Loading…
Loading…
2,460 results • Best match
PAINTING OF MS STRUCTURES OF 132 KV AND 33 KV SWITCHYARD AT 132 KV SS MANCHERIAL IN OMC ADILABAD.
Painting to the structures in 132 and 33 KV switchyard at 132/33 KV SS Durshed, OMC circle,Karimnagar
Procurement of Honey Well make Electrical safety items for use at various Area work shops, 132 Sub-stations and mines of SCCL on Rate Contract basis for a period of two years
Providing Operation of Electro Mechanical Services and Maintenance of Sub Station Engine Alternator sets in Data Center OU Campus Hyderabad For the Year 2021 22
Construction of Beeramguda section office in First floor of newly constructed 33/11 KV RC puram Sub-Station Control room in Patancheru Division, Sangareddy Circle
Construction of Compound wall to newly proposed 33/11KV Outdoor Sub-Station at Cheeryal (V), Keesara (M), Keesara Division, Habsiguda Circle. (Reserved for SC Category)
Design, engineering, manufacturing, testing before dispatch, loading, supply for destination including transportation, civil & construction works, erection, testing and commissioning on turnkey basis: (i)Dismantling of existing 1No. 315MVA ICT at ... Veltoor Sub -station ... Sub- station and ... Gajwel Sub -station ... Sub- station and ...
Raising of cable duct, cleaning switch yard, providing shabad stone at 132KV Bollaram, IDPL, Gachibowli and Medchal feeder bays at 220KV SS Shapurnagar- Invited under earmarked works for SC's/ST's/Waddera/Sagara (Uppara) Socities are only eligible to participate.
NSHES - O&M - CSD-I - Maintenance of lawns and plants in switch yard & TRC, sweeping & removal of debris from dust bins in all floors at Main Power House for the period from 01-04-2022 to 31-03-2023
NSHES - O&M - CSD-I - Maintenance of lawns and plants in switch yard & TRC, sweeping & removal of debris from dust bins in all floors at Main Power House for the period from 01-04-2021 to 31-03-2022
Removing/shifting, dismantling/rerouting of 33kV and below OHT lines, shifting of 01 substation with 2Nos 7.5 MVA, 11/33kV oil cooled transformers from 18MW power plant (RG-1 area) and its connected switchgear & accessories and shifting of 04Nos ... 04Nos substations each ... proposed substation locations ...
PROCUREMENT OF PRIMARY INJECTION KIT FOR 132KV SUBSTATION RG3 AREA.
Shifting of quarry east substation at KOC Project, Yellandu area.
PROCUREMENT OF LIGHTENING ARRESTOR FOR 132KV SUBSTATION OF MM AREA.
PROCUREMENT OF LED LIGHT FITTINGS FOR 132KW SUBSTATION OF RG3
Laying of Pipe drain at Kokapet Substation in Narsingi Municipality
Painting of structures and marshalling boxes at 132KV Kamareddy substation.
PROCUREMENT OF BATTERY CHARGER FOR 132KV SUBSTATION OF MM AREA.
Construction of RCC Cable Trench @ 132/33kV Substation, Chanchalguda, Hyderabad
Outsourcing of maintenance of EOT cranes, machineries and substations (Electrical Portion) at CWS/LGD for the period of 3 years.
Supply of Surge counters of range(0-10ma and 0-5ma)utilization in Various EHT Substations in OMC Circle,Khammam.
Maintenance and repair works to Area workshop and substations at 8incline colony, RG II area, Godavarikhani, Dist Peddapalli, Telangana State
Integration of new 108 No.s breakers to SCADA control center in various 33/11kV substations of RR-IISCADA Sub division
CONSTRUCTION OF 33 KV / 3.3 KV OUTDOOR AND INDOOR SUBSTATIONS NEAR TO QUARRY AT KTK OC-III PROJECT BHUPALPALLI AREA
Erection Testing and Commission of 1 Nos. 33/11KV Sub stations Indoor with connected 33KV and 11KV lines at Girls High School Hanumakonda in Hanumakonda Division Circle of TGNPDCL on partial turnkey basis.
Preventive Maintanance of 500 KVA Outdoor Type Transformer Substation and Other allied works at the GPO Hyderabad
supply and spreading of 20mm HBG metal in the switch yard,providing water supply arrangements to earth pits,providing cover slabs over cable trench and construction of stacking platform at 220/132/33KV Wanaparthy SS in Wanaparthy District Mahabubnagar Circle
Maintenance of Plants, Lawns and Gardens of the areas around the control room, guest house, maintenance building, residential quarters and switch yard area at 400 KV SS Mamidipally for the period from 01.05.2021 to 31.03.2022(or as per actual requirement).
KTPS-VII Stage - Civil - O&M-I - SD-I - Clearance of jungle in the main plant area from gate complex to silos including switch yard area in Stage-VII, KTPS as and when required during the financial year 2024-25
Erection of 33KV inter linking Line from 132/33KV Ramannapeta EHT substation to 33/11KV Aroor substation in Ramannapet Subdivision in Chotuppal Division of Yadadri Circle
INSTALLATION OF 33 KV OUTDOOR SUBSTATION AND EXTENSION OF 2 SEAM COAL YARD INDOOR SUBSTATION AT KHAIRAGURA OCP IN BELLAMPALLI AREA, KUMRAMBHEEM ASIFABAD DISTRICT, TELANGANA STATE.
