Loading…
Loading…
7,402 results • Best match
Construction of Cable Trench pathway with spreading black stone at switch yard area Laying chequered tiles at control room building and repairing of existing broken Boundary wall at Jibantala 33/11 kv S/Stn under Canning Division
Drawal of 01 Nos. of 11 KV 3X400 Sq. mm. XLPE cable one from NT IC 33/11 KV S/S with supply of Jointing kits and other allied works for effecting 11 KV Construction Power Bulk power supply i.r.o Rivera One Victoria at AA-IC , Newtown Division
Repair and replacement of defective Relays of HT outgoing Breakers of different Substations under Medical College Hospital Kolkata
Annual repair and maintenance or small construction works at any of the sub-stations and Office premises under BNDD-I for Two Years i.e. 1st April, 2023 to 31st March, 2025.
Annual repair and maintenance or small construction works at any of the sub-stations and Office premises under Bhangar Division for Two Years i.e. 1st April, 2023 to 31st March, 2025.
Annual repair and maintenance or small construction works at any of the sub-stations and Office premises under Newtown Division for Two Years i.e. 1st April, 2023 to 31st March, 2025.
MANNING AND OPERATION OF LIFTS AND E/M SUB STATIONS AT P-128 (JAMUNA BLDG), N-23 (TEESTA BLDG), INS NETAJI SUBHAS COMPLEX AND DAMODAR COMPLEX UNDER GE (I) (CGP) KOLKATA
Emergency Construction of protection wall near Dovan office towards Switchyard under Rammam Hydel Project St _II Darjeeling
Industrial Ethernet Switch 8, 16 port for Control n Protection panels of 400/220/33KV Switchyard CR
Laying and dressing of 33KV 3x400 SQ MM XLPE cable of 33KV Minakhan Sarberia LILO circuit and laying and dressing of 11KV 3Cx185 SQMM XLPE cable of 11KV Minakhan feeder emanating from 33 11KV Minakhan substation under Bhangar Division WBSEDCL
Comprehensive maintenance, both preventive & breakdown for (i) 03 (three) numbers 33KV/415V Electrical Substations and (ii) General Electrical equipments of whole factory including Bogie shop & 05 (five) nos. of quarters blocks, Type-II & Type-III quarters and transit accommodation for officers with replacement of defective items as and when required at DLW of CLW, Dankuni for 2 (two) years.
Supply, installation, testing and commissioning of 2 into 500KVA rating 11 by 0.433KV supply substation for PLB HDPE Duct production unit and other Electrical Load at Telecom Factory KHARAGPUR. SITC of 1 into 500KVA Transformer in 1st Phase
ARC FOR BREAKDOWN AND PREVENTIVE MAINTENANCE WORK OF 132 KV DTPS-BURDWAN D/C TRANSMISSION LINE - 75, 76 (FROM LOC-86 TO LOC 264 AND UPTO WAVETRAP AT BURDWAN Ss) AND 33 KV FEEDERS LINES UNDER BURDWAN SUBSTATION
Day to Day operation, emergent repair maintenance of 11KV/415V, 3phase, 2X500 KVA Indoor Substation including 11KV VCB, 2X500 KVA Transformer of Salua PTS under Paschim Medinipur District from 01-07-2024 to 31-03-2025. (1st Call)
Transportation of 02 Nos. 6.6KV Grade, 3-Core PVCDWA cable, each 1000M length from surface and laying, hanging from 1L substation to 770M inside of -1L of Longwall Panel-6 at RVI Seam underground of MIC, Jhanjra Area.
Day to Day Emergent Repair and maintenance of Substation, HT Overhead, HT and LT Panel, LT Cables at PTS Salua in the district of Paschim Medinipur for a period of 365 days From 01.04.2021 to 31.03.2022. (1st Call)
Replacement of damaged and faulty cable lowered through borehole to feed power in RIV, RIII/II and RV seam and shifting of 3 MVA, 6.6 kV/550 V power substation in RVI of Khottadih Colliery under Pandaveswar Area.
