Construction of HT Switch Room of size 4.75 m X 4.50 m and compact Sub-station at 2B campus of Indian Association for the Cultivation of Science (IACS), 2A & 2B, Raja Subodh Chaandra Mullick Road, Jadavpur, Kolkata-32.
MOEI & Fans i/c sub-station, Lift, Operation and maintenance of Fire Alarm and Fire Fighting system in GSI Building at 27 & 29 JLN Road & 15 Kyd Street.(SH: Electrical work at 29 JLN Road GSI Building, Kolkata.)
The Work for shifting of existing 11KV Kalupur feeder of Bongaon 33 11 KV Sub Station by micro tunneling of 195 Mtr. HTUG line at loacation Asaan Nagar Kalupur to facilitate ONGC under the jurisdiction of Bongaon Division.
Execution of 33 KV cable replacement works from PJIC to 400 mm2 XLPE cable iro M III Feeder 1 from Salt Lake 132 KV Sub Station and M III/M V interconnection under IPDS under Bidhannagar I Division
Augmentation of capacity for Barrackpore, Sajirhat and Dangapara 33/11 kV Sub-Station with erection of 33 kV and 11 kV Electrical equipments, structures and associated other Electrical and Civil works under North 24 Pgs Region in IPDS
Construction of control room building and sinking of one no tube well (100mm X 50mm) dia including submersible pump motor (1HP) set at Khardah 33/11KV sub-station under Barrackpore Division, 24 Pgs(N), WBSEDCL under IPDS Scheme
Laying of 01 no of 3-Core 33 KV Grade 400 sq.mm XLPE UG Cable from Nilganj more to Anantapur 33/11 KV Sub-Station for a route length - 4.895 Km under North 24 Parganas Region under IPDS
Laying of 1 nos x 400sq.mm 3 core XLPE 33 KV UG Cable Over a R/L- 3.425 KM from Bisherpara Bankra More to Ganganagar 33/11 KV Sub-Station under under North 24 Parganas Region under IPDS
Erection of 33 kV and 11 kV Electrical equipment with Civil foundation and associated other Electrical/Civil works in different 33/11 kV Sub- Station under North 24 Pgs Region for implementation of SCADA under RAPDRP Part-B
CONSTRUCTION OF EARTHMAT FOR UNDER-CONSTRUCTING 33/11KV SUB STATION AT KISMAT-NARAJOLE UNDER DDUGJY SCHEME IN THE DISTRICT OF PASCHIM MIDNAPORE
Replacement of Fire hydrant line in 220 KV switch Yard and TP - 6 of CHP area at KTPS
Area development with PCC including RCC approach road in 400KV switch yard at DSTPS,DVC,Andal (Phase-II)
Service Contract for Switch yard Overhead Conductor fitness and tightness checking for a period of 2 years,BKTPP
UG Cable work for the erection of 33 KV incoming feeder lines for the new 33/11 KV Sujali Sub-station under Islampur Division, WBSEDCL
UG Cable work for the erection of 33 KV incoming feeder lines for the new 33/11 KV Kunor Sub-station under Raiganj Division, WBSEDCL
Extension of switchyard, construction of boundary wall and switchyard fencing, painting of boundary wall and switchyard fencing, construction of 01 no. of CT and 01 no. of VCB foundation plinth, Supplying and spreading of gravel
Construction of Switchyard fencing, cable trench, switchyard development, part of boundary wall, R.C.C. road etc. at proposed Panchthupi 33/11 K.V. Sub- Station undre Kandi (D) Division, within Murshidabad Region, WBSEDCL
Construction of collapsed Boundary wall Heightening of Existing Boundary wall adjacent to Switchyard Construction of Switchyard Fencing and Pathway reconstruction of damaged Cable trench alongwith Cover slab and other allied civil works within the
Construction of Pathway, Repairing of Soling PCC over the Switchyard area , Repairing of rainwater pipe, Removal of Rubbish and Gravels respreading at Damanpur Substation under Alipurduar Division.
Drawal of one no 33 KV UG Cable Circuit RL of 4.750 km by laying of 33KV 3 core 400 sq mm XLPE Cable from New Town AA IIC 220 132 33KV GSS to Siddha Pyne 33 11KV Sub-Station at Bidhannagar II Division under Bidhannagar Region WBSEDCL
R.M.O. 1600 KVA Electrical Substation equipments of Bhasha Bhawan, 2 Nos. 1000 KVA and 1 No. 500 KVA Electrical Substation, 8 Nos. Dumb Waiters in Two banks (comprising 4 Nos. each bank), 2 Nos. 10 passengers, 2 Nos. 8 passengers & 1 No. 13 ... of sub -station ... sub- station equipments ...
R.M.O. 1600 KVA Electrical Substation equipments of Bhasha Bhawan, 2 Nos. 1000 KVA and 1 No. 500 KVA Electrical Substation, 8 Nos. Dumb Waiters in two Banks (Comprising 4 Nos. each bank), 2 Nos. 10 passengers, 2 Nos. 8 Passengers & 1 No. 13 ... of sub -station ... sub- station equipments ...
