Loading…
Loading…
7,402 results • Best match
Repairing Of 11KV,400Amp, Biecco Lawry make OCB at Southsamla Unit, Rewinding and Repairing of 150 HP, 1440RPM, 550V Motor, Job related with Workshop nature of repairing, Installation of 600 Amp, 11KV OCB switch at Manderboni Colliery main substation
THREE YEARS AMC FOR CALIBRATION, MAINTENANCE AND FUNCTIONAL CHECKING OF GAS DETECTORS INSTALLED AT PART A DYIP,OHCU,DHDT,FOB,TPS AND LOB AND PART B DHDS,GT,COOLING TOWER, SUBSTATION,OMS AND ETP AND MISC OF HALDIA REFINERY
Day to day maintenance of pump motor set along with electrical maintenance of all types of including Operation and Maintenance of Electrical Substation, DG at Araksha Bhawan (232 days) from 12-08-2024 to 31-03-2025. (1st Call)
Day to Day operation and maintenance of Pump Motor Set, routine maintenance and repairing of E.I maintenance Work of 11 KV substation at Forensic Science Laboratory, Belgachia, Kolkata for 12 months (365 days) from 01.04.2024 to 31.03.2025.(1st Call)
Day To Day Operation Of Pump Motor Set and Operation, Emergent Repair, Maintenance Of 11KV/415V, 3 Phase, 630 KVA Indoor Substation Including 11 KV VCB etc For SIRB Campus At Rajnagar, Birbhum from 20.01.2023 to 31.03.2023. (2nd Call)
Round the clock Operation and Guarding of Pumping machinery, Substation (2 x 315 KVA, 11KV/0.433KV Transformers), Lighting arrangement with other allied works at INTAKE PUMPING STATION under Surface Water Based W/S Scheme for Arsenic affected area, N
Rectification and restoration of major electric power fault and replacement of main power cable from main substation LT panel to back side of Caretaker room Sub - Distribution panel (for MPCM Hall, Main Director Bldg ....in the GPO complex, Kolkata)
Power reorganization with installation of 01 no 400 Amps 11 KV Breaker for primary controlling switch of Transformer and replacement of existing 100 KVA 440 v outdoor type Transformer of Mohanpur Colony substation with 100 KVA indoor type Transforme
MOEI 7 Fans i/c. Substation Equipments at Resdl Building in Nizam Palace, Kolkata-20 During 2022-23. (s.H.:- Renovation of Type-IV D-7 with IEI and LED Fittings etc. and Fresh Air Fans Fittings at C.G. Hostel.)
MOEI & fans i/c Substation, Lift Operation & maintenance of Fire Alarm & Fire fighting system etc. in GSI Building at 27, J.L.N. Road & Kyd Street, Kolkata-16, 2025-26. (SH- Repair of 6 passenger Lift at GSI Kyd Street, Kolkata.).
Construction of foundation for 5 nos. 220 KV D/C and M/C Transmission Towers i.r.o. Construction of S/C LILO of New Town AA-III- Subhasgram 220 KV D/C Transmission Line at KLC Bantala 220 KV Substation.
2nd call for Laying of 01 nos 33 KV grade 3 X 400 sq mm XLPE U.G. Cable (R/L-5.530 km) from Basirhat 132/33 KV Substation to Basirhat (D) Division office under Basirhat (D) Division under IPDS
Day to Day Electrical Maintenance of 11KV/415V, 3phase, 2X500 KVA Indoor Substation Transformers including LT Panel etc of all residential and non residential office buildings of PTS Salua under Paschim Medinipur District for FY 2026-2027. (1st Call)
LAYING OF 11KV 3CX300 SQMM XLPE UG CABLE BY MICRO TUNNELING METHOD WITH 6 INCH HDPE PIPE FOR ROAD CROSSING AND ASSOCIATED CABLE WORKS FOR BIFURCATION OF HANUMAN COMPLEX FEEDER AT ISLAMPUR 33/11 KV SUBSTATION UNDER ULUBERIA DIVISION
Supply and delivery of Hardware fittings of transmission line at Midnapore 220 KV SubStations under Midnapore Area Office WBSETCL
CONSTRUCTION OF CABLE TRENCHE (200 M ) FROM SUBSTATION 1 TO SUBSTATION 2 (NEW LOCATION) AT THE PREMESSES OF 55 MGD WTP AT UTTARPARA
Construction of new substation building and supply, installation, testing and commissioning of 6kV, 1000KVA Electrical Indoor Substation equipment at Subhash Bhaban, SMP, Kolkata
Operation of 132kv 33kv 11 kV Substation Maintenance of 33 kV 11 kV Substation equipment and 2 nos 750 kVA Diesel Generating set
Construction of cover shed along with renovation of existing staircase from Powerhouse to switchyard under R.H.P.,St-II
Construction of A Type School Building (G plus 2), 04 Nos. Type-II Quarters. (G plus 1), 04 Nos. Type-III Quarters. (G plus 1), 01 No. Type-V Quarter, Canteen, Electrical substation, Underground Sump, Boundary walls along with Gates & Guard Room ... Electrical Substation , ...
