Loading…
Loading…
2,356 results • Best match
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Comprehensive Development to roads, drains, Culverts and Asphalting to roads at YMC Public School, Chikkanna Layout, Muslim colony 4th cross, D.J.Halli old police station / Munibyrappa layout, Shivraj road, Shahadaab Nagara Cross roads, Coffee Board Colony, S R Block, Vishveshwaraiah layout main and cross road, Hanumanthappa Layout, cross roads, Cavery nagar 3rd, 4th 6th main and cross roads, Munimarappa garden, Cross roads and surrounding areas in ward no 70 Kushalanagar, 71 Muneshwarnagar, 69 K B Sandra (Govt Sl No 47,50,52,56,57,58,59,60,62,63,64,67) (Package No 1)
Tanks for NDT Assembly and Overhaul
Magnaflux make NDT Penetrant Testing consumables
Providing consultancy services as 3rd Party (Third Party) inspection of development, maintenance works and services works under Zilla Panchayath Funds and Taluka Panchayath Funds for the year 2025-26, 5054 HOA works (ongoing and fresh) of 2023-24, 2024-25, 2025-26 of Koppal district.
Providing Consultancy Services as 3rd Party (Third Party) Inspection and Monitoring Quality for the Year 2024-25 & 2025-26 Procurement of Works Tender allotted to PRED Kalaburagi under 5054 Flood Damage, 5054 SCP / TSP and 5054 Special Grant in Chittapur Constituency Total 123 Works
Custom Bid for Services - 1038545 Settlement and verticality survey in RC as per Scope of work and BoQ for 24 Months including GST to be quoted in GeM, Custom Bid for Services - 1050527 Settlement and verticality survey in AC as per Scope of work and ... of Third -Party ... Third- Party Inspection Agency Hiring ... of Third -Party ... Third- Party Inspection Agency
Procurement of Lab equipments for Quality control Lab of No 1 QC Subdivision Kibbanahalli
Procurement of Lab equipments for Quality Control Lab of No.29, Q.C Subdivision Tumkur
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 07 (Package Consists of 5 Works Rs.1000.00 Lakhs) 1) Resurfacing to Bhadrappa Layout main Road from Tata Nagara junction to ORR. 2) Improvement and Asphalting to abbigere main road from singapura bus stop to abbigere lake. 3) Improvements to Kodigehalli Rub to BEL Circle via Najappa Circle. 4) Improvements to vidyaranyapura ward office road from Vidyaranyapura main road to Somanna Garden. 5) Improvement to sampige road from thindlu main road to canara bank layout via tennis court.
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 02 (Package Consists of 4 Works Rs.1000.00 Lakhs) 1) Improvement and asphalting to Sampigehalli - Kogilu main Road from Sampigehalli to Kogilu. 2) Improvement to roads and drain of kogilu layout main road from kogilu road to reva collge road (thanisandra main road). 3) Improvement to raod and drains of Winnfield Garden and MCECHS Layout main roads 4) Improvements to Fatima & defence layout main road from Thanisandra main road Fatima layout.
Providing PMC Services including Supervision, Quality control for Comprehensive Development works to roads drains footpath Repairs to Building and construction of culverts and Improvements of drains in Narayangowda Layout, BTM Ist stage Roopenanagara, Vishya Bank colony Puspa Layout HBCS Layout BTM 2nd Stage and Resurfacing to ORR from Jayadeva to Silk Board 31st Main Road and other Improvement works in Surrounding areas of Adugodi BTM Layout and Koramanagala Sub Division in BTM Layout Constituency (No of 09 Works) Package No 06
Calibration 1, Calibration 2, Calibration 3, Calibration 4, Calibration 5, Calibration 6, Calibration 7, Calibration 8, Calibration 9, Calibration 10, Calibration 11, Calibration 12, Calibration 13, Calibration 14
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 03 (Package Consists of 3 Works Rs.1000.00 Lakhs) 1) Improvements to Roads and drains of Hegdenagara 1st 2nd Main Roads and Shabarinagara main Road from Thanisandra main Road to Narayanapura Road Via Shiradi Sai Layout.2) Resurfacing to Dasarahalli main road from dasarahalli village to JNC circle via Sobha Moon Stone.3) Improvements to Sarayapalya and Ashwath Nagara Main Road from Thanisandra Main Road to Telecom Layout via aman enclave,matuhi saw mill and masjid E Quba Road.
