Loading…
Loading…
1,396 results • Best match
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (Q3)
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (Q3)
Custom Bid for Services - ANNUAL OPERATION AND MAINTENACE OF 1MWP 11KV GRID CONNECTED SOLAR POWER PLANT AT RAJHAMUNDRY AIRPORT. Similar Category AMC/CAMC of Solar Energy Power Plants
Supply of Solar Fuses and Holders to NTPC Kadiri 50MW Solar PV Project
Provn of Solar Power Plant and allied services at AF STN Suryalanka
INVESTIGATION, DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING, OPERATION AND MAINTENANCE FOR 10 YEARS OF A GRID CONNECTED SOLAR POWER PROJECT (a) GROUND MOUNTED SOLAR POWER PLANT WITH/WITHOUT BATTERY FOR CAPTIVE CONSUMPTION OF KMC (b) GROUND ... MOUNTED SOLAR POWER PLANT WITH/WITHOUT ... ROOFTOP SOLAR POWER PLANT WITH ...
INVESTIGATION, DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING, OPERATION AND MAINTENANCE FOR 10 YEARS OF A GRID CONNECTED SOLAR POWER PROJECT (a) GROUND MOUNTED SOLAR POWER PLANT WITH/WITHOUT BATTERY FOR CAPTIVE CONSUMPTION OF KMC (b) GROUND ... MOUNTED SOLAR POWER PLANT WITH/WITHOUT ... ROOFTOP SOLAR POWER PLANT WITH ...
Solar Power Plant 20KWP over Officers Accommodation at NCC Nagar in SVU Campus Tirupati.
Providing rooftop solar Power plant in the premises of Raj Bhavan located at Governorpet Vijayawada
Providing rooftop solar Power plant in the premises of Raj Bhavan located at Governorpet Vijayawada
Operation & maintenance of existing 1MW solar power plant at IP-Gooty, Anantapur Dist for 2years
Operation & Maintance of existing 1MW Solar Power Plant at IP-Gooty, Anantapur Dist for 2years.
Solar Power Plant (20K WP) over PI Staff Accommodation at NCC Nagar in SVU Campus, Tirupati.
SOLAR POWER PLANT
solar power plant
Solar power plant
Operation and maintenance of existing 1MW solar power plant at IP-Gooty, Anantapur Dist for 2 years
On grid solar power plant
Supply installation, Testing, Commissioning and configuration of 30KW or-grid roof top solar power plant with net metering
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
AMC/CAMC of Solar Energy Power Plants - Comprehensive; OEM Authorized Service Provider; On-Grid Solar System
On grid Solar power plant
on grid solar power plant
Operation and maintenance of existing 1MW solar power plant at IP-Gooty, Anantapur Dist for 2 years(2nd Call)
Custom Bid for Services - Comprehensive Annual Maintenance Contract (CAMC) of 1000 KWp Roof top Solar power plant installed at ONGC Logistics Park facility, Vakalapudi, Kakinada for Two (02) Years Similar Category AMC/CAMC of Solar Energy Power Plants
Providing of Sump at 1Mega watt solar Power plant Dwarapudi Hill slop Area in Vizianagaram municipality. Est cost:1.80 lakhs
Jungle clearance & Checking healthiness of 1MW Solar Power Plant and assessment of repair cost at Katheru pump house near Rajamahendravaram
Construction of Integrated Collectorate complex at Srikakulam. Sub Work: Providing GRID connected Roof Top Solar Power Plant to the above Building.
Operation & Maintenance of 1MW Solar Power Plant for 5 years including Replacement of non-functioning inverter with new Solar Inverter at IP-Gooty, Anantapur District.
Custom Bid for Services - On Grid Solar Plant, Custom Bid for Services - Installation, Testing and Commissioning, Custom Bid for Services - AMC Charges Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected ... Top Solar Power Plant Service ... Top Solar Power Plant Service
Operation & Maintenance of 1MW Solar Power Plant for 5 years including Replacement of non-functioning inverter with new Solar Inverter at IP-Gooty, Anantapur District (2nd Call).
Solar PV Module, Elec Mech interlock, DG Auto Start
SITC OF 11/33 KV Transformer for the Integration of Existing 1MWp Solar power plant with the upcoming 33KV Power Supply System at Rajahmundry Airport
NABL testing charges for energy meters CTS, PTS, pertaining to 10 MW solar power plant interconnecting at 33/11 kv substation at Mudivedu near Madanapalli
FOR SUPPLY AND INSTALLATION OF SOLAR PV PLANT
Reverse E-Tender for Installation, Testing, Commissioning, Operation & Maintenance (10 years) of 500KWp Floating Solar Power Plant at Sangam Jagarlamudi Summer Storage Tank belongs to Guntur Municipal Corporation
Expression of Interest (EoI) from companies / firms to develop a Solar Power Project of 2000 Kwp as floating solar PV sytem over Mudasarlova reservoir in Visakhapatnam under Smarty City Mission.
Setting up of Solar Power Plant of 15 MW capacity for captive use of greater Visakhapatnam Smart City Corporation Limited in the state of Andhra Pradesh on PPP mode
Reverse E-Tender for Installation, Testing, Commissioning, Operation and Maintenance (10 years) of 500KWp Floating Solar Power Plant at Sangam Jagarlamudi Summer Storage Tank Belongs to Guntur Municipal Corporation
Design, Supply, Installation, Testing and Commissioning, Synchronization including 5 Years Operation and Maintenance of Roof top Solar Power Plant of Capacity 120 KWP at New Office Building Rajamahendravaram Municipal Corporation.
Wind Solar PV Hybrid System - Off grid (Q2) (3 (3 ))
AMC of NABL Testing charges for energy meters CTs, PTs, pertaining to 10 MW solar power plant interconnecting at 33/11 KV substation at Mudivedu near Madanapalli for the year 2025-26
AMC of NABL Testing charges for energy meters CTs, PTs, pertaining to 10 MW solar power plant interconnecting at 33/11 KV substation at Mudivedu near Madanapalli for the year 2025-26