Laying of CC Road and CC Drain from H.No. 9-4-504/2 to 9-4-546/a Sub Station to Ramalayam Temple Road in Division 35.,MCK Karimnagar Est.Cost.Rs.45.00Lakhs
Road cutting restoration for laying of 220 KV /132 KV XLPE insulated UG Cable from Borabanda cross road to Erragadda 220 KV sub station in Erragadda division, Division-19, SLPZ, GHMC
Laying of CC Road from Venkateshwara Nivas to car Garage via Sub Station in lane No.5 P & T colony in Medipally in Peerzadiguda Municipality Under Municipal General Funds 2018-19.
Restoration of CC road cutting done by TSSPDCL-WCGH from A.S rao nagar kaman to A.S Rao nagar sub station in A.S rao nagar , Ward No.2 of Kapra circle, GHMC
Construction of PME/IME/CMB new block including filing room, testing block, open shed for waiting and dining, sub station, toilet block at Main hospital, Kothagudem, Bhadradri Kothagudem Dist., Telangana State.
Extension of mobile crusher sub-station and providing shed near sump at Kistaram OC, Sathupalli (Invited under earmarked work - SCCL Registered contractors belongs to SC community only are eligible to participate)
Shifting of 450mm dia water supply pipe line at Priya mess near sub station nala crossing near Shapoor Nagar main road under Jeedimetla Section, SD-II, O&M Dn-XII, Quthbullapur.
Erection of 33 KV Bay extension with 6 Nos. 33 KV VCBs for take-off arrangements of multiple circuits at 132/33KV K.MPally Sub-station in Devarakonda Division of Nalgonda circle
Extension of supply to 1 No HT service for a CMD of 6000KVA with a CL of 6000HP under Cat HT IX to Ms Depot Manager TSRTC Hayathnagar 2 depot in Hayathnagar Section of Hayathnagar Sub Division in Saroornagar Division of Saroornagar Circle by erecting ... Hayathnagar Sub Station with ... Hayathnagar Sub Station
ERECTION, TESTING AND COMMISSIONING OF 33/11KV INDOOR SUB STATION WITH 2X 8MVA PTRS ALONG WITH CONSTRUCTION OF CONTROL ROOM, COMPOUND WALL ALONG WITH MS GATE AND BOREWELL, CABLE TRENCHES, POWER TRANSFORMER PLINTHS, TOILET BLOCK, ELECTRIFICATION, ... INDOOR SUB - ... SUB- STATION AT ...
Operation and Maintenance of Electrical and Mechanical installations in NCCBM, Hyderaad during 2026-27. SH: Operation and Maintenance of Sub-Station equipment and Annual Maintenance of 200 KVA, 62.5KVA DG Sets and 100 KWP Solar Power Plant. ... of Sub -Station ... Sub- Station equipment ...
SPECIAL REPAIRS TO CONVERSION OF HT 11 KV OVER HEAD LINE TO HT 11KV UNDER GROUND CABLE AT NEAR BADMINTON COURT TO DHRUVA SUB STATION AT CDM SECUNDERABAD UNDER GE(U) SECUNDERABAD
Laying of CC road from Devender Nagar Govt. Primary school to Mallapur main road Opp:33/11/KVA Sub-station at Rajiv nagar in Boduppal Municipality under SCSP 2017-18 (Re-called)
Shifting of existing temporary sheds such as Sub station shed, repair shed, rest shelter tire inflation platform etc., in the parking yard to other location inside the quarry at GKOCP, Kothagudem area.
Erection of New 33/11KV Sub station with Necessary equipment and Connected 33KV and 11KV lines at Husnabad(V) in Kodangal Sub division in Tandur Division in Vikarabad Circle(Reserved for ST)
Construction of Out-door sub-station for erection of 500 KVA,33KV/3.3 KV near summer storage tank at OCP-III EP-II at Rg-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
Arresting roof leakages with APP Membrane felt on roof of Casuality, OP rooms, PME Block, mortuary, Sub-station and HA, HB type quarters at Area Hospital, Ramakrishnapur Township, Mandamarri area (Phase-II).
Erection of 33/11KV Sub-Station at Theegalaguttapally in Operation section Theegalaguttapally in Karimnagar Rural Sub-Division of Karimnagar Division of Operation Circle Karimnagar under T&D /SI on partial turnkey basis
Providing HT supply and supply and erection of 200 KVA 11 KV / 433 V distribution transformer and necessary sub station equipments for newly constructed lecture theatre complex (Science faculty) at O.U. Campus
Formation of Sub-station shed with old steel materials inside RG-I old stores, RG-II area, Godavarikhani, Dist. Peddapalli, Telangana State.(Invited under earmarked work SC community are eligible to participate.)
Laying of CC road from H. No. 1-9-1113/27/F/337 to Opp. 33/11/CB sub station in Adikmet Ward, Division - 15, Sec-bad Zone, GHMC (Rs. 11.10 lakh)
Estimate towards Line Work for providing of lighting at Road No. 1, KPHB GHMC Play park near Balaji nagar sub station in 115 - Balaji nagar Division in Moosapet Circle- 23 - GHMC,KPZ
Construction of 33KV/3.3KV Sub-station for 4 Nos. of mobile crushers, Off-loading camp and 40HP/75HP pump motor etc., at VK Coal mine, Kothagudem area, Bhadradri Kothagudem Dist, Telangana State.
Operation and Maintenance of Sub-station equipment, RMO DG set, Pumpset, IEI Fans and Street lights and Annual maintenance of DG set at CGWB Campus, Tattiannarm, Hyderabad during the year 2025-26.
