Loading…
Loading…
6,821 results • Best match
DRINKING WATER SOURCE
Supply, Installation, Commissioning of community based integrated mini Arsenic and Iron removal plant (AIRP) with solar pump at (i)Land of Sopel Munsi at Galaidaripara. (ii) Chandanpur Madrasa ground (iii) At Block Dev. Office of NAKASHIPARA
Providing And Suppling Solar Pumping Machinery At Bharvir Bk Tal Igatpuri Dis Nashik
WORK NO.1 PROVIDING AND SUPPLYING SOLAR PUMPING MACHINERY AT NANDURVAIDYA TAL.IGATPURI DIST.NASHIK.
Supply, Installation, Commissioning of community based integrated mini Arsenic and Iron removal plant (AIRP) with solar pump at (i)Battala at Sudhakarpur (ii) Land of School Building at Bangaria (iii) Land of Idgha Maidan at Muragachha Pa para
Construction of Water Vending Kiosk at different places ( Hill area ) within Nagrakata Block under Jalpaiguri District SH 2HP Off Grid Solar Pump, PV Module, Pump control Unit, Lowering Submersible Pump, Water Purification with RO and AMC for 5year
Construction of Water Vending Kiosk at different places ( Hill area ) within Banarhat Block SH 2HP Off Grid Solar Pump, PV Module, Pump control Unit, Lowering Submersible Pump, Water Purification with RO and AMC for 5year in HILLY AREA
Supply Installation Commissioning of Community based MINI AIRP with Solar Pump Set including Sinking of Tube Well at Kashibas Ruipukur GP Bhatjungla Kalipur HS and Jhitkipota Purbapara Baro Masjid under Krishnagar I Block under MSDP fund Sl 5
Construction of Filter Chember, near Karui Samiti Pump, at Karui Purbapara Football field, Karui Library,Karui Paschimpara football field, Paschim Karui Proddhan para Solar pump, near Kurchi Adibasi para, at Kurchi more East Side, Kurchi more West Si
1.PROVIDING AND ERECTING LED STREET LIGHT FITTING FOR DHANGARWADA AT VILLAGE SONNA T HATTA TQ BASMATH DIST HINGOLI 2.DRILLING OF BOREWELL AND ERECTING OF SOLAR PUMP SYATEM AT VILLAGE SONNA T HATTA TQ BASMATH DIST HINGOLI
Supply Installation Commissioning of Community based MINI AIRP with Solar Pump Set and Sinking of Tube Well at Jangalbash SSK near Jangalbash Barowaritala Bhaluka GP Anandabash Purbapara Idgaha and Bhaluka HS under Krishnagar I Block under MSDP Sl2
DISTRIBUTED CAPACITY GRID CONNECTED SOLAR PV POWER PLANT, AT GOVT. INSTT. OF HOTEL MANAGEMENT CATERING TECHNOLOGY, NAGPUR AND NIMBAJI AKHADA SAMAJ BHAVAN, TELIPURA, KAMPTEE AND 1 NO OF 10 HP SOLAR PUMP AT GRAM PANCHAYAT, KARAMBHAD, DIST NAGPUR
THE CREATION OF A NEW SOURCE OF DRINKING WATER (ACTIVITY DESCRIPTION _CONSTRUCTION INSTALATION OF THREE NOS SOLAR PUMP FOR DRINKING WATER AT SAMSAD NO_2_4,_5 UNDER KURSHAMARI GRAM PANCHAYAT WITHIN MATHABHANGA-I PANCHAYAT SAMITY IN THE DISTRICT OF
Repair of Road with Paver block From Dutta electronics To Paisapara more Paisna para Solar pump To Lokhnath Baba Mandir Construction of road with Paver block from Tantipara Durgamandir to Achkakali at ward no 3 within Raghunathpur Municipality
Repairing of Solar Pump at ICDS, Repairing Solar Pump at Mahalipara, Installation of Solar High Mast Light near Ramprasad Karmakar House
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design_survey_installation_commissioning_25 yrs_O_M from COD of grid connected SPP through RESCO Mode_its associated line_33 or 11 KV to connect plant to 33_11 KV substation_RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant