Loading…
Loading…
3,759 results • Best match
ETS survey.Geotechnical Investigation,Design,Approval of detailed Engineering GFC(Good for Construction) drawings and Construction of Roads(BT&PQC), Bridges,Strom water drains, Culvers, Water supply,Sewerage&STP, Utility Ducts for Power&ICT, Reuse ... Water, Sewerage &Strom ...
Cleaning and clearing of ash settled at various locations of boiler Cleaning of all floors from 0 mts to Drum level with air after overhauls Inspection and adjustment of set values of constant load hangers and spring hangers of various link pipes and ... and manhole doors ...
Supply and Fixing of Manhole at D.No.54/6 (JJ Reddy House) in Nabikota,Laying of 300 mm CC drain from D.NO:54/59-6 (opp) to 54/62-3-7 (opp) ,CC patch from ZPHS Urdu Kagitalapenta school to Ck kalyana mandapam (opp to fathekhan masjid) in Nabikota,Inter connections at D.NO:54/59-2 near sivalayam, 46/114, near siva house in Chemmumia peta and 54/287 near Sunnam Battilu in in 44th Division
Providing CC Road, CC Drains (For drain damaged portation) and Balance Portation of UGD Lines at Old Vehicle Shed to Vengaiah nagar Tobaco Company in Div No.55 under AE-6 Section (RECALL)
2026-Eng04-39-102 Raising of UGD man holes from Visakha Container Terminal (Town hall main gate) to Poleramma Ammavari temple at Fishing harbor Road in ward No-39 of South Zone GVMC
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage and Social Infrastructure like School building, Primary Health Center, Commercial Complex and Community hall in EWS Layouts at Kakinada, Mandapeta, Rajahmundry (Namavaram, DIET, Thorredu, Morampudi & Vaddedara), Peddapuram, Pithapuram, Amalapuram, Samalkota (Jaggamvaripeta & Uppuvarisatram) & Ramachandrapuram ULBs under PMAY (HFA) (U) Scheme at East Godavari District, Andhra Pradesh on Lumpsum contract (Percentage Tender) (With DLP of 2 years).
RFP for Development- Estimate for Investigation, Design and Construction of Roads, Drains, Culverts, WaterSupply, Sewerage, STP, Utility Ducts for Power&ICT, Reuse waterline& Avenue Plantation compatible with trunk infrastructure in Layouts for Land pooling schemes Kurugallu(P) and Nidamarru(P) villages in Zone-12A area in Amaravati Capital City, Andhra Pradesh and performance based O&M of Infrastructure created for a period of 10 years on Hybrid Annuity Model Basis(HAM)
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kuragallu (P) and Nidamarru (P) Villages in ZONE-12A area in Amaravati Capital City, Andhra Pradesh on EPC Basis & performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kuragallu (P) and Nidamarru (P) Villages in ZONE-12A area in Amaravati Capital City, Andhra Pradesh on EPC Basis & performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kuragallu (P) and Nidamarru (P) Villages in ZONE-12A area in Amaravati Capital City, Andhra Pradesh on EPC Basis & performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
APCRDA - Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Lingayapalem (P), Malkapuram (P), Mandadam(P), Shakamuru (P), Inavolu (P), Nelapadu (P), Kondamarajupalem (P) and Velagapudi(P) Villages in Zone 9 area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Ananthavaram, Nelapadu, Sakhamuru and Thulluru (Parts) in Zone 2B Area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years.
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Trunk Mains etc., in the approved EWS layouts at of GVMC (Suddagedda,Burma Colony,Duvvada,Bhanojithota,Peddagantyada,Kondakoppaka,Sirasapalli,Padmanabha nagar,Kommadhi-2),Yelamanchili ULBs in Visakhapatnam District under AHP PMAY HFA (U) Project on Lump sum contract (Percentage Tender) (with Defect Liability Period of 2 years) cum Reverse Tendering.