Laying of 3C X 185 sq mm XLPE UG cable by microtunneling method with other allied works i r o new 11 KV line from Mothabari 33/11 KV substation to Pataldanga under Malda Division WBSEDCL 2nd call
installation and commissioning of 3Phase , 4 wire 550 Volt overhead line from 11KV 550 V substation at pit no 6 to Electric winder for pit no 6 of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.
REPAIRING and OVERHAULING OF 11KV, 400AMPS, VCB PANEL AT DARULA SURFACE SUBSTATION, 550VOLT 200AMPS ANDREW YULE MAKE ACB and COMPLETE REPAIRING and OVERHAULING OF 100HP,550VOLT PRABHU MAKE STAR DELTA STARTER AT SOUTH SAMLA UNIT OF MSAM COLLIERY
Strengthening and widening of Road from Manbazar main Substation Road to Bus stand with Paver Block under Manbazar G.P Activity code 44768795 within Manbazar I Block under 15th CFC Fund for 2020-21 in the District of Purulia
Day to Day operation and maintenance of Pump Motor Set, routine maintenance and repairing of E.I maintenance Work of 11 KV substation at Forensic Science Laboratory,Belgachia, Kolkata for 12 months (366days) from 01.04.2023 to 31.03.2024.(1st Call)
Laying of 11KV 3Cx300sq.mm. XLPE Cable (R.L. 5.88 Km) from Gobardannga Substation to the premises of The Executive Engineer, Eastern Mechanical Division, PHE Dte. Basirhat-II at Charghat for bulk power supply at 11 KV under Habra Division.
Day to Day operation of Pump Motor Set, Operation, Emergent repair, maintenance of 11KV/415V, 3phase, 630KVA Indoor Substation including 11KV VCB etc for SIRB Campus at Rajnagar, Birbhum for (220 days) W.E.F 26.08.2023 to 31.03.2024. (2nd Call)
Repair and Renovation of CISF Control Room, Toilets, DG Shed and Boundary Wall of 25 MVA Substation under Sonepur Bazari Area, including Cleaning of Wild Vegetation at various CISF Duty Posts of SBA(Detail name mentioned in NIT)
2nd Call for Installation of 33 KV and 11 KV electrical equipment with associated other electrical works for construction of new 33/11 KV Substation at Eternis Housing Project at Madhyamgram, District North 24 Parganas under Barasat Division.
Day to Day emergent repairing and maintenance of Substation, HT and LT Panel, LT Overhead, Street Light, Building roof top lights, Cables within EFR 1,Salua for a period of 365 days (From 01.04.2021 to 31.03.2022). (1st Call)
Construction of three nos room (one 11 Kv Transformer substation room, one pump switch room with three nos of starter, one primary and secondary controlling switch room) at Nakrakonda Kumardihi B OC project under Nakrakonda Kumardihi B Colliery.
Laying of 11kV (3x300) sqmm XLPE UG Cable from existing Banipur 33/11KV Substation to the premises of proposed Banipur Textile Park and installation of electrical equipments including DTR, RMU etc. with allied electrical works under Habra Division
200 SQM SUBSTATION BUILDING, 5 NOS 600 DIA MS MANIFOLD LINE AND 10 KG CAPACITY (1 W and 1SB) CHLRONIATION SYSTEM IN 8 NOS. EXISTING GLR AT ISMILE PUMP HOUSE UNDER AMRUT (PHASE III) WITHIN AMC.2nd Call
Day to Day Electrical Maintenance of 11KV/415V, 3 Phase, 2X300 KVA Indoor Substation Transformers including LT Panel, Over Head Line etc of EFR 1st and 3rd Battalion under Paschim Medinipur District for FY 2026-2027. (1st Call)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Hiring of 01 (one) number commercial MUV/MPV/SUV/COMPACT SUV (below 1500 cc for ICE vehicle) for official use of Belmuri substation, GOMD-I, DVC, Howrah for a period of 2 (two) years; N..
