Loading…
Loading…
2,574 results • Best match
Operantion and maintenance of old MPS and IPS sector-25 zone-III, Faridabad for 06 Months of electrical and mechancial Installations, Switch yard, Valves and all works contingent thereto
Construction for setting up Volleyball Court in the villages where HVPNL Sub Station Exists. (Sub Division Ambala)
Estimate for Repair and Maintenance, of existing Toe wall around the 66kv sub station Talakaur(Yamuna Nagar)
Replacement of problematic declared 12.5/16 MVA, 66/11 KV Power transformerat 66 KV Sub Station Malikpur
Creation of Double Bus Bar Arrangement along with Bus Coupler at 132 KV Sub-Station Atela-Kalan
Replacement of old and deteriorated control room wiring of non residential building at 66kv Sub Station Nalvi
Construction of 5.436 MVAr 33 KV capacitor bank with allied foundations at 132 KV sub station Behal
Providing and fixing of fiber sheet structure around the rest house area at 220kv Sub Station Shahabad
220 Kv AIS, S/Stn., Pali, Faridabad is one of the important sub-station of Faridabad, District.
220 Kv AIS, S/Stn., Meerpur Kurali is one of the important sub-station of Palwal, District.
Estimate for repair and maintenance of boundary wall at 220 kV Sub Station HVPNL, Jorian Yamuna Nagar.
Construction for setting up Volleyball Court in the villages where HVPNL Sub Station Exists (Sub Division Panchkula)
Repair and maintenance of trench and making trench cover and interlocking tile at 132 sub station Bhadurgard
HEW31 Construction of 33 KV Switching Sub Station at Sector-78 Faridabad with complete in all respect.
Repair and RePainting of Sub Station equipment Structure and Gantry etc at 220 KV GSS BBMB Jagadhri
Construction of 5.436 MVAr 33 kv Capacitor bank with allied foundations at 132 kv sub station Miran.
Painting of boundary wall and control room building at 132 kV Sub Station HSIIDC, Hissar Road, Rohtak
66 Kv AIS, S/Stn.,Nagina is one of the important sub-station of Nuh, District. T
Repair maintenance and white wash of 220 kV residential colony at 220 kv sub station HVPNL, Rohtak.
Repair, mtc, Tile flooring, Tile Terracing in the control room building at 220 KV Sub-station Sonta
CONSTRUCTION OF BOUNDARY WALL AND OTHER ALLIED CIVIL WORKS IN 33 KV SUB STATION ARYA NAGAR HISAR.
Replacement of old and obsolete false ceiling of main control room at 220 KV Sub Station Tepla
Creation of one 33kV line bay, Chain link fencing work at 132kV sub-station Newal (Civil Work)
Supply of 400 kV Draw Lead/Rod type RIP/RIS Bushing for various Substations of NR-I, NR-II and NER.
Repair modification maintenance and reliability improvement jobs at TPS and downstream unit substations
Supply of safety tool kit for contractual workers at various substations of NR1
HTI Substation Clamps/ Connectors, Rated Current 1600, HTI Substation Clamps/ Connectors, Rated Current 1600 Ampere
HTI Substation Clamps/ Connectors, Rated Current 2000, HTI Substation Clamps/ Connectors, Rated Current 2000 Ampere
HTI Substation Clamps/ Connectors, Rated Current 2000, HTI Substation Clamps/ Connectors, Rated Current 2000 Ampere
Creation of one no. 33KV bay for feeding 33KV substation Banbhori at 132KV substation Barwala
Augmentation of existing 66kV double busbar with twin zebra to double busbar with twin tarantula conductor at 220kV substation Pali, HVPNL Faridabad
Construction of School building A type double storeyed residential quarters TII 4 nos TIII 4 nos and TV 1 no electrical sub station etc including electrical installation and development works for Kendriya Vidyalaya at Mathana Distt Kurukshetra Sub Head Providing service of MLD for inspection vehicle computer operator and messenger cum peon for sub division III CPWD Patiala office
ARMO EI & Fans in office building (Basement plus Ground plus 3) of Central Excise & Custom Department at plot no. 5, Sector 25, Panchkula (Hr.) (SH: Providing services for operation & routine maintenance of EI, Sub-Station, DG Set, Fire Fighting System i/c water supply pump set and annual maintenance of AC plant, VRV System and UPS system etc.)
RMO EI & Fans, Compound Lights, Sub-Station equipment, wetriser system, sprinkler system, water supply pumps, 125KVA DG Set & 6 nos. 8 passenger lifts at Income Tax residential colony, Sector 20, Panchkula (Hr) during 2025-26 (SH: Repairing of existing fire fighting & conventional fire alarm system and electrical installation, replacement of burnt cables and other misc. electrical works)
Procurement of Substation HW Fittings
ORM OF SUBSTATION TRANSFORMERS HT
ORM OF SUBSTATION TRANSFORMERS HT
Rough Cost Estimate for Operation and Maintenance of IPS Sector-25 Zone-II Faridabad for 03 Months of Electrical and Mechanical Intallations Switch yard, Valves and All Works Contingency Thereto.
Operation and Maintenance of old MPS and IPS sector-25 Zone-III, Faridabad for 6 months of Electrical and Mechanical installations, Switch Yard, Valves and all works contingent there to.
Supply, Installation, Testing Commissioning for shifting of 18 Nos. 11 KV feeders from 66 KV Sub-Station, Sector-10A to 66 KV Sub-Station, Sector-37 Gurugram under (OP) S/Divn., DHBVN, Kadipur, Gurugram (under Op. Circle-I, Gurugram) on turnkey bas
Construction of 10.872 MVAr 33 KV capacitor bank and series reactor with allied foundations at 132 KV sub station Kairu. Estimate for construction of 10.872 MVAr 33 KV capacitor bank and series reactor with allied foundations at 132 KV sub station K
Special arrangement for flood control measures and other allied civil works at 132 KV Sub Station Jind (Old)..
Estimate for repair, mtc. and paint work of existing Boundary wall at 66kv Sub Station Rattangarh, Yamuna Nagar
Construction of ATC and Passenger Terminal building at Civil Aerodrome Pinjore, Panchkula. (Pdg. 11 KVA Sub Station Only)
Repair and maintenanace of existing chain link fencing for flood preparedness at 66kvthe sub station Chhachhrauli (Yamuna Nagar).
Work for repairing and fixing of fencing provided at 132kV Sub Station Israna HVPNL Panipat fy 2024-25
Providing and fixing vehicle parking shed in the premises of Control Room Building at 220kv Sub Station Rajokheri
Construction for setting up Volleyball Court in the villages where HVPNL Sub Station Exists. (Sub Division Yamuna Nagar)
Augmentation of 132kv sub-station Khurana from 2x20/25MVA,132/33kv transformers to 3x20/25MVA,132/33kv transformers
Special estimate for providing 2nd practice cricket pitch at 220kv sub station Madanpur Panchkula during FY 2023-24.