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court yard filling, Trunk Mains etc., in the approved layouts at Srikalahasthi Ph-1 (Rajeev Nagar) Srikalahasthi Ph-II (Near S.W. Hostel), Chittoor Ph-II (Murakambattu), Puttur Ph-II (Nandi Mangalam), Punagnur Ph-II (Ethur), Madanapalli Ph-II (Venkappakota) ULBs of Chittoor District under AHP-PMAY-HFA(U) with 2 years defects liability period
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kondamarajupalem (P) and Rayapudi (P) Village in Zone-6 area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years
WORLD BANK and ADB financed Amaravati Capital City Development program Related to Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes (LPS) for Nelapadu, Kondamarajupalem and Rayapudi (Parts) in Zone 3A Area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years.
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling etc., in approved EWS Layouts in CRDA areas of Ananthavaram, Dondapadu, Inavolu, Mandadam, Nidamarru, Nowluru, Penumaka, Thulluru, and Municipalities of Mangalagiri, Narasaraopeta in Guntur District and Kandukuru in Prakasam District under AHP-PMAY- (HFA) (U) Project on Lump sum contract ( Percentage Tender) (with Defect Liability Period of 2 Years) cum reverse tendering.
Investigation, Design and Construction of Roads, Bridges, Storm water drains, Water Supply, Sewerage, utility Ducts for Power & ICT, Reuse waterline, Avenue Plantation & Artificial Water body/channel, compatible with trunk infrastructure in Layouts for Amaravati Government Complex area in Amaravati Capital City, Andhra Pradesh on Design Build Item rate contract & performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
Laying of BT road from 1. D.No.28-8-399 to upto 5MLD UGD Plant Lakshmi Parvathi nagar, in Division no. 54 Construction of CC roads from 1.D.No.28-8-386 to D.no. 28-8-421 2. D.no.28-8-386 to D.no. 28-8-421 3. D.No. 28-8-430 to Bathelem Church , Lakhsmi Parvathi nagar, Near Electrical sub station in Division no. 54 4. Main road D.no. 28-8-224 to D.no. 28-8-306, Railway street, Janardhan Reddy colonyin Divison no. 54
(A)Improvements to Road Baligattam, bye pass R&B Road at 1/0 km L/S to Narsipatnam to Revupolavaram R&B @ 1/0KM R/S via Joginadhunipalem from Km 2/2 to 2/6 in Anakapalli District. (B) Improvements to Road Baligattam bye pass R&B Road from km 0.000 to ... and underground drainage with ...
(A)Improvements to Road Baligattam, bye pass R&B Road at 1/0 km L/S to Narsipatnam to Revupolavaram R&B @ 1/0KM R/S via Joginadhunipalem from Km 2/2 to 2/6 in Anakapalli District. (B) Improvements to Road Baligattam bye pass R&B Road from km 0.000 to ... and underground drainage with ...
