Providing of oil plugging compound and plugging of oil leakage from following places/portions all in respect of 13233 kV20 25 MVA T 4 TF installed at 132kV Substation Khokhrakot HVPNL Rohtak
The work of Supply of material, erection, testing and commissioning including civil works of 33x11 kV Indoor AIS substation namely Ms Ansal Esencia under Op Circle 2, DHBVNL, Gurugram on turnkey basis
Construction of new transformer plinth in place of existing old and damaged plinth for 20.25 MVA 132.33kV TF T-1 and 16.8.8 MVA 132.33.11kV TF T-2 at 132kv substation Matanhail, Jhajjar
Supply of material erection testing and commissioning including civil works of 33/11 kV Indoor AIS substation Kadarpur Road Badshahpur under OP Circle II DHBVNL Gurugram on turnkey basis under RDS Scheme
Mobile GIS Substation Extn. Package MGIS-113 for Procurement of 01 No each 220kV and 132kV Mobile GIS Bays along with CRP, Auxiliary system etc. for meeting contingency requirement for NER constituents
Special Estimate for replacement of one no. faulty/defective BCU REC-650, Make ABB, Sr. no. T 1011121 installed on CandR panel of 33 kV Bani line feeder at 132KV substation HVPNL Dhudiyanwali.
Augmentation of 220KV substation sampla from 2x100MVA 220/132KV transformers to 3X100MVA 220/132KV transformers in FY 2021-22.(only civil work)-(Construction of Radiator foundation and Oil Tank foundation with CTR only.)
Creation of one No. 132 kV line bay at 220 kV substation Chormar to accommodate 2nd circuit of 132 kV Chormar (Balance work i.e. construction of Toe Wall, PCC and Spreading of Gravel)
Augmentation of 132 KV substation Beri from 1 20 25 MVA 132 33 KV TF 1X 1016 MVA 132 11 KV transformers to 2X 2025 MVA 13233 KV 1X 1016 MVA13211 KV TF
Construction of Academic Teaching block at Regional Centre Krishan Nagar (Lula Ahir) in Rewari District (Pdg. Fencing on metering panel and H-pole and Tin shade for DG set, substation, metering panel only)
Augmentation of existing 3 no 220kV S/C link between 400kV substation sector-72 Gurgaon (PGCIL) and 220kVSubstations Sector-72 Gurgaon (HVPNL) from single moose ACSR to twin Moose ACSR conductors by HVPNL
Construction of 01 No 33kV bay at 132kV substation Sector-9 Jind for feeding Sant Shiromani Shri Dhanna Bhagat Ji Govt. Medical College, Jind as a deposit work of HSRDC in FY 2024-25
The estimate for repair and maintenance of control room building i.e floor, door and window, roof tiles, plaster work , paint work , chain link fencing and existing premix carpet road at 66 kv substation ladwa.
Augmentation of 132kv substation Chaku Ladana from (2x20/25 MVA , 132/33kv plus 2x10/16 MVA, 132/11kv )transformers to (1x20/25 plus 1x40/50) MVA, 132/33kv plus 2x10/16MVA, 132/11kv transformers
Creation of 1 no. 33 KV bay at 132 KV substation Sampla to feed 12.5MVA load of 33 KV s/stn Ismaila in FY 2022-23 at 132 KV S/stn Sampla. (Civil Work Only)
Dismantlement and erection of 132/11KV,10/16 MVA T/F T-2 for providing additional 20/25 MVA 132/33 KV T/F along with 33 KV bansa bay at 132 KV substation Jundla
Aug. of 220 Kv substation Mehnakhera from (2x100MVA) 220/132 Kv plus (1x100 MVA)220/33 KV transformers to 2x100 MVA 220/132 KV plus 2x100 MVA 220/33 KV transformers - Work for SAS Integration
Creation of 2 No. 220kV line bays at 220 kV substation IMT Bawal to accommodate the 220kV lines mentioned at Sr. no.4 by HVPN as a deposit work of HSIIDC in FY 2024-25.
Augmentation of 132kv substation Siwan from (1x40/50MVA, 132/33KV) plus (1x16/20MVA plus 1x10/16MVA) 132/11KV to (1x40/50MVA plus 1x20/25MVA) 132/33KV plus (1x16/20MVA plus 1x10/16MVA) 132/11KV transformer
Creation of 2 Nos. 220 kv GIS Line bays at 220 kv Substation Sector-58 Faridabad to accomodate 220 kv D/C Sec-58 Faridabad-TSS Ballabhgarh line as a deposit work of indian railways.
Augmentation of 132kv substation Kangthali from (1x40/50MVA 132/33KV) plus (1x16/20MVA plus 1x10/16MVA) 132/11KV to (1x40/50MVA plus 1x20/25MVA) 132/33KV plus (1x16/20MVA plus 1x10/16MVA) 132/11KV transformer
Augmentation of 220 kv A-4 Substation Faridabad from 2x100 MVA to 2x160 MVA , 66/11 KV T/F - Construction of balance allied equipment work of 01 nos 160 MVA , 66/11 KV T/F
Augmentation of 220 KV substation Bhadana from 2x100 MVA, 220/132 KV T/F plus 1x16/20 MVA 132/11 KV T/F to (1x160 plus 1x100) MVA, 220/132 KV T/Fs by HVPNL.
Annual Maintenance of Electrical installations (E.I.) i.e. electrical wiring, switches, sockets, MCBs, MCCB, DBs, cables, Panels, fans , exhaust fan and electric substation etc. in HSVP office building sector -12, Faridabad for the year 2024-25.
Augmentation of 132 kv Uklana from 1x20/25 MVA,132/11 kv T/Fs to 2x20/25 MVA,132/33 kv plus 2x16/20 MVA,132/11 kv T/Fs by HVPNL for redundancy. Subject to extension of switchyard at 132 kv S/Stn. Uklana in 1st half of FY 2024-25
Rplacement of 11kV S/C XLPE 630 sqmm cables with 11kV S/C 1000 sqmm XLPE cables on 25/31.5MVA 66/11kV T-3 T/F at 220kV S/Stn HVPNL Daultabad. 220kV substation HVPNL D
Augmentation of single bus bar to double bus bar arrangement with 0.4 ACSR conductor along with bus coupler bay and allied equipments to accommodate 132 kv circuits at 132 kv substation Charkhi Dadri II. (Package 1)
Construction of 02 nos. 100 MVA Transformer plinth 220/33, Tower and Equipment Foundations of 220 and 33 kV, ODCT, Drain, 01 no. anti-fire wall, site surfacing work and allied work at 220 KV Substation Bakana.
Augmentation of 66kV substation Rattangarh from 2X12.5/16MVA 1x12.5/16MVA(Hot) 66/11kV T/F to 1X12.5/16 plus 1X25/31.5 plus 1X 12.5/16(HOT) MVA 66/11kV power T/F during the year 2026-27.
Special Estimate for Repair of Roof, Outer White Wash, Room No. II Door, Window, Toilet and Bathroom repair of B-Type Subordinate Rest House at 220/132KV Substation Power House Colony, HVPNL, Karnal in FY 2025-26
augmentation of 132kV substation Bhadson from Ixl6/2OMVA 132/33kV plus 2x 10/16MVA 132/ll kV transformers to (1x16/20 plus lx20/25)MVA 132/33kV plus 2x 10/ 16MVA 132/1 lkV transformers by HVPNL.
Augmentation of 132 kV substation Shahpur Begu from 1x20/25 MVA 132/33 plus 2x10/16 MVA transformer to (1x20/25 MVA plus 1x16/20 MVA) 132/33 kV plus 1x10/16 MVA 132/11 kV transformers.
Surveying charges for Creation of LILO (composite) of existing 132kV SC Nunamajra- Badhana line to 132kV substation MIE Bahadurgarh using Monopole Multi circuit Double Circuit towers with 0.4 Sq. inch ACSR conductor and partially through 132kV IC
Augmentation of 132 KV substation Beri from 1 20 25 MVA 132 33 KV TF 1 10 16 MVA 132 11 KV transformers to 2 2025 MVA 13233 KV 1 10 16 MVA 132 11 KV TF
Sinks (Q3), Sinks/Wash Basins - Vitreous China as per IS 2556 (Part 4) (Q3), Flushing Cistern (Q3), Towel Rail/Ring for Bathroom (Q3), Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services as per IS 781 (Q3), Commercial CPVC Pipe Fittings (Q3) (3 (3 ))
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Sinks (Q3)
sports items
Technical Grade Sulfur Hexafluoride (SF 6) for use in Electrical Equipment as per IS 13072 (Q3) (3 (3 ))
Refilling
Sinks/Wash Basins-Vitreous China-IS:2556- Part 4 (Q3)
400 KV Capactior Voltage Transformer
Glyphosate 41% SI (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6439187 Dated : 10-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Acrylic letter and SS letter signage 3d letters logo
Sweeping Broom (V3) (Q4), Toilet Cleaner Liquid (V2) conforming to IS 7983 (Q4), Disinfectant Fluids, Phenolic Type (V3) conforming to IS 1061 (Q3), mosquito repellant cream spray and lotion (Q4), Naphthalene (V2) as per IS 539 (Q4), Squeegee Washer Wiper Mopper (V2) (Q4), Household Laundry Detergent Powders as per IS 4955 (Q4), Bathing Soap Bar (V2) (Q4) ( ( 3 3 ))
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 9 Kg; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 18; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 22; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 5 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 10 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Foam Based Fire Extinguisher; 50 Litres; 1 Year to 2 Years
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Crane; Hydraulic Crane, Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; JCB
Replacement of damaged water supply line of 100mm i/d PVC pipe with required specials near house No.145(E) to electric substation, along green belt in Sector-2, U/E, Rohtak and all other works contingent thereto
Retile terracing in 4 no Type III category houses,repair and maintenance,white washing,colour washing of residential colony at 66 kv substation. old Manesar TypeII 15 No and Type iii 07 Nos for the FY 2019-20.