Loading…
Loading…
2,575 results • Best match
MOEI & Fans, street lights and residential qtrs. substation at SAI, NRC, Sonipat (SH- Special repair of EI & Fire fighting system at Archery center & 300 bedded hostel)
MOEI & fans, street lights and residential qtrs. & substation at SAI, NRC Sonipat. (Sub head: - AMC & Special repair of Air Conditioning system at Archery center of Excellence)
Hiring of 01 no. vehicle on monthly rental basis for School duties and other associated official duties at Kaithal substation for the period of 03 years.
Replacement of Damage Trench cover in Transformer yard area ,Switch yard area and providing of new Gratings in Transformer yard area at RGTPP, HPGCL, Khedar
REPAIR TO LT PANEL FEEDER PILLAR BOXES AND OTHER ACCESSORIES AND CONNECTED DISTRIBUTION WORK AT VARIOUS SUB STATIONS AT CHANDIMANDIR
Tools and plants
Ferrule Printer (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6490031 Dated : 24-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 76050 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Cleaning And Stationery Items
Electrical items
Toilet Cleaner Liquid (V2) conforming to IS 7983 (Q4), Sweeping Broom (V3) (Q4), Air Freshener Solid and Gel (Q4), Air Freshener Liquid (V2) (Q3), Cleaning Duster (V3) (Q3), Glass Cleaner, Liquid (V2) as per IS 8540 (Q4), Household Laundry Detergent Powders as per IS 4955 (Q4), Disinfectant Fluids, Phenolic Type (V3) conforming to IS 1061 (Q3), Naphthalene (V2) as per IS 539 (Q4), Squeegee Washer Wiper Mopper (V2) (Q4), Toilet Soap, Liquid (V2) as per IS 4199 (Q4), Toilet Brush (V2) (Q4), Bamboo, Tent Pole as per IS 7344 (Q3)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Camera for CCTV System (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6828715 Dated : 10-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 405000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 41 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWER GRID CORPORATION OF INDIA LIMITED Power Grid Corporation of India Limited, GRID BHAWAN, OB-26, RAIL HEAD COMPLEX, NEAR BAHU PLAZA, JAMMU, JAMMU & KASHMIR-180012 (Powergrid Corporation Of India Limited)
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; JCB, Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Material Handling Equipment; Tractor with Disc Harrow, Tractor with Rotavator, Tractor, Tractor with Disc Plough, Tractor with C.., Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Crane; Mobile Crane
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 9 Litres; 1 Year to 2 Years
Automatic Fully Mechanised Organic Waste Machine for Compost (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6985374 Dated : 10-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 43200 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 65 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWER GRID CORPORATION OF INDIA LIMITED Power Grid Corporation of India Limited, GRID BHAWAN, OB-26, RAIL HEAD COMPLEX, NEAR BAHU PLAZA, JAMMU, JAMMU & KASHMIR-180012 (Powergrid Corporation Of India Limited) 2/7
HVPNL has decided to augmentation of 220/132 kV 100 MVA T/F with 220/132 kV 160 MVA T/F in Bay A-7 at 220 kV Sub Station HVPNL, Rohtak vide CE/PDandC HVPNL, Panchkula office Memo No. R-1772/Ch-81/NCR/RTK-3028 dated 19.04.2021 (copy attached). The GEL
Augmentation of 66 kV Substation Bhupani from 2x12.5/16 MVA, 66/11 kV T/F to (1x12.5/16 plus 1x25/31.5) MVA, 66/11 kV T/F.
Augmentation of 220 kV substation Hukmawali from 1x100 MVA 220 132 kV plus 1x100MVA 220 33kV transformers to 2x100MVA 220 132kV plus 1x100 MVA 220 33 kVTransformers.
Design Manufacturing Supply Erection Testing and Commissioning for additional 12.5 MVA, 33KV 11 KV transformer in existing Substation PSS-I at IMT Rohtak Haryana on turnkey basis.
Supplying and spreading of bajri in Addl TF Bay Daultabad Harsaru CKT I and II bay and all bays under 66KV Bus II at 66KV SubStation Harsaru
AMC of Operation and Maintenance of 11 KV Substation, Central AC Plant, DG Sets and Fire Alarm System of ABTC Building and Operation of water Supply Pumps
Design, Manufacturing, Supply, Erection, testing and commissioning of Electrical plus Civil work for 2x12.5 MVA, 33/11 KV Indoor substation at IE Narwana (Haryana) on turnkey basis.
Operation repairs and maintenance of Substation Transformers HT panels and DG set at MMC II SH Annual Maintenance and servicing of Cummins make DG Sets under MMCII
Construction of EVM and VVPATs Warehouse (4000 Unit) in the Campus of Mini Secretairt Complex at Hisar (Pdg. Spare Cable for 11 KV Substation )(Balance work) RECALL
Design, Manufacture, Supply, Erection, Testing and Commissioning of 33/11 KV indoor substation with 2x12.5 MVA power transformer at IMT Kharkhoda (B-1)(Haryana) on turnkey basis.
