1,462 live809 closing this weekmost from Energy Department Uttar Pradesh and Karnataka Power Transmission Corporation Limited
1,462 results • Best match
Supply of various type relay for various Sub-station EE (MRT-Cum:S/s) Dn. CSPTCL Korba.
Erection of 11 KV Platform Mounted Sub-Station Facilities at Pump House-A in VFJ Estate
Construction of complaint center along with store and other civil works 33 KV Sub-Station Hassanpur
Construction of 33/11 KV Sub-Station (2x5 MVA) at Bhoomi Vikas Evam Grishthan Yojna, Bahraich.
Civil Work for Construction of 33 KV Bay (RDSS Scheme) at 132 KV Sub-station, Bhangel.
Civil Work for Construction of Store room at 220 KV Sub-station Metro Depot, Greater Noida.
Construction of 33 KV Sub Station Building and B-Wall at Mahadev Nagar under Jaisalmer Circle
Construction of 33 KV Sub Station Building and B-Wall at Khetasar Fanta under Jaisalmer Circle
Construction of Building and Boundary wall at 33 KV Sub-Station Kalirana Nagar under Phalodi Circle.
Construction of 33 KV Sub Station Building and B-Wall at Keshav Nagar under Jaisalmer Circle
Construction of 33 KV Sub Station Building and B-Wall at 113 RD under Jaisalmer Circle
Construction of 33 KV Sub Station Building and B-Wall at Rivadi (Bhiyasar) under Jaisalmer Circle
Construction of 33 KV Sub Station Building and B-Wall at Abhay Nagar under Jaisalmer Circle
Construction of new Control Room at 33/11 KV Sub-station Lehegaon Tal. Morshi Dist. Amravati
Establishing 2x20MVA, 66/11kV Sub-station at Sasvihalli Village in Harapanagalli Taluk, Vijayanagara District, Construction of 02 Nos. of 66kV Terminal Bays at existing 66/11kV Bennihalli Sub-station in Harapanagalli Taluk, Vijayanagara District and ... Bennihalli Sub -station ... Sub- station to ... Village Sub -station ... Sub- station for ...
Pre-Bid Tie up of 765kV GIS New Sub-station Package SS 178T Including AIS Extension for a Establishment of 765kV GIS at 765 400 kV Substation near PANIPAT and b Extension of 765 kV Pallu AIS Sub-Station associated with Transmission scheme for evacuation of power as part of Rajasthan REZ Ph-IV Part 6 6GW Bikaner Complex Bikaner V 6GW Part B through TBCB route prior to Rfp bid submission by POWERGRID to BPC
Repairing of 10MVA Power Transformer Make HHE, Sl.No.4802 at 110 22KV Thethampakkam Substation, Electricity Department, Puducherry
Periodic and preventive and Breakdown maintenance of Transformer Oil filtration Machine installed at the 220/33KV Grid Substation of Basundhara Area
Repairs and Maintenance to Control room building at 66/11 KV Sub-Station, Kutugal
Repairs and Maintenance to Control room building at 66/11 KV Sub-Station, Bevoor
SCHEDULE FOR PROVIDING ANNUAL MAINTENANCE OF DG SET AND SUB STATION AT SAMADHAN BHAWAN LOKAYUKT OFFICE BHOPAL
Construction of All Technical civil works of 66 KV Sub-Station Gadhram Khurd (Under operation circle Ropar)
Preventive Maintenance of 11 KV Overload Line of Kuya Feeder Under Golakdih Sub Station Under Bastacolla Area
Construction of 132KV dedicated transmission line to traction Sub-Station of Imphal Railway Station on turnkey basis.
Construction of 33 KV Sub Station Building and B-Wall at Punam Nagar (Habur) under Jaisalmer Circle
Periodic Civil maintenance work for all offices and Sub Station under O&M Division Buldhana Dist. Buldhana.
Establishing 2x20MVA, 110/11kV Sub-station at Naranapura by construction of 110kV LILO line using Lynx conductor from existing 110kV Ajjampura-Shivani line to proposed 110/11kV Naranapura Sub-station for a distance of about 2.571Km in Ajjampura, Taluk, Chikkamagaluru District.