MOEI and RMO passenger Lifts, DG Set, Outdoor type sub-station at Income Tax Annexe and Main Building at Vanivihar, Bhubaneswar.SH-Replacement of light fittings, wiring, Fans, Switch, Sockets, Street light etc.
RMO passenger Lift, DG set, window type AC, outdoor type transformer sub-station, automatic fire alarm system and fire fighting system etc. at CE&GST, Bhubaneswar.SH-Operation of DG sets and Lift.
Rectification and reconstructtion of cable duct in switch yard in place of damaged,watering arrangements to earth pits,construction of kerb wall in switch yard at existing 220/132KV SS Bhoothpur,mahabubnagar circle.
Rectification of water stagnation in 132 kV switch yard area at 220 kVSS Banswada
Construction of switch yard outer and inner security fencing etc 3311kv SS Tripuraram section
Operation and Maintenance of Specialized Services 11KV 315 KVA Sub Station Street Lighting Fire Hydrant System DG set etc at FSTI CISF Hakimpet Hyderabad during 2024 2025 Subwork/Packages: Providing additional power points and Pedestal Fans in E Company
Electrical rewiring of Factory sub stations in side factory area
Erection, testing and commissioning of Switchyard for 6nos. 33/11 KV Sub Stations at i)Rainipalem, (ii) Thungapahad (iii) Thimmareddy gudem (Thopucharla) iv)Watchyathanda v) Valyathanda and vi) NSP Camp of Miryalaguda Constituency in Nalgonda Circle
Construction of Mini Box drain from Thummalakunta Maisamma Temple To Hanuman Temple at H.No.11-28-319, 11-30-417 to Opp; Sub station Auto nagar in W.No.29 WGL.(GENERAL FUNDS)(RECALL)
Construction of RCC Box Culvert of size 3.0m x 1.65m across the road for shifting 132KV cables from electrical sub station to electrical tower behind GHMC park on road no.45 Jubliee Hills.
Engaging labour for removal of silt/slussy soil, and carting the silt of box drain from Sana Hotel to Electrical Sub station, Hakeempet, under Nanal Nagar-69, Ward-9,Cir-13, KZ, GHMC
Construction of shed and plinth for power control of Air conditioners to workmen at MC and MD type Quarters and B-Power House Sub-station yard, Kothagudem Corporate, Bhadradri Kothagudem District, Telangana State.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Gadiguda (V and M) in Utnoor Division of Adilabad Circle under T and D/SI Scheme on partial turnkey basis.
Erection, testing and commissioning of 33/11KV Sub Station connected with 33KV & 11KV lines at National Institute of Animal Biotechnology (NIAB) in Gowlidoddi (V) in Gopanpally (M) of Gachibowli Division in Cybercity Circle.
Construction of balance compound wall upto nallah from South sub-station to restrict entry of public near KK nagar at OCP-III EP-II at Rg-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
Laying of VDCC road with RMC M30 from Banda Maissamma Junction to Kavadiguda Corporator office via Electrical Sub Station (Back Side of Indira Park) in Kavadiguda Ward-90, Division-15, Secunderabad Zone, GHMC.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Dhathojipet(V) in Kadam (M) in Nirmal Division of Nirmal Circle under Tand D/SI Scheme on partial turnkey basis.
2nd dedicated 11KV Power supply from Chilakalguda Sub-station for NTPC - SRHQ building at Plot No. 6-6-8/32 at Kavadiguda, Secunderabad in Paradise division of Secunderabad Circle under Capital Contribution Works.
Widening of C.C. Road from H.No. 10-114/2 to Electrical Sub Station and H.No. 10-31to 10-50 at Balaji Nagar Bandlaguda in Ward No. 113 Patancheru Circle-22, SLP Zone GHMC
SHIFTING OF 33/11 KV LUMBINI PARK SS BY ERECTION AND COMMISSIONING OF 33/11 KV INDOOR SUB-STATION BESIDE BUDHA PURNIMA PROJECT OFFICE, TANKBUND, HYDERABAD UNDER DCW WORKS IN MASTERPLAN HYDERABAD CIRCLE
Erection of new 33/11KV Sub Station with connected 33KV & 11KV lines along with Construction of control room & other civil works at Murthuzaguda Village in Moinabad Mandal of Ibrahimbagh Division in Cybercity Circle
KTPS-VII Stage-ADM-SS-Laying of 11KV, 240Sqmm XLPE Power cable from FGD/KTPS VII Stage to 33/11KV Sub-station in CD-II section of GS Sub division/KTPS-VII Stage
Erection of new 33/11KV Sub Station with connected 33KV & 11KV lines along with construction of control room & other civil works at Tummulur Village in Maheshwaram Section of Kandukur Division in Rajendranagar Circle
CONSTRUCTION OF COMPOUND WALL FOR NEWLY ALLOTTED LAND OF UPPAL BHAGAYAT PHASE-II LAYOUT, FOR PROPOSED OF NEW 33/11KV SUB-STATION IN HABSIGUDA CIRCLE, MASTER PLAN RR CIRCLE OF MASTER PLAN ZONE
Erection of new 33/11 KV Sub-Station with connecting 33KV & 11 KV lines along with civil works at Munugodu Bypass road, Nalgonda Town-III Section in Operation Division Nalgonda of Nalgonda Circle
Erection of new 33/11KV Sub Station with connected 33KV & 11KV lines along with construction of control room & other civil works at Gokafasalwada Village in Doulthabad Mandal of Tandur Division in Vikarabad Circle