Custom Bid for Services - 9060C25D45 RPRC255397 Replacement of sandwich bus duct by cables of Transformers in substation 61 62 36 at Panipat Refinery Similar Category Support Services
Supply of Material, erection testing and commissioning for construction of 03 Nos. new 33 kV substations i.e. Saudapur under OP Circle Panipat and Sector-5 Rohtak and Kharinti under OP Circle Rohtak with associated 33 kV lines and 11 kV link lines
Construction of 06 new 33 kV AIS Air Insulted Substations i.e. 1 Behrampur 2 Pawti and 3 Narukheri 4 Munna Rehri 5 Alipur Viran 6 Kalsora with associated 33 kV and 11 kV link lines including complete civil works on turnkey basis
Replacement of existing damaged water proofing and rolling shutter of 4 Nos Electrical Substation buildings at NSG Campus Manesar Gurgaon Haryana for the year 2022-23 (Civil Works)
MOEI AND FANS SUBSTATION DG SET AT OLD AND NEW CGO COMPLEX NH IV FARIDABAD SH SITC OF OCTAGONAL POLES WITH STREET LIGHT WORK AT NH IV FARIDABAD
Operation repairs and maintenance of Substation Transformers HT panels and DG set at MMC II SH Annual Maintenance and servicing of Kirloskar make DG Sets under MMC II
NIT for construction of the creation of 2 no 220 KV GIS Line bay along with extension of 220 kv bus bar at 220 KV substation sector78 Faridabad
Design, Manufacture, Supply, Erection, Testing and Commissioning of 2X25/31.5 MVA, 66/11 kV Substation (AIS) with SAS in phase-II IE Barwala (Panchkula, Haryana) on turnkey basis.
BWN/196.18Lacs/Construction of Substation, boundary wall and Parking area around the New Mini Sectt. at Bhiwani in Bhiwani Distt. (BALANCE WORK BEYOND MAIN AGREEEMENT SCOPE OF WORK).
Construction of Special Home, Observation Home, Place of Safety, and Child Home at Village Beed District Hisar( Pdg. 11 KV Substation / DG set and Street/Security Lights only)
Upgradation of existing SCADA system with same make/replacement of the existing complete SCADA system with different make compatible upgraded SCADA system at 220 kV substation HVPNL Mau.
Proposal for technical and administrative approval to appoint one 01 vehicle (including driver) through the GeM portal for various works related to different departments of Powergrid Fatehabad Substation.
Custom Bid for Services - Repair & Calibration of Megger Make Winding Resistance Measurement (WRM) Kit at HVAC Agra substation Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
52kV, 3150A RIP Bushing with metal parts and Gaskets as per POWERGRID TS for NER, 52kV 3150 A RIP or RIS Bushing solid Stem with Metal Parts and Gasket for NR-III, 52 KV 3150 A LV RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-I, 52 KV 3150 A RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-II, 52kV 3150A, RIP or RIS Bushing Solid stem With Metal Parts And Gaskets for NR-II, 3150 Amps RIP or RIS bushing Solid stem type with metal part and gasket for Odisha, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for WR-I, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for ER-I
Supply of material, erection, testing an commissioning including civil works of 2 nos. new 33x11 kV Indoor AIS substations at Sehatpur and Sector 91, Faridabad to be fed from 220x33 kV substation, Palla under Op Circle, DHBVNL, Faridabad under RDSS
MOEI & Fans, street lights and residential qtrs & substation at SAI NRC Sonipa. SH - Miscellaneous electrical works i/c replacement of defective street light Subwork/Packages: Miscellaneous electrical works i/c replacement of defective street lights
1. ARMO of electrical services at Income TAX office, Building, Hisar. 2. ARMO of Elect. Substation, Generator set & Fire alarm at Income Tax Office Building, Rohtak. Subwork/Packages: Outsourcing of Elect. Service.
Annual Maintenance Contract for operation and maintenance of Air-Conditioning and Ventilation System at 2x600 MW RGTPP, Khedar, Hisar.
construction of 01 new 33 kV Substation Sarai with associated 33 kV and 11 kV link lines including complete civil works on turnkey basis under Op Circle UHBVN Jhajjar
Augmentation of 220 kV substation Hukmawali from 1100 MVA 220132 kV 1100 MVA 22033 kV transformers to 2100 MVA 220132 kV 2100 MVA 22033 kV transformer in FY 201819
CA NO GE(U)/CHM-42/2024-25 COMPREHENSIVE MAINTENANCE OF MISC B/R AND E/M WORKS OF VARIOUS ELECTRIC SUBSTATION AND OTHER AREAS UNDER GE (U) CHANDIMANDIR
Augmentation of 220 kV substation Samain from 1x100 MVA 220/132 kV with 2x100 MVA, 220/132 KV T/Fs for redundancy in 1st half of FY 2024-25.
Design, Engineering, Supply, Installation, Testing, Commissioning and Handover of 11/0.433kV Substation and Associated Works for newly constructed Hostel and MRC Building at THSTI, NCR Biotech Science Cluster, Faridabad
Appointment of IBBI Registered Valuer for Creation of LILO of 132kV S C Narnaund Bibipur line at 220kV Substation Petwar with ACSR Zebra conductor approx length 9 27 Km
132 kv Double bus bar arrangement along with bus coupler bay b-5 at 132kv substation HVPN Ismalibad. (site surfacing, dressing supply and spreading of crushed bajri (Civil Works)