Work of Erection of 66 KV D/C Line from Existing 132 KV Mehmdabad Sub Station to Proposed 66 KV Devki Vansol Sub Station on D/C Panther Tower with ACSR Panther Conductor under Nadiad construction division under Nadiad Circle.
Estimate for renovation of 11 KV AB Swich At. Various Village under Pirda Dc & KV isolator At. Pirda and Limdarha sub station under Pirda Dc & renovation location of 33/11 KV sub station under Patharla Dc of O&M Division Saraipali.
Work of conversion of existing 11 KV Overhead line to 11 KV Underground cable for Kasarpal feeder Phase - 1 from 33 / 11 KV Sub Station, Sal Sub Station, in the jurisdiction of Sub Division I, Bicholim, under Division V, Bicholim
SUPPLY OF LOGSHEETS AT 220 KV/132 KV SUB-STATIONS UNDER ETD, JAUNPUR
Construction of All Technical Civil Works of 66 KV Sub Station Power Colony Gurdaspur (under Op. Circle Gurdaspur)
Providing of 240 Sqmm UG Cable at 2nd Control House near Press Sub-Station in SVU Campus, Tirupati
Supply of 36 KV Vacuum Interrupter for various EHV Sub-station for EE (S/s) Dn. CSPTCL Korba
Renovation of Sub Station 400 KVA at Main Market Sogam under CDF grants of Hon ble MLA Lolab
Civil Work for Construction of 33 KV Bay (RDSS Scheme) at 132 KV Sub-station Sector-66, Noida.
Civil Work for Construction of 33 KV Bay (RDSS Scheme) at 220 KV Sub-station Sector-20, Noida.
Civil Work for Construction of 33 KV Bay (RDSS Scheme) at 220 KV Sub-station Sector-62, Noida.
Construction of 33 KV Sub Station Building and Boundary Wall at Bagseen sub div Sheoganj under sirohi circle.
Construction of 33 KV Sub Station Building and B-Wall at Gaj Singh ki Dhani under Jaisalmer Circle
Construction of 33 KV Sub Station Building and B-Wall at Chiman Singh ki Dhani under Jaisalmer Circle
Construction of All Technical civil works at new 66 KV Sub-Station Jhanda Kalan (Under operation circle Bathinda).
Providing additional 1x10MVA, 110/11kV Power Transformer at 110/11kV Kuditini Sub-station Ballari Taluk & District CALL-3.
Repair of Drain along Loktak-Leimatak Road between Tiddim Gate to Sub-Station Road Junction under Loktak Project.
Providing of Rain Water Harvesting system along with water sump tank at 66/11kV Sub- Station, Allimaranahalli
Day to day assistance in electrical maintenance work in HT and LT overhead lines/substation/ 33kV/6.6kV/415 V, LT/HT cable, electrical installation and 6.6kV/415V Sector Sub-station at Nigahi Township
Custom Bid for Services - AMC for SAS Sub Station Automation System for 220/132/33KV Ramgarh Substation under GOMD VII DVC Ramgarh for period of 730 days Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Supply, Erection, Testing and Commissioning of i) 132/33kV Sub Station at Vuyyuru (ii)02 Nos 132KV Bays (Telecom Portion Only) (iii) 132KV DC line from 400KV Gudivada Sub Station to the proposed 132/33kV SS Vuyyuru in Krishna District on turnkey basis
For Providing, Fixing and Installation of Biometric Attendance Device at various 220 KV and 132 KV Sub-station (Related office) Under Electricity Transmission Division-I Varanasi.
Engineering Supply Erection Testing and commissioning of 2x200MVA, 220 132 KV and 2x100MVA 220 33 KV Grid Substation at Panikoili with LILO arrangement from 220KV New Duburi Paradeep DC line to proposed 220 132 33 KV SubStation at Panikoili and 132KV ... 33KV Grid Substation Panikoili ...