Construction of outgoing bay at Kawakhali 33/11kV Substation to connect with Utshodhara 33/11 kV substation under Siliguri Suburban Division, WBSEDCL
Supply and Laying of 300 sqmm HT armored aluminum Cable from SubStation II to Academy SubStation under Jurisdiction of NRSMCH Kolkata 700014
Augmentation of substation at ID BG Hospital Kolkata
Re routing of cables in an masonary trench for feeding of NICU/PICU AND Group D feeder from new and old substation respectively inside the premises of North Bengal Medical College and Hospital, Dist-Darjeeling. Civil Work
Custom Bid for Services - Repair Transportation Unloading Erection and Commissioning of 1 No 150MVA BHEL make Auto Transformer SL No 2020277 of Barjora Substation under GOMD VI DVC Durgapur Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments
Providing Electrical installations for LICI rent out and shifting of BSNL office to staff quarters , Repairs and Servicing of Substation, SITC of submersible pump set at Ranaghat TE Building , District Nadia Under Cal BA.SH Wiring and SITC of PUMP
Day to Day operation and maintenance of Substation, HT and LT Panel, LT Cables, pump motor set along with electrical maintenance at Nimtouri Police Line in the district of Purba Medinipur (350 days) From 17.04.2023 to 31.03.2024. (1st Call)
Fabrication galvanizing testing supply delivery including fasteners at site for the work of 21 No of 132 KV CT structure for Ashokenagar 132 KV Substation, under Barasat Area Office and 220 KV equipment gantry truss structures for Jeerat 400
Day to day repair, preventive maintenance, operation by providing High,Semi and unskilled Manpower for Elect. installations i.e Substation, Lift, HVAC, DG, Fire Fighting round the clock at MCH Hub, Anupnagar,Dist. Murshidabad for the period of 1 year
Transportation, placement of VCBs, ACBs, Transformers and laying of Cables for setting up a substation at -38L in between 8R and 7R for Panel-25 heightening and widening by CM-1 at R-VI Seam of MIC, J.P. Colly
Day to day operation and maintenance work of Pump motor sets, routine maintenance/ repairing of E.I maintenance Work and 11 KV substation / 400 KVA DG set for Kamardanga KPTA campus under Kolkata Police W.E.F 25.06.2022 to 31.03.2023. (3rd Call)
Installation of one substation at -4KL between 34R and 35R for providing supply to Trunk Sub panel-A and Trunk sub panel-B for CM-1 section of R-VI seam at MIC, Jhanjra Project Colliery under Jhanjra Area
Setting up of separate electrical power line (6.6. KV) at U.G. of approx. length 1500 m. between 19 no. substation (RVI Seam) and 3D/12L (RVI Seam) for smooth pumping operation of sector - A at MIC , Jhanjra Project Colliery
Procurement of Oil Leakage Arresting Compound including application for 50 MVA EMCO Make Transformer-I of Durgapur substation, 80MVA BBL make Transformer - 1 and2, 100MVA EMCO make Transformer-3 and 35MVA NGEF Transformer of Barjora s/s, GOMD-VI
THREE YEARS AMC FOR CALIBRATION, MAINTENANCE AND FUNCTIONAL CHECKING OF GAS DETECTORS INSTALLED AT PART A DYIP,OHCU,DHDT,FOB,TPS AND LOB ANS PART B DHDS,GT,COOLING TOWER, SUBSTATION,OMS AND ETP AND MISC AT HALDIA REFINERY
Installation of 2- layer RBT,MS Grill of Boundary wall at the back side of New Building and EI, Substation ( N-E side) at Bidhannagar College, EB-2, Sector-I, Salt Lake,Kolkata-700064,during the year 2024-2025
Laying of 500Mtr 300sqmm XLPE cable is considered through Micro tunneling (260m) with 160mm dia PE-80 PN 6 HDPE Pipe at location Halisahar Choumatha more for new 11 KV feeder from Halisahar 33/11KV substation under Naihati Division
Laying of 33KV UG cable single line from Rishi Bankim 33/11 KV Substation and Basudevpur 33 kV Line T Off point at Malancha Roadcrossing to PHE Malancha along with 4P erection and Dog conductor stringing under Naihati Division