Supply, Installation, Testing and Commissioning of 11kV, 630kVA Compact Sub-Station (CSS) with CRT DRY Type Transformer for TiHAN complex expansion, IIT Hyderabad campus, Kandi, Sangareddy.
33kv Substation bay
Supply of Lightning/Surge Arrester 3rd harmonic resistive leakage current measurement kit utilized at switchyard subdivision of Stage-I/BTPS
Procurement of PT-100 RTD used for generator transformer and station transformer in 400KV switchyard at STPP, Jaipur, Mancherial, Telangana.
NSHES - Supply of Auxiliary contactors and LT Switch gear used for Generator Transformers, 220KV switchyard SF-6 Gas circuit breaker and Penstock intake gate control circuits at 220KV switchyard of NSPH and certain spares like 220V DC auxiliary relay, ML10 spare kits for NSLCPH, Nagarjuna Sagar.
Erection of 11KV line, LT line, DTR and laying of LT UG cable for Sub-Station-III for extension of supply to EE,Housing Division-5, GHMC located at Sy.No. 203P in Kollur-II, 2BHK site under Double Bed room scheme of Teleangana Government by providing of 11KV and LT lines to release Domestic and Non Domestic loads under Capital works in Kollur Village, RC Puram Mandal in Patancheru Division of Sangareddy Circle.
POWER EVACUATION FACILITATES FROM UPCOMING EHT SUB-STATION (132/33KV) GANDI MAISAMMA, ERECTION OF 5NOS FOLLOWING 33KV FEEDERS (I)DP PALLY SS-II, (II)BAHADURPALLY, (III)AFA-I, (IV)AFA-II & (V)SATYAM-1 FEEDERS USING 100SQ.MM AAA CONDUCTOR OVER M+ TYPE TOWERS(DISTANCE OF 4.1CKM) AND 33KV 3X400SQ.MM XLPE UG CABLE(FOR DISTANCE OF 0.4CKM (6RUNS)) PERTAINS TO OPERATION MEDCHAL CIRCLE IN MASTER PLAN SD-1 OF WCGH DIVISION IN RANGA REDDY CIRCLE
Design, Supply, Installation, Testing, commissioning with Remote Monitoring System with Comprehensive Warranty, guarantee for 5 Years and Operation and Maintenance of the Complete Plant for 5 Years from Commissioning Date for the Grid Connected, ... 33/11KV Sub -station ... Sub- station at ...
Supply, delivery, erection, testing and commissioning of 150 HP 1480 RPM Horizontal squirrel cage pump sets, along with starter control panel, cables, MS specials, valves etc., in place of existing 100 HP out dated pump sets and repairing, ... in sub -station ... sub- station at ...
Bifurcation of overloaded 33KV Jaknalapally feeder emanating from 132/33KV Kalwakurthy EHT SS by erection of 11KM of 33KV SCOH interlinking line to 33KV Talakondapally feeder emanating from 132/33KV Amangal EHT SS i.e., from Talakondapally X-road & ... Gattuppalapally Sub -Station ... Sub- Station duly ...
Bifurcation of overloaded 11KV Falaknuma UG cable feeder emanating from 33/11KV Falaknuma SS by erection of new 11KV feeder from the same SS by laying of 1.6KM of 11KV 3X185Sq.mm. XLPE UG Cable along with bay extension and erection of 11KV VCB at ... Falaknuma Sub Station in ...
Estimate proposal for bifurcation of load of 11KV Chinna Golconda INDSL feeder emanating from 33KV 11KV Chinna Golconda Sub Station by erection of 2.32KM new 11KV Line from the same SS which includes stringing of 2.32KM line with 55 Sq. mm AAA Conducto duly tagging to the existig 11KV Chinna Golconda INDSL feeder along with erection of new 11KV feeder VCB in Shamshabad section of Shamshabad Sub-Division of Rajendranagar Division of Rajendranagar Circle
Erection of 2 Nos. 33/11KV Sub-Stations with connected 33KV and 11KV lines at Jaggannapet and Lingala in Mulugu Division of Bhupalpally Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 2 Nos. 33/11KV Sub-Stations with connected 33KV and 11KV lines at Wadlakonda and Kurchapally in Jangaon Division of Jangaon Circle under T and D/ SI Scheme on partial turnkey basis.
Maintenance and Repair works such as providing chain link mesh fencing, MS Gates, Metal filling, Curb wall and Painting works to 5 No.s of 33/3.3 KV sub-stations at Ramakrishnapur township, Mandamarri area.
Additions and alterations to the existing sub stations for increasing power supply to give power to the AC connections of 882 nos.MD type qtrs at 8 incline colony,Bhupalpalli, Jayashankar Bhupalpalli-Dist Telangana State.
Construction of sump and fire hydrant system at 220 KV and 132 KV Sub stations in Khammam circle ( 220 KV SS Budidampadu, 220 KV SS Seetharampatnam and 132 KV SS Khammam) in Warangal Zone
Erection of 2 nos. 33/11 KV substations Nandigama and Damaravancha in Narsampet division of Warangal Circle on partial turnkey basis
Erection of 2 nos. 33/11 KV substations Vemulakurthy and Bandalingapur in Jagityal division of Karimnagar Circle on partial turnkey basis