Loading…
Loading…
214 results • Best match
OFF-GRID SOLAR POWER PLANT (PHOTOVOLTAIC)
Solar Power Plant (Q3)
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
PROVN OF 1 MW SOLAR POWER PLANT ALONGWITH ALLIED INFRA AT SIGAR UNDER GE 872 EWS
SUPPLY AND COMMISSIONING GRID CONNECTED SOLAR PV
Solar power pack with Solar panel (Q3)
SUPPLY AND ERRECTION OF 1 KW SOLAR ENERGY SYSTEM (Q3)
PROVIDING AND INSTALLATION OF 15 KW SOLAR POWER
PROVIDING AND INSTALLATION OF 20 KW SOLAR POWER
PROVIDING AND INSTALLATION OF 15 KW SOLAR POWER
Solar Photovoltaic Modules/Panels - Crystalline silicon terrestrial
solar power security light 50 watt, gi pole, coper cable, solar controller, installation
Unbranded 40.5 (wp) Class A Solar Photovoltaic Modules / Panels -, Unbranded 40.5 (wp) Class A Solar Photovoltaic Modules / Panels - Crystalline Silicon Terrestrial
Unbranded 100 (wp) Class A Solar Photovoltaic Modules / Panels -, Unbranded 100 (wp) Class A Solar Photovoltaic Modules / Panels - Crystalline Silicon Terrestrial
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off-Grid Solar Photovoltaic (PV) power plant (Q3)
Off-Grid Solar Photovoltaic (PV) power plant (Q3)
Off-Grid Solar Photovoltaic (PV) power plant (Q3)
Off-Grid Solar Photovoltaic (PV) power plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Off - Grid Solar Photovoltaic (PV) Power Plant (Q3)
Solar lamps (Solar Based Home Systems - Solar Power Packs - AC Models ) Bidder Turnover (Last 3 Years) 4 Lakh (s)
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) (3 (3 ))
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) (3 (3 ))
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) (3 (3 ))
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) (3 (3 ))
Off-Grid Solar Photovoltaic (PV) power plant Bidder Turnover (Last 3 Years) 4 Lakh (s)
EXIDE SPV application 100 12 V (for SPV application) Acrylonitrile, EXIDE SPV application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
SITC of 15 KWP Solar Power station in BOP Chamdrung BOP Monshing of 73 Bn Shergaon
Custom Bid for Services - ---- Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground Mounted Solar Power Plant Service
Supply, Installation , commissioning of 200 KWp roof top Solar Plant with mono crystalline PREC Photo Voltaic Panel with online solar inverter panel and net metering provision. at IOCL Doimukh Depot, Dist. Papum Pare, Arunachal Pradesh
Semi Integrated Two In One Solar Street Light, Thirty Watt Solar Street Light, Twelve point Eight V Twenty Four AH Lithium Ferro Phosphate Battery, Seventy Five WP Twelve V Solar PV Module Poly Crystalline, Six M GI Pole With Ligh Arm Panel Stand Nut Bolt
THIRTY WATT SOLAR STREET LIGHT, TWELVE POINT EIGHT V AH LITHIUM PH BATTERY, SEVENTY FIVE WP TWELVE V SOLAR PV MODULE POLY CRYSTALLINE, SIX MTR GI POLE WITH LED ARM PANEL STAND AND NUT BOLT, INSTALLATION CHARGE
SITC of 15 KWp off grid Solar Power Station in 02 Border Out Posts (BOPs) i.e BOP Bomja and Kungba (Suskha) of 38 Bn SSB Tawang under FTR HQ SSB Tezpur
EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery,, EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 150 Ah
Supplying installation testing and commissioning of 15 KWP off grid Solar Power Station each in 02 Border Out Posts BOPs BOP Chhamdrung and Monshing 73 Bn SSB Shergaon under FTR HQ SSB Tezpur
SITC of 15 KWp off grid Solar Power Station each in 04 Border Out Posts (BOPs) i.e Balemu, 900 chain, 700 chain and Rangthang Zor of 61 Bn SSB Balemu under FTR Tezpur
Supplying installation testing and commissioning of 15 KWP off grid Solar Power Station each in 04 Border Out Posts BOPs BOP Balemu 900 chain 700 chain and Rangthang Zorpam of 61 Bn SSB Balemu under FTR HQ SSB Tezpur
Solar Lamp (Solar Study Lamp)