Loading…
Loading…
1,329 results • Best match
OFF-GRID SOLAR POWER PLANT (PHOTOVOLTAIC)
Hybrid Solar Power Plant 1 KW Wind plus Solar System alongwith connected items as per store list attached.
Hybrid Solar Power Plant 1 KW Wind plus Solar System alongwith connected items as per store list attached.
LOOM SOLAR Solar Power Plant (Roof Top) for ONGRID System, 50, LOOM SOLAR Solar Power Plant (Roof Top) for ONGRID System, 50 KW
Supply, Installation and Commissioning of 60Kwp on-Grid Solar Power Plant using existing Solar PV Modules and existing MMS including 5 years of CAMC
Provision of Solar Power Plant at Lilabari Airport
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3)
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Unbranded Solar Power Plant (Roof Top) for ONGRID System, 6 KW
20 kWp Off-Grid Hybrid Solar Power Plant at Tezpur University
Supplying installation testing and commissioning of 20 Kwp ongrid solar power plant at SIB, Barpeta, Assam Subwork/Packages: SITC of ongrid solar power plant
PROVN OF 1 MW SOLAR POWER PLANT ALONGWITH ALLIED INFRA
Providing 50KWP roof-top hybrid solar power plant at District Hospital, Sonapur, Kamrup(Metro)
Design, Supply, Installation and Commissioning of 15 KWp Rooftop Off Grid/Hybrid Solar Power Plant with 5 (five) years of Maintenance and Performance Warranty Contract at Central Institute of Technology Kokrajhar, BTAD, Assam
Design, manufacture, supply, erection, testing and commissioning including warranty, operation and maintenance of Grid Connected Rooftop Solar Power Plant at different locations in the State of Assam
Restoration of 25 KWp on grid Solar Power Plant at Tezpur HO under Assam Circle
AMC/CAMC of Solar Energy Power Plants - Comprehensive; Others; On-Grid Solar System
Supply, Installation, Testing and commissioning including 5 years Operation, Comprehensive Warranty and Maintenance of Off Grid Solar Power Plant to be installed at important historical, religious places like Satra in Assam
Maintenance and Operation of 01x100KWP Solar Power Plant installed at Jorhat Garrison of HQ 25 Sect AR
AMC/CAMC of Solar Energy Power Plants - Non- comprehensive; Others; On-Grid Solar System
Design, Supply, Installation, Testing and Commissioning of 150 KWp Ground Mounted Solar Power Plant at Silchar Airport
PROVN OF ROOF TOP SOLAR POWER PLANT AT CERTAIN BUILDINGS AT AF STN MOHANBARI UNDER GE (AF) MOHANBARI
SITC of 6 Nos. of 3 Kwp Rooftop Ongrid Solar Power Plant for 6 post offices in Assam Circle.
Supplying installation testing and commissioning of 20 KWp Grid connected Rooftop Solar PV Power Plant at RCIPMC, Guwahati Assam Subwork/Packages: SITC of Solar power plant
IMPLEMENTATION OF OFF GRID SOLAR POWER PLANT TO BE INSTALLED IN DIFFERENT RURAL PHCS THROUGHOUT THE STATE OF ASSAM UNDER STATE BUDGETARY SUPPORT OF ANNUAL PLAN 2019-20, GOVT. OF ASSAM
IMPLEMENTATION OF OFF GRID SOLAR POWER PLANT TO BE INSTALLED IN DIFFERENT RURAL PHCS THROUGHOUT THE STATE OF ASSAM UNDER STATE BUDGETARY SUPPORT OF ANNUAL PLAN 2019-20, GOVT. OF ASSAM
Design, supply, installation, testing, commissioning of 70 KWp roof top Grid tied Solar Power Plant and 10 KWp Grid tied Solar Tree at PTC Guwahati.
Implementation of Grid Connected Solar Power Plant at different locations of Janata Bhawan and Minister Colony, Dispur, Assam. Site Visit is mandatory for submission of Tender.
IMPLEMENTATION OF OFF GRID SOLAR POWER PLANT TO BE INSTALLED IN DIFFERENT RURAL PHCS THROUGHOUT THE STATE OF ASSAM UNDER STATE BUDGETARY SUPPORT OF ANNUAL PLAN 2019-20, GOVT. OF ASSAM
1050 KWp Solar PV system,
Soil investigation for Provn of 1 MW Solar power plant at Point A B as per site plan at Lichubari Army Cantt Area
Providing and Installation of 5 KWP Solar Power Plant at BOP Bishing of 49 Bn, ITBP, Basar, Arunachal Pradesh
Solar PV Plants RHQ and BNC
ROOFTOP MOUNTED SOLAR PV POWER PLANT
GRID CONNECTED SOLAR PV POWER PLANT
Design, Fabrication, Supply, Installation, Testing, Commissioning of Solar PV Plant at KLHEP
LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV, LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV Module:300 Wp, Battery:24V, 120 Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models
LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV, LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV Module:300 Wp, Battery:24V, 120 Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models
ROOFTOP SOLAR POWER PLANT OF TOTAL CAPACITY OF 160 KWP IN NHPC POWER STATION/UNIT AT LOWER SUBANSIRI H.E. PROJECT IN ASSAM STATE WITH WARRANTY, COMPREHENSIVE OPERATION AND MAINTENANCE FOR 5 (FIVE) YEARS.
Providing, installation, testing and commissioning of 25 KWp off Grid Solar Power Plant at 15 BOPs of 16 Bn BSF of SHQ Silchar under FTR HQ BSF MnC.
Providing, installation, testing and commissioning of 25 KWp off Grid Solar Power Plant at 16 BOPs of 170 and 134 Bn BSF SHQ Silchar under FTR HQ BSF MnC.
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6579219 Dated : 18-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Installation of 1MWp grid connected Solar PV Plants at Bokajan
Installation of 1MWp grid connected Solar PV Plants at Bokajan