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kondamarajupalem (P), Lingayapalem (P), Uddandarayunipalem (P), Velagapudi (P) and Mandadam (P) in ZONE-7 area in Amaravati Capital City, Andhra Pradesh on EPC Basis & performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
RFP for Development-Estimate for investigation, Design and Construction of Roads, Drains, Culverts, Water Supply, Sewerage, STP, Utility Ducts for Power&ICT, Reuse waterline & Avenue Plantation compatible with truck infrastructure in Layouts for Land Pooling Schemes Kurakallu(P), Nowluru(P) and Nidamarru (P) Villages in Zone-12 area in Amaravati Capital City, Andhra Pradesh and performance based O&M of the infrastructure created for a period of 10 years of Hybrid Annuity Model Basis (HAM)
Investigation, Design construction of Roads, Bridges, Storm water Drains,Culverts, Water Supply, Sewerage, STP, Utility ducts of Power & ICT, Reuse water line & avenue Plantation, compatible with Trunk infrastructure in Layouts for Land pooling Schemes for Kuragallu(P) and Nidamarru(P) villages in ZONE-12A area in Amaravati Capital City, Andhra Pradesh on Lumpsum contract (%percentage Tender) & Perfomance based O&M of the infrastructure created for a period of & years (including DLP of 2 years)
Investigation, Design and Construction of Roads, Bridges, Storm water Drains, Culverts, Water Supply, Sewerage Network, Utility Ducts for Power & ICT, Reuse Network, Pedestrian Tracks, Cycle tracks, Avenue Plantation & Street Furniture etc. in ( package -XVII)(i) E13 (excluding the Elevated Corridor), N1, N2, N5, N18 and E15 Roads and (ii) Utilities in the green buffer of N6 Road in Amaravati Capital City, Andhra Pradesh on Design, Build, Item Rate (Lump sum) basis. (2 yeas DLP)
APTIDCO-Construction of Balance Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Trunk Mains etc in the approved layouts at Eluru Municipal Corporation (Ponangi Road and Kothuru), Jangareddygudem (Markandeyapuram), Tanuku (Bala Balaji and Indiramma Colonies), Nidadavole (Tirugudem) and Kovvuru (Pedatallapuntha) ULBs of West Godavari District, Andhra Pradesh under AHP-PMAY-HFA (U).with 2 years defect liability period under lump sum contract (% percentage tender).
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage compatible with Trunk Infrastructure and Social Infrastructure like School Building, Primary Health Center, Commercial Complex and Community Hall in EWS layouts at Chittoor, Puttur, Punganur, Nagari, Srikalahasthi (Phase I and II) ULBs including 2 (Two) years Defect Liability Period under PMAY (HFA) (U) Scheme at Chittoor District, Andhra Pradesh on Lump sum contract (Percentage Tender) (with DLP of 2 years).
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage compatible with trunk infrastructure and Social Infrastructure like School Building, Primary Health Center, Commercial Complex and Community Hall in EWS layouts at Kadapa (Phase I and II), Jammalamadugu, Rajampeta and Rayachoti ULBs including 2 (Two) years Defect Liability Period under PMAY (HFA) (U) Scheme at YSR Kadapa District, Andhra Pradesh on Lump sum contract (Percentage Tender) (with DLP of 2 years).
Guntakal Municipality- Sewarage and Septage Management with construction of 8 MLD STP in Guntakal Municipality under AMRUT 2016-20- Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewerage Treatment Plant of 8 MLD capacity based on Sequential Batch Reactor (SBR) Technology with three months trail run and post completion Operation and Maitanence of entire Sewage Treatment Plant for Seven (7) years including 2(two) years Defect Liability period in Guntakal Muncipality
Annual Maintenance Contract of Repairs and Maintenance of Narava 54.0MLD, Aganampudi 6.0 MLD, Madeenabagh 2.0 MLD and Manthripalem 1.0 MLD JNNURM Housing Colonies STP'S , Duvvada ,Aganampudi sewerage collection sumps and Repairs, Rectification of Leaks and Bursts of 1000mm dia D.I pumping main and 1000mm dia RCC Outlet pipe line at 54.00MLD STP in Ward No:77, 85 and 88 under AE(WS & S)-16 merged, in GVMC, Visakhapatnam for the Year 2025-26
NUDA - Construction of 2nd main 40 ft CC Roads, balance CC Drain and Culverts at Main Road, and UGD pipeline from MIG layout to existing STP in TIDCO housing including site levelling in Kandukuru MIG layout
Supply and Delivery of 5 Nos. of Computers and 2 Nos of Printers and 1 No of Scanner for the Madhurawada Zone Sewerage Project Section in GVMC.
Hiring of Sucker Cum High Pressure Jetting Machine for Cleaning of Under Ground Sewerage network of STP-1 in Tadipatri Municipality under Municipal General Funds.(3rd CALL).
