Loading…
Loading…
269 results • Best match
60/2021-22 CONVERSION OF HANDPUMP INTO PIPED WATER SUPPLY SCHEME BASED ON SOLAR PUMPING SYSTEM UNDER JJM AT VILLAGE BHANPUR BLOCK DHOLPUR DISTT DHOLPUR WITH ONE YEAR DEFECT LIABILITY PERIOD
61/2021-22 CONVERSION OF HANDPUMP INTO PIPED WATER SUPPLY SCHEME BASED ON SOLAR PUMPING SYSTEM UNDER JJM AT VILLAGE HAIDALPUR BLOCK SAIPAU DISTT DHOLPUR WITH ONE YEAR DEFECT LIABILITY PERIOD
65/2022-23 CONVERSION OF HANDPUMP INTO PIPED WATER SUPPLY SCHEME BASED ON SOLAR PUMPING SYSTEM UNDER JJM AT VILLAGE HAIDALPUR BLOCK SAIPAU DISTT DHOLPUR WITH ONE YEAR DEFECT LIABILITY PERIOD
AC/DC Clamp meter cum Multi meter. Detailed configuration as per attached Annexure. specn: As per Model no. KOICO 3541 or kusum Meco KM 2006 or similar
TRUE VALUE RMS DIGITAL MULTIMETER AS PER TECHNICAL ASPECT ATTACHED. MAKE:- FLUKE /Kusum Meco/ METRAVI / SANWA / KRYKARD .(Note: Rate referance of SANWA (GeM P-ID:5116877-85983492938.
AC/DC Clamp meter cum Multi meter. Detailed configuration attached in Annexure "A". specn: As per Model no. KOICO 3541 or kusum Meco KM 2006 or similar
4_ Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(2), GP Gangrar IWMP-26 Block Gangrar
3_ Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(2), GP Gangrar IWMP-26 Block Gangrar
Supply, erection and commissioning of solar panel and solar pump in Pasture land in Jalgrahan committee Dhamana Under IWMP-XXVIII PS Dudu Jaipur
Supply, erection and commissioning of solar panel and solar pump in Pasture land in Jalgrahan committee Raseeli Under IWMP-XXV PS Dudu Jaipur
6_Providing and Installation Tubewell Boring, Drip Irrigation System, Solar Pump System in Horticulture and Forestry Plantation Work GP Chougawadi IWMP-26 Block Gangrar
Supply, erection and commissioning of solar panel and solar pump in Pasture land in Jalgrahan committee Raseeli Under IWMP-XXVIII PS Dudu Jaipur
2_Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(5), GP Sadi, Soniyana IWMP-19 Block Gangrar
1_Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(4), GP Palka, Keljhar IWMP-17 Block Chittorgarh
3_ Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(2), GP Gangrar IWMP-26 Block Gangrar
5_Providing and Insttalation Tubewell Boring, Drip Irrigation System, Solar Pump in Horticulture and Forestry Plantation Work, GP Gangrar Under IWMP-26 Block Gangrar
Supply, erection and commissioning of solar panel and solar pump in Pasture land in Jalgrahan committee Sanwali Under IWMP-XXVIII PS Dudu Jaipur
2_Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(5), GP Sadi, Soniyana IWMP-19 Block Gangrar
interlocking eint kharanja nirman kary may nali solar pump se kishori banjara ke ghar ki or avm vibhinn galiya sahit gram ngla surta
2_Providing and installation tube well Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(5), GP Sadi, Soniyana IWMP-19 Block Gangrar
3_Providing and Insttalation Tubewell Boring, Drip Irrigation System, Solar Pump in Horticulture and Forestry Plantation Work(2), GP Soniyana Under IWMP-19 Block Gangrar
5_Providing and Installation of Tubwell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(2) GP Gundali under IWMP-24 Block-Bhupalsagar
1_ Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(4), GP Palka, Keljhar IWMP-17 Block Chittorgarh
1_ Providing and Insttalation Tubewell Boring, Drip System, Solar Pump in Horticulture and Forestry Plantation Work(4), GP Palka, Keljhar IWMP-17 Block Chittorgarh
2_Providing and Insttalation Tubewell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(4) G.P. Delvas, Falodra, Bilot IWMP-21 Block Dungla
4_ Providing and Insttalation Tubewell Boring, Drip Irrigation System, Solar Pump System in Horticulture and Forestry Plantation Work GP Soniyana IWMP-19 Block Gangrar
2_Providing and Installation of Tubwell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(4) GP Usrol, Pari under IWMP-16 Block-Bhupalsagar
1_Providing and Installation of Tubwell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(3) G.P. Bhupalsagar, Falasiya, Usrol IWMP-16 Block-Bhupalsagar
4_ Providing and Installation of Tubewell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(2) G.P. Upreda, Rewada IWMP-28 Block Rashmi
22_Providing and Installation Tubewell Boring, Pipe Line, Solar Pump and Light in Pasture Development Work(3) G.P. Kannoj, Sukhwara, Dheerji Ka Kheda IWMP-22 Block-Bhadesar
9_Providing and Installation of Tubwell Boring, Pipe Line, Solar Pump and Light in Pasture Development(3) Works GP Banikiya Kalan, Chhapari under IWMP-27 Block-Kapasan
Supply, install, test and commissioning of 10 HP Capacity submersible Solar pump set with controller as per attached specification of GEM product ID No 5116877-94182083484
Forestry and fruit plant plantation work in pasture development including installation of solar pump, drip irrigation plant GP Gura and sawan ka Kyara PS Kotda PMKSY-2.0
Design, survey, supply, installation, testing, commissioning and 5 years CMC of distributed grid connected SPV systems for solarization of grid connected agriculture consumers in Sirohi district under KUSUM Scheme Component C on turnkey basis.
Design, survey, supply, installation, testing, commissioning and 5 years CMC of distributed grid connected SPV systems for solarization of grid connected agriculture consumers in Barmer and Jalore dist under KUSUM Scheme Component C on turnkey basis
Design, survey, supply, installation, testing, commissioning and 5 years CMC of distributed grid connected SPV systems for solarization of grid connected agriculture consumers in Jodhpur and Pali dist under KUSUM Scheme Component C on turnkey basis.
CONSTRUCTION OF TUBE WELL, PIPE LINE, DRIP SYSTEM AND SOLAR PUMP SET AT VILLAGE DURGAWATO KA NOHRA GP GHASA AND VILLAGE BAPER GP GHASA BLOKC MAVLI MJSA 2.0 ( PHASE-2 STATE FUND
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
CONSTRUCTION OF RCC GLSR AND PIPE LINE WITH SOLAR PUMP SET AT KOTARWALA, GP NEDACH, BLOCK DELWARA, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Fencing work and gate ,Cactus Plantation and land levelling Work , Boring with Solar pump ,Drip system ,sunken pond with HDPE sheet and Chokidar HUT in Bhatesari , Khasara no 109/110 Gram Panchayat Boorthal, under PMKSY- 2.0 WDC-6 PS-Bassi Ja
REPAIRING AND COVERING OF EXISTING OW AND PIPE LINE WITH SOLAR PUMP SET AT SARDAYA, GP NEGDIYA, BLOCK DELWARA, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Installation of Solar Power Plant through RESCO mode under KUSUM - A
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant