Painting of CRB and Boundary wall and other tit bit civil maintenance work at Ramsagar 33and11 KV Sub station under Bishnupur Division WBSEDCL
Laying, commissioning of 3 phase 3-core 6.35/11KV (E) 185 sq.mm XLPE insulated power cable, Construction of 4X200KVA distribution sub-station at Udaipur, Kakraban, Dhajanagar, Matabari Electrical sub-division area which was damaged during flood
Repairing and overhauling of CR Panel controlling of 12.5 MVA, 33KV/11KV transformer- 02 nos, Sl no- 93 WG -005/1 and sl no- 93 WG-005/2 at 33 KV sub-station bhalgora, PB Area.
Offer for execution of work required The work of Repairing of wiremesh fencing around the LT distribution T/F in the area of 33/11 kv SUB Station Jawahar Bhawan under the jurisdiction of EUDD Rajbhawan
Construction of Approach Road, Cable Trench, Switchyard Development, Fencing with gate, Renovation of Control Room Building, Drainage and allied works at Debra 33 / 11 KV. Sub-Station, Dist.-Paschim Medinipur
Erection of earth pit at 33/6.6 kV Substation switch yard and weigh bridge during Monsoon 2020-21 of Kakri Project. (For detailed description please refer to scope of work section of NIT document).
Const of 33 KV S/S Bldg (Urban double storey), Boundary wall ,Earth filling and Approach Road at 33 k v sub station Hanumangarh Junction(Sector number 12)(DistrictHanumangarh) (UBN JVV2122WSOB00423)
Construction of 11 KV separate feeder from 33/11 kv Sub Station Clyde Road to CSRI-NBRI, Rana Pratap Marg , Lucknow and other associated works in the area under EUDD Rajbhawan
Construction of Bays and installation of Auto-Transformers at different Sub-stations and Powerhouse Switchyard
Repairing and reconditioning of 11KV Capacitor bank with Bus-bar Control Panel and reactor, residual voltage transformer at Central sub-station Basantpur under Hazaribag Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SUB STATION; Switchyard; Buyer
Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - SUB STATION; Switchyard; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SUB STATION; Switchyard; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SUB STATION; Switchyard; Buyer
PLANNING, DESIGN, ENGINEERING, MANUFACTURE or SUPPLY, ERECTION AND COMMISSIONING OF COLONY NEW SUB-STATION INCLUDING ELECTRICAL AND CIVIL WORK AT UCIL COLONY, TUMMALAPALLE
Repair and Renovation work of Boundary wall and replacement of damaged cable trench precast slab at Burnpur Sub Station under GOMD II, DVC.
110kV Sub Station Rayonpuram Providing Ex-servicemen security personnel for a period of one year from 01-04-2024 to 31-03-2025
110kV Sub Station Perumbavoor Providing Ex-servicemen security personnel for a period of one year from 01-04-2024 to 31-03-2025
CONSTRUCTION OF CIVIL WORKS OF 33_11 KV SUBSTATION SWITCH YARD FOR GOSI BK LIS
Renovation of Earth mat in the 220/33KV Switch yard at 220KV Substation Kodur.
(1) Repairing and renovation of incoming -01 control panel outgoing -01 control panel of 10 MVA power transformer no-01 of 33 KV/6.6KV KC2 pit sub station of Katras Area-iv. (2) Maintenance earth pit and removal of grass, weed
SUPPLY AND INSTALLATION OF 4 NOS. CHEMICAL EARTH PIT AS REQUIRED CHEMICAL FIELD GEL, EARTH PIT ELECTRODE GI PIPE OUTER DIA 76 MM, TERMINAL DIA 20MM, LENGTH 3100MM, AT 33 KV RAMKANALI REGIONAL SUB BANSJORA SUB-STATION OF KATRAS ARERA.
REPLACEMENT OF SILICA GEL BREATHER 2 KG- 4 NOS, 05,KG - 4 NOS. WITH FITTING ALONG WITH ACCESSORIES AND REPAIRING OF OIL LEVEL INDICATOR OF CONSERVATOR TANK OF TR 3 AT 33 KV RAMKANALI REGIONAL SUB-STATION UNDER KATRAS AREA
Erection works i.e. PTR augmentation work from 6.3 MVA to 10 MVA and 33 KV Bus augmentation work from 100 sqmm ACSR DOG to 200 sqmm ACSR Panther at Aranghata 33/11 KV sub-station Under Ranaghat Division. under Ranaghat Division.
Construction(s), of the Equipment Foundation(s), Construction, of the C./Trench, for the C./Cable(s), and the allied Work(s), at the Buniadpur Sub-Station, at Buniadpur, under the Buniadpur (D) Division, in the Dist. Of Dakshin Dinajpur.
The scope of work covers the supply of Sub-Station Tool Kit of various sub-divisions working under Operation Circle, HPSEBL, Hamirpur under CEOHZ, HPSEBL, Hamirpur
Creation of 63 KVA Sub Station /Transformer at Khairpeth, Larnoo, Kokernag, Anantnag UNDER MPLAD
Work of Extension of Switch House Building at 66 KV Sub Station, Attari (Amritsar).
Creation of 250 KVA Electric Sub Station/ Transformer at Shah Mohalla, Harnag UNDER MPLAD
Establishment of one more 11/0.415KV Packaged Sub-station at MUWP houseSaradih, NTPC Lara
EXTERNAL ELECTRIFICATION AND CONSTRUCTION OF 33/11 KV GRID SUBSTATION WORK AT SCHEME NO.103 IDA INDORE
Making of a shed for temporary parking the vehicle at 220/33KV Grid substation Garjanbahal, Basundhara Area
EXTERNAL ELECTRIFICATION AT SECTOR-D SUPER CORRIDOR SCHEME NO. 151 AND 169B GRID SUBSTATION WORK AT INDORE
Replacement of 10 nos. 11 KV VCB panel relays at 66 11 KV Grid Substation, PGIMER, Chandigarh
RENOVATION OF SBAs ( BLOCK-I) AND JEs RESIDENTIAL QUARTERS AT 50MVA, 132/33KV GRID SUBSTATION BATTAL - MANWAL
REPLACEMENT OF 110V 2X55 NO 300AH BATTERY BANK AT GRID SUBSTATION SHEERI UNDER JURISDICTION OF TLMDIII AMARGARH
Gravelling and concreting of switchyard area at Howrah ss, under DVC, GOMD-I, Howrah.
Facility Management Services - LumpSum Based - PARKINGS SHED AT 33/11 KV SUB STATION SECTOR-4 GOMTI NAGAR EXTENSION LUCKNOW; PARKINGS SHED AT 33/11 KV SUB STATION SECTOR-4 GOMTI NAGAR EXTENSION LUCKNOW; Consumables to be provided by service provider ..
Facility Management Services - LumpSum Based - WATER LOGGING WORK AT 33/11 KV SUB STATION HAL INDIRA NAGAR; WATER LOGGING WORK AT 33/11 KV SUB STATION HAL INDIRA NAGAR; Consumables to be provided by service provider (inclusive in contract cost)
PAINTING OF PLINTH IRON STRUCTURES ALONGWITH POLES OF SWITCHYARD OF RANGAMATI 33 11KV SUBSTATION UNDER MIDNAPORE DIVISION
Balance portion of the work of construction of 110kV Terminal bays at existing 110/11kV Mamdapur Sub-station in Gokak Taluk and 110/11kV in Yaragatti Sub-station in Soundatti Taluk, Belagavi District and Balance portion of the work of construction of ... Mamdapur Sub -station ... Sub- station to ... Yaragatti Sub station for ...
Construction of RCC box culvert, internal road, switchyard fencing, switchyard development and other allied civil works at Rubber Park 33/11KV Sub-Station under Howrah Division-I,WBSEDCL in the Dist. Of Howrah
Improvement Maintenance Emergent Works on HTLT network and Sub Station of Various Capacities of Electric Division Vijaypur
For Oil Filtration of transformer for all 06 nos. Sub-Station of Tetulmari Colliery under Sijua Area.
Construction of 33KV.Line Haldi to Khankat Sub Station andmaintenance of old 33KV Jhankat feeder under EDD, Khatima.
Cleaning of sub-station yard, Maintenance of 15 KM Long HT OH line and providing lightning protection at different location of Block-B Mines and substation
Repairing of Main gate, Security compound wall, white washing and other misc. civil work of 132 KV Substation and GP Tariff Sub Station of Gevra Area.
Renovation installation and commissioning Trip supervision relays in 33KV, 11 KV and 3.3KV control panel installed at main sub-station and Shantinagar substation of Lingaraj Area.
Constructoin of 33 kv Double Circuit Underground Line From 220 kv Sub station sector-32 to 33/11 kv Substation ESS-1 and 2Sector -28,YEA
Cleaning of sub-station yard, Maintenance of 15 KM Long HT OH line and providing lightning protection at different location of Block-B Mines and substation