Day to day bi-annual tit bit civil maintenance, addition alteration with minor civil constructions, water proofing, sanitary plumbing works etc. of office buildings, establishments and sub stations under Siliguri Town Division, WBSEDCL
Annual Maintenance of the Electrical Installations of both non-residential and residential buildings and Sub-stations for Main Building and Annex Building in the premises of Honble High Court, Calcutta (Round the clock).
Day to Day operation of pump- motor set and Emergent Repair and maintenance of Substation, HT Overhead, HT and LT Panel for all Police Training Centre at PTS Salua in the district of Paschim Medinipur (From 17.04.2023 to 31.03.2024). (1st Call)
Providing security personnel for round the clock guarding of Academic Building G 11 Storied Hostel Building G3 Storied Gr C and Gr D Building G3 Storied including 4Four Nos of gates in front side SubStation and AC plant room area
Erection of 33 kV bay and allied works for Barrackpore S/Stn, four pole at Titagarh 132/33KV Substation and proposed MES S/stn at Barrackpore controlling proposed 33KV feeder bay towards effecting 33KV Bulk power supply of the Garrison Engineer
Providing additional cable drawn between PDB at Substation and PDB at Intake Pumping station of Intake Point of Surface Water based water supply scheme for Arsenic Affected areas of Habra Gaighata and adjoining Mouzas in the District of North 24 Parg
Drawing/Upgradation of 415 V, 3 Ph, 6 Wire, over head line from Rajib Chak to Gourok pur Camp and supply and installation of upgraded version (chemical) earth pit at Barmondia Electrical substation and pumping house of Barmondia Colliery , Salanpur
Installation (transportation and laying ) of two types of 6.6 kV power cable feeders (6.6KV, 70 sqmm PVCDWA CABLE and 6.6 KV, 150 sqmm PVCDWA) from 11L SUBSTATION inside 23L ( for a length of 1700 m) at Longwall panel-13, MIC, JPC
PARTA Construction of inspection road alongwith side drain at back side of the WTP PhaseI and other areas with ancilary works under New Town Kolkata Water Supply DivnI PHE Dte And PARTB Scraping and Painting Roof treatment etc of SubStation Pha
A.Miscellaneous electrical maintenance job in respect of electrical equipment B. maintenance job of 415V 3Phase 1 Neutral 1 Earth LT AB Cable with break down maintenance job at project Incline C. Wiring of project incline 11 3.3 KV substation ,lumina
construction of platform for setting of new substation TSU and primary HT switch and secondary LT switch at 12L 0D to 1 wc D at no 6 pit in R V seam of Lower kenda colliery under Kenda Area ECL
Day to Day operation and maintenance of Pump Motor Set, routine maintenance/ repairing of E.I Work, operation and maintenance of 400 KV/ 11 KV substation on requirement at Bidhannagar East PS for 365 days From 01.04.2021 to 31.03.2022. (1st Call)
Drawal of 02 nos 11KV XLPE cable with supply of 11KV jointing kit from NT-AA-IIIE 33/11KV Substation for making feeder bifurcation arrangement with Akandakeshri and Sanjeeva Town Feeder from NT AA IIID 220KV GSS under Newtown Division
Day to Day emergent repairing and maintenance of Substation, HT and LT Panel, LT Overhead, Street Light, Building roof top lights, Cables within EFR 2 and 3,Salua for a period of 365 days (From 01.04.2021 to 31.03.2022). (1st Call)
A) Replacement of 2MVA transformer to 3 MVA transformer at langri more substation and installation of 200 mtrs head. (B) Installation of 200 mntrs head ,1480 RPM floW more make pump and Motor-set with bed plate on the pontoon
Diversion/relocation of existing 400 KV PPSP-Durgapur D/C Transmission Line in between Tower No. TL. 426 and 430 (RL -1.0 KM) under jurisdiction of Asansol 220 KV Substation for construction of Flyover by Eastern Railway for proposed Andal-Sainthia
Laying of 33 KV 3Cx400sq.mm. XLPE UG Cable (R.L. 1.5 Km) by tapping and extension from Chord Road Substation to the premises of The Executive Engineer, PHE Dte. at Mouza Authpur for bulk power supply at 33 KV under Naihati Division.
Day to day operation and maintenance work of Pump motor sets, routine maintenance/ repairing of E.I maintenance Work and 11 KV substation/400 KVA DG set for Kamardanga under Kolkata Police for 6 months from 01.11.2021 to 31.03.2022. (2nd Call)
Day to Day operation and maintenance of Pump Motor Set, routine maintenance and repairing of E.I Work, operation and maintenance of 400 KV/11KV substation on requirement at Bidhannagar East PS, Lake Town PS (From 16.05.2022 to 31.03.2023). (2nd Call)
MOEI and fans i/c Compound Light RMO motor Pump set, DG Set Lifts Substation equipments Wet Riser Fire alarm at CISF Complex EM Bye pass Kasba Kolkata during 2025-26(SH: SITC of Sub monoblock pump and allied electrical works)
Additional work of Soil investigation and construction of CWR cum Pump House with M.S Structural work, Substation, Chlorin Room etc, Land development of H/W Site,drain and internal Path Way, Concrete Road and Bituminous Road Restoration, Laying of M.
Installation of HT Pump at 23L, Replacement of Jamtala domestic pump with repaired one, Reorganization of power cable from panel 17 to reorganize the face, cleaning of different earth pit at surface substation and other miscellaneous ENM jobs at JUG
Day to Day operation, emergent repair maintenance of 11KV/415V, 3phase, 2X500 KVA Indoor Substation of all residential and non residential buildings of Jhargram Police Line under Jhargram District (224 days) form 20-08-2025 to 31-03-2026. (1st Call)
Cleaning sludge and garbage from surface drain and bush cutting around Pit premises,BC incline and substation etc. and Widening and deepening of jore near Kamalpur Mouza, beside OC patch and Bharatchak Mouza for Monsoon Preparation for FY 25-26 of
Installation and Commissioning of 11KV Double Pole(DP) structure for operation of 1 mo. CT. 25A SA and P.T. 11KV 110Volt for energy meter feeding power to MDO project works (JMS) from Old Shyamsundarpur unit 11KV Substation of Tilaboni Colliery.
Custom Bid for Services - INTEGRATED AMC ARC FOR 365 DAYS OF 220 KV PARULIA BURDWAN LINE 257 258 FROM LOC PB 71 TO PB 279 LILO PB LINE 258 56 LOCATIONS UPTO WAVETRAP AT BURDWAN PANAGARH UNDER BURDWAN SUBSTATION GOMD I
1. Erection and construction of illumination circuit 2. 550V overhead line erection at CLJ OCP 3. Renovation and extension of 3.3KV overhead line 4. Cleaning of 5 nos electrical substation 5. Supply and fitting of 60 nos of street light
Annual maintenance and operation of IEI & fans, water pump set splilt AC, package type AC system, substation at existing building of STQC Directorate, ERTL, Kolkata during 2024-25 (SH: Servicing of 11 KV 630 amp V.CB. & SITC of Power Pack).
MOEI and Fans including Compound Light , RMO Motor Pump set, DG Set, Lifts Substation equipments, Wet Riser, Fire alarm at CISF Complex EM Bye pass Kasba Kolkata during 2025-26(SH: Comprehnsive maintenance of AC machine installed at CISF HQ Kasba)
MOEI & fans i/c Substation, Lift Operation & maintenance of Fire Alarm & Fire fighting system etc. in GSI Building at 27, J.L.N. Road & Kyd Street, Kolkata-16, 2025-26. (SH- Comprehensive maintenance of 03 nos. KONE Lifts for the year 2025-26).