Supply and Fixing of MS Iron Manhole at a. ITI Circle, B. D.No. 56/170-2 Putta Sandhu, Shanthi Nagar, and Culvert at D.No. 45/197-1, Balaji Nagar of Kadapa Municipal Corporation
Repairs to Damaged Sewer main line of Sai Nagar STP to Oxidation Pond near Sai Krishna House at Chitravathi River Puttaparthi Municipality 2ND CALL
Hiring of Super Sucker cum High pressure Jetting Machine for cleaning of Under Ground sewerage network of STP-2 in Tadipatri Municipality under under Municipal General Funds.(3rd CALL)
Sewer inspection machinery (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6810875 Dated : 22-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR.HEAD, PURCHASE AND STORES Satish Dhawan Space Centre SHAR, Department of Space, indian space research organization, Department of Space (President Of India Acting Through Sr. Head, Purchase And Stores)
investigation Design and Construction of Roads, Strom water Drains, Culverts, Water Supply, Sewerage, STP, Utility ducts for Power & ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kuragallu (P), Nowluru (P), and Nidamarru (P), villages in ZONE-12 area in Amaravati capital city, Andhra Pradesh on Lumpsum contract (Percentage Tender) & Performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 years)
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage compatible with trunk Infrastructure and Social Infrastructure like School Building, Primary Health Center, Commercial Complex and Community Hall in EWS Layouts at Hindupur, Puttaparthi, Gooty, Pamidi, Kadiri and Tadipathri (Phase I and II) ULBs including 2 (Two) years Defect Liability Period under PMAY (HFA) (U) Scheme at Ananthapuram District, Andhra Pradesh on Lump sum contract (Percentage Tender) (with DLP of 2 years.
Investigation, Design and Construction of Roads, Storm water drains, Culverts, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse water line, IPS & Avenue Plantation, Compatible with trunk infrastructure in Layouts for Land pooling Schemes for Krishnayapalem (P) and Venkatapalem (P) villages in ZONE - 8A area in Amaravati Capital City, Andhra Pradesh on Lumpsum contract (% Percentage Tender) & Performance based O&M of the infrastructure created for a period of 7 Years (including DLP of 2 Years)
Construction of Academic block-2 including internal Water supply, Sanitary, Drainage and development works like UG sump, CC Roads, External sewerage, water supply lines, storm water drains etc. and providing IEI & Fans, Street lighting, Pump Sets, Fire Fighting with Down comer system, Addressable Fire alarm system, 2 No. 13 passenger Lift, DG set, UPS System, VRF/VRV AC system, CCTV System, LAN networking system, EPABX system and AV system for Damodaram Sanjeevayya National Law University, Sabbavaram, Visakhapatnam.
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage compatible with trunk infrastructure and Social Infrastructure like School Building, Primary Health Center, Commercial Complex and Community Hall in EWS layouts at Kadapa (Phase I and II), Jammalamadugu, Rajampeta and Rayachoti ULBs including 2 (Two) years Defect Liability Period under PMAY (HFA) (U) Scheme at YSR Kadapa District, Andhra Pradesh on Lump sum contract (Percentage Tender) (with DLP of 2 years)(2nd Call).
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation compatible with trunk infrastructure in Layouts for Land Pooling Schemes Lingayapalem(P), Malkapuram(P), Mandadam(P), Shakamuru(P), Inavolu(P), Nelapadu(P),Kondamarajupalem(P) and Velagapudi(P) Villages in Zone-9 area in Amaravati Capital City, Andhra Pradesh on EPC Basis & performance based O &M of the infrastructure created for a period of 7years(including DLP of 2Years)."
Development of Physical Infra structure such as Internal Roads, Storm water Drains, Water supply, Sewerage networks compatible with trunk infra structure, Court yard filling, Trunk mains etc., in approved EWS layouts at Eluru municipal corporation (ponagi road and Kothuru), Jangareddygudem (Markandeyapuram), Tanuku ( Near Balabalaji textiles, and Indiramma colonies), Nidadavolu ( Tirugudem), and Kovvuru ( Pedatallapuntha) ULBs of West Godavari District under PMAY (HFA) (U), phase-II, with 2 years defect liability period and Lumpsum Contract (Percentage Tender) cum Reverse Tendering.