Shifting of stacked earth from Basirhat 132KV sub-station to Ashokenagar 132KV sub-station for filling low land on urgent basis , WBSETCL.
Augmentation of Sub-Station capacity from (3X10) MVA to (4X10) MVA at Alampur 33/11 kV Sub-Station under Howrah-1 Division
SPECIAL REPAIR /REPLACEMENT OF HT CABLE VIKRAM ENCLAVE SUB STATION TO KOPT SUB STATION-5 AT HALDIA UNDER GE (I) (CGP) KOLKATA
Miscellaneous electrical items for switchyard
Renovation of Kumargram 33 11 KV Substation under Alipurduar Division.(2nd Call)
Refereed to NIT
PTR Augmentation work at Gopalnagar 33 by 11KV substation with other allied works under Tamluk Division.
Repair and maintenance and painting of 4 no different Switching Distribution Sub-Stations at Sector-V and construction of boundary wall at Sub-Station No.4 under BNDD-I
Thorough Repair and Maintenance work (civil work) of control room Building and switchyard area Newtown CBD 33 11 kv sub-station under Newtown Division.
Renovation of switchyard and modification of Spare room along with installation of vitrified tiles at 1st floor of Kalimpong 66 KV Sub-Station, WBSETCL
Reconstruction of R.C.C Earth Retaining Structure for protection of 2.50m height Switchyard Boundary Wall at Tarakeswar 132 KV Sub Station under Arambag Area Office
Through repair and maintenance work (Civil Works) of Control Room Building and switchyard area at Rajarhat33/11 KV Sub-Station under Bidhannagar Division-II.
Re development of switchyard area and repair of Control Room Building and Boundary wall of Jeliakhali 33/11 KV sub-station under Bhangar Division.
Switchyard development, construction of pathway, operational slabs and other allied civil works at Nanoor 33/11 KV Sub-Station in the district of Birbhum
Supply and Delivery of 100 Nos. 400W LED Flood Lights in complete with all accessories (as per spec) at Durgapur 220KV Sub-Station under Durgapur 400KV Area Office, WBSETCL
Construction of Boundary Wall, Switch yard development, RCC road, fencing, dismantling of damaged boundary wall and maintenance of control room building etc at Jamalpur 33/11 KV substation under Memari (D) Division.
UG Cable work for the erection of 33 KV incoming feeder lines for the new 33/11KV Bogram Sub-station under jurisdiction of Raiganj Division, WBSEDCL
Outcome and activity based outsourcing for day-to-day operation, maintenance and breakdown rectification of electrical power supply and various electrical assets / systems under Foreman Colony sub-station of Shop-35/KPA under the jurisdiction of Dy.CEE(G)/KPA.
Annual maintenance of building works for Academic Building Hostel Building Gr C and D Quarters Sub Station four nos gates etc including entire campus of West Bengal Judicial Academy New Town Kolkata 700160 under Bidhannagar East Division during the
Design Manufacturing Supply Delivery and Erection of High Mast Type Lightning Cum Lighting Mast 25 Meter with Foundation and Fitting and Installation of Surge Arrester at new spread out type Panchmura 33KV Sub Station under SEEDN Scheme under Bankura
Round the clock Operation, maintenance Guarding of 33/6.9/0.433 KV Sub-station other electrical accessories at Water Treatment plant under Surface water-based W/s Scheme for Arsenic Affected areas of Habra- Gaighata adjoining Mouzas, Dist- 24Pgs(N
Construction of Out-going Cable Trench, Roll-Out, R.C.C. Approach Road, Security Ghoomty, Surface Drain and other allied civil works within the premises of Laskarhat 33/11 KV Sub-Station under Balurghat Division in the Dist. of Dakshin Dinajpur.
Operation, and Guarding of pumping machineries and Sub-Station Equipments at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora, Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped w/sScheme BRGF PH-I
Round the Clock Operation and Guarding of Sub-Station (11 KV/0.415 KV, 2 x 500 KVA), Pumping Machineries, Electrical Accessories, Illumination Arrangement and Allied Works at INTAKE PUMPING STATION under Surface Water Based Water Supply Scheme for Ar
Day to day operation and maintenance of EI, Sub-station, AC System and whole compound lighting etc. at the VYBK, Salt Lake, Kolkata---Repair and reprograming of the existing facade lighting arrangement including allied E.I works at Practice Ground.
Laying of 2500 m of 3x185sq mm 11KV XLPE Cable by Micro Tunnelling and Open Cut with others allied works for Bifurcation of Ranaghat 3 11KV feeder from Ranaghat 1323311 KV Sub Station under Ranaghat Division of Nadia Region
Construction of 07 nos. of Cable supporting structures and laying of 33 KV Cable for connection and charging of 33 KV Feeders to newly constructed bay at Newtown AA-ID 132/33/11 KV sub-station under Newtown Division
Construction of new 33 KV PTR Bay for installation of one new 6.3 MVA PTR along with installation of one set CT and VCB in existing bay and other allied works at Kharipukuria Sub-station under Contai Division WBSEDCL