial; 47.5 Kg
M/o STP(Annual Repairing and Rewinding of 150 HP Submersible Pump at MSPS-1,Sec-136) Noida
OPRATION AND MAINTENENCE WORK OF STP BALRAMPUR AND DIRRENT SIZE SIWER LINE OF NAGAR PALIKA PARISHAD AZAMGARH AREA .
M/o STP (Annual Repairing and Rewinding of 75 HP Submersible Pump at IPS-3, Sec-93A) Noida
Strengthening of Sewerage (Desilting and Cleaning of deep Sewer line in Sector-49 to STP Sector-50) Noida.
Strengthening of STP (Annual repairing and maintenance of submersible motor pump at 33 MLD SPS Sector-54) Noida
8448/E8 MAINT AND REPAIR OF STP AND SEWAGE PUMP INSTALLATION, REPLACEMENT OF PARTS UNDER GE (EAST) BAREILLY
Interception and Diversion Work with STP and C0 Treatment at Nagar Palika Parishad Jalaun Distt. Jalaun UP India
M/o STP (Annual Repairing and Rewinding of 75 HP Submersible Pump at IPS-8, Sec-128) Noida
STP PLANT PAR PLANT KI ROAD SE MPS ELECTRIC ROOM TAK ELECTRIC ROOOM KE CHARO TARAF CC WORK
Construction of shed for STP Facility with associated Civil, Electrical and Mechanical Work at LPG Bottling Plant, Kanpur.
REPAIR/MAINT OF SWIMMING POOL, STP, MES INSTALLATION, SUPPLY OF ESSENTIAL CHEMICAL AND ALLIED WORKS AT FATEHGARH CANTT
Lighting work on the divider from Sector-06 Police Chowki to STP of Shatabdi Nagar Scheme. (Second Part)
FOR CONSTRUCTION OF HT 11 KV INDEPENDENT FEEDER UNDERGROUND FOR 350 KVA RAMNAGAR STP, VARANASI UNDER DEPOSIT SCHEME
P/Laying Rising main line from MPS sector-01 to 20MLD STP at sector Ecotech-3, Greater Noida.
Construction Balance work at Khady Aoushadhi Prayogshala and Mandliy Office Ke Buliding Me STP (R.C.C. Tank) Distt Basti
Road construction work by CC from new police station building to STP in Ward 57, Pallavapuram Phase 02.
INCEPTION AND DIVERSION AND STP WORK IN MANJHANPUR NAGAR PALIKA PARISHAD IN DISTRICT KAUSHAMBI UNDER SMB 2.0 PROGRAMME
FOR CONSTRUCTION OF HT 11 KV INDEPENDENT FEEDER UNDERGROUND OF 1045 KVA RAMANA STP, VARANASI UNDER DEPOSIT SCHEME.
External Electrification Work (Under Ground System) of 11KV line for STP at Sector -2, Siddharth Vihar Yojna, Ghaziabad
M/o S.T.P.(Two Year Running Operation Treated water UGR pump house and Hydrent at STP-50) Noida
New Police Station Building in Ward-57 Pallavapuram Phase-02 RCC drain construction work from culvert to STP.
PROVN OF RETAINING WALL AT REAR SIDE OF STP AT KANDHAR LINE UNDER AGE BR II AT FAIZABAD
LAYING OF SEWAGE LINE CONNECTING EXISTING TOILET BLOCK OF FACTORY WITH PROVISION OF STP INSIDE SAF AT KANPUR
Operation and Maintenance work for 5 year of 137MLD STP (From 2019 to 2024) at Kasna, Greater Noida
8545/E8 MAINT AND REPAIR OF STP AND SEWAGE PUMP INSTALLATION, REPLACEMENT OF PARTS UNDER GE(EAST) BAREILLY