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water supply, Sewerage, Compatible with trunk infrastructure and Social Infrastructure like School buildings, Primary Health Centers, Commercial Complexes and Community halls in EWS layouts at Mangalagiri, Narasaraopeta ULBs in Guntur district, Kandukuru ULB in Prakasam district, Physical Infrastructure at Ananthavaram, Dondapadu, Inavolu, Mandadam, Nidamarru, Nowluru, Penumaka, Thulluru in CRDA region under PMAY (HFA) (U) scheme on Lump sum contract (Percentage Tender) (With Defect Liability Period of 2 years).
Investigation, Design and Construction of Physical Infrastructure such as Roads, Drains, Water Supply, Sewerage and Compound Wall (Ashpond) compatible with trunk infrastructure and Social Infrastructure like School Building, Primary Health Center, Commercial Complex and Community Hall in EWS layouts at Akkacheruvupadu, Allipuram, Kallurupalli and Ashpond of Nellore Municipal Corporation ULB including 2 (Two) years Defect Liability Period under PMAY (HFA) (U) Scheme at Nellore District, Andhra Pradesh on Lump sum contract (Percentage Tender) (with DLP of 2 years).
Development of Physical Infrastructure such as Roads, PCC side Drains, Plinth protection wall, PCC Culvers, GLSR, Borewells, External Water supply Sewerage lines, Approach Roads/ Trunk Drains, Septic Tanks, Kerb, Trunk Infra, Pump Room, Retaining Walls, Filling/ Cutting etc., in approved EWS Layouts in Greater Visakhapatnam Municipal Corporation areas of slums under Phase-II at Chilakapeta, T.R.Mutyamamba and Adarsagramaman Visakhapatnam District under PMAY (HFA) (U) Project on Tender cum Reverse Tendering with Defect Liability Period of 2 Years
RFP for engagement of PMC for the Work of Package XXXXXI: Construction of Roads, Drains, Water Supply, Sewerage, Utility Ducts for Power and ICT, Reuse Waterline, STP and Avenue Plantation, compatible with trunk infrastructure in layouts for LPSs for Krishnayapalem(P), Venkatapalem(P), Penumaka(P) and Undavalli(P) villages in Zone-8 Area and Penumaka Layout in adjacent zones in Amaravati Capital City, Andhra Pradesh on Lump Sum contract (percentage tender) basis including DLP of 2 years.
Development of Physical Infrastructure works such as internal roads, storm water drains, water supply, sewerage network compatible with Trunk Infrastructure, courtyard filling, Trunk mains etc., in approved EWS layouts at Eluru Municipal Corporation(Ponangi Road and Kothuru), Jangareddygudem(Markandayapuram), Tanuku(Bala Balaji and Indiramma Colonies), Nidadavole (Tirugudem) and Kovvuru (Pedatallapuntha) ULBs of West Godavari District under PMAY (HFA) (U) Phase-II with 2 years Defect Liability Period and Lump sum contract (Percentage Tender) cum Reverse Tendering.
Development of Physical infrastructure such as internal Roads, Storm water Drains, water supply, sewerage network compatible with Trunk Infrastructure, court yard filling, Trunk mains etc., in approved EWS layouts at Eluru Municipal Corporation (Ponangi road and Kothuru), Jangareddygudem (Markandeyapuram), Tanuku( Bala Balaji and Indiramma Colonies), Nidadavole(Tirugudem) and Kovvuru (Pedatallapuntha) ULBS of West Godavari District under PMAY (HFA) (U) Phase-II with 2 years Defect Liability Period and Lump sum contract (Percentage Tender) cum Reverse Tendering.