Loading
Loading…
Loading…
3 live1 closing this weekmost from DG,BSF,MHA and Director TREDA
3 results • Best match
Installation of 25 KWp off grid solar power plant at 17 bopS OF 104 119 and 126 Bn SHQ TLM under FTR HA Tripura. SH Provision of separate distribution of power load of solar power plant of 70 Bn 104 Bn 173 Bn under SHQ BSF Teliamura
Electric Potter Wheel (Solar Ready) under MBI vertical
Design, manufacture, supply, erection, testing, commissioning of LED based Solar High Mast including Guarantee/ Warranty, Annual Maintenance Contract and insurance coverage for 5 (five) years on turn-key basis throughout the State of Tripura