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package-1 1. Improvements to Drain and Footpath at Wheeler Road Extension from Pottery Road to 6th Cross and Surrounding area in Sarvagna Nagara Division 2. Improvements to Drain and Footpath Work at Hutchins Road, 6th Cross Jai Bharath Nagara and Surrounding area in Sarvagna Nagara Division 3. Improvements to Road and Drains at Rajkumar Under Pass and below Lingarajapura Flyover in Sarvagna Nagara Division 4. Improvements to Drain and Footpath at Banasawadi Main Road from ITC Bridge to Jeevanahalli Main Road both Sides and Surrounding area in Sarvagna Nagara Division
Providing PMC Services including Supervision & Quality control for Comphrensive Development and Improvements of Roads and Drains in Ganganagar Extension, Mutthappa Block, Pappanna Block, HMT Layout Phase - 1 and Surrounding areas, Vasanathappa Block, Giddappa Block, HMT Layout Phase - 2 and Surrounding areas in Ward No. 67, Ganganagar, 14th, 6th Cross 1st Block RT Nagar, 6th Main Road, 15th,16th and 17th Cross Road 2ndBlock RT Nagar, Dinnur, Ajappa Block and Surrounding areas, 2nd, 3rd, 4th, 5th Cross Roads Matadahalli and Mariyappa Block, Lingappa Block and Surrounding areas in Ward No. 68, JC Nagar (Ward No 67 & 68 Package NO-03)
Calibration 1, Calibration 2, Calibration 3, Calibration 4, Calibration 5, Calibration 6, Calibration 7, Calibration 8
Providing PMC Services including Supervision Quality control for Comprehensive Development works to roads drains footpath Repairs to Building and construction of culverts in Madduramma colony repair works to AEE Office BTM Layout improvement works to Priyadarshini Park and other works in Balajinagara Ist ABCD cross, Venkateshwara Layout, Jogi colony in ward No 152 and Resurfacing to Adugodi Main road and 8th cross road BTM 1st Stage and other Improvement works in Surrounding areas of Adugodi, BTM Layout and Koramanagala Sub Division in BTM Layout Constituency (No. of 7 Works) Package No 05
Providing PMC Services including Supervision & Quality control for Comphrensive Development and Improvements of Roads and Drains in Anjan Murthy Circle to MLA Layout, AECS Layout, KGE Layout, Maruthi Layout, HIG Colony and Muneshwara Temple, Railway Colony, Lottegolahalli, Basaveshwara Layout, Geddalahalli and Surrounding areas in Ward No. 61. Radhakrishna Temple, Ashwatha Nagar, Basaveshwara Layout, Bhoopsandra, Postal Colony, Nagshettyhalli, KEB Layout and Surrounding areas in Ward No. 62, Sanjaynagar, 4th, 5th Main SBM Layout Anand Nagar, Traffic Police Station to UAS Layout, Chowdiah Block, SSA Service upto Seethappa Layout,Vinayaka Layout,S S A Cross Roadsand Surrounding areas in Ward No. 63, Hebbal and M.R. Garden,Patel Muniyappa Layout, Gangamma Layout, Kanakanagar and Surrounding areas in Ward No.64,Vishwanath Nagenahalli WardNo 61,62,63 & 64, 4 Works, Package NO-01
NDT inspection charges towards Turbo Charger Project
Repairs to Division office and Quality control office at KBJNL Camp for Year 2025-26
Procurement of Lab equipments for Quality control Lab of No.2 Q C Subdivision Gorur
Improvements to electrical system of Quality control Lab of No 4 QC Sub Division Nanjanagudu.
Procurement of Lab equipments for Quality control Lab of No.1 HRBHLC Subdivision Q.C Channarayapatna
Providing PMC Services including Supervision, Quality control for Comprehensive Development works to roads drains footpath Repairs to Building and construction of culverts Development of Bethany ground and B Mona and other Parks and Play grounds in BTM Layout Constituency and Improvements of drains in VGS Layout ST Bed Ashwini Layout 7th Block Koramanagala Grape Garden, Nadugudde, Srinivagilu, Venkatapura, Jakkasandra, HSR 5th Sector, Teacher Colony and Resurfacing to 7th cross Ejipura Main road, and other Improvement works in Surrounding areas of Adugodi, BTM Layout and Koramanagala Sub Division in BTM Layout Constituency (No. of 7 Works) Package No 07
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 06 (Package Consists of 5 Works Rs.1000.00 Lakhs) 1) Improvement to 1st main road Amruthnagara from bellary road to Amruthahalli Police station. 2) Improvements and asphalting to new railway Parallel road from Bellary main road (KIA Road) to Jakkur Village via GKVK layout. 3) Improvements to chokkanahalli main road from thanisandra main road to chokkanahalli circle and connecting road from chokkanahalli to thirumenahalli govt school. 4) Improvement to conncting road between tindlu circle to M S Palya circle via Vidyaranyapura Main Road (9th Main Road). 5)Improvement to Roads and Drains of Miltary Dairy farm compound parallel road from bellary road to Impact Collage.
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 04 (Package Consists of 6 Works Rs.1000.00 Lakhs) 1) Improvement to KPSC Layout connecting road Agrahara Main Road to KPSC Layout.2) Improvements to Bellahalli Kannur main road from Belaahalli Junction to GBA Boundary.3) Resurfacing to Yogesh nagara and Kempapura Village Road ORR to Coffee Board Layout.4) Improvements to Bharathnagara main Road from Rachenahalli main Road to Thanisandra main Road via abubakar masjid road.5) Improvement to roads and drains of Datta Twonship main road from Bagalur main road to datta township.6) Improvement to NR wind gate main road from Sampigehalli Mai Road to Green Garden Phase 1 Layout.
PROVIDING MAN POWER FOR MAINTENANCE WORK IN VARIOUS SECTIONS OF MAIN DAIRY PROCESSING, PLANT ACCOUNT & RMRD, QUALITY ASSURANCE, PRE-PACK, CANTEEN WORK FOR THE PERIOD OF TWO YEARS
BIMETALLIC BAND SAW BLADE 3750mm (L) * 27mm (W) * 0.9mm (T) * ¾ TPI, BIMETALLIC BAND SAW BLADE 3750mm (L) * 27mm (W) * 0.9mm (T) * 4/6 TPI, BIMETALLIC BAND SAW BLADE 41mm (L) * 1.3mm (W) * ¾ TPI* 5.4 mtr (L), BIMETALLIC BAND SAW BLADE 3750mm (L) * ... ¾ TPI with ... ¾ TPI
ENDURA M-51 3/4 TPI BI METAL BAND SAW BLADE, SUPERIA M-71 2/3TPI BI METAL BAND SAW BLADE, SUPERIA M-71 3/4 TPI BI METAL BAND SAW BLADE, MAGNUM CARBIDE 2/3 TPI BI METAL BAND SAW BLADE, MAGNUM CARBIDE 3/4 TPI BI METAL BAND SAW BLADE, ENDURA M-51 2/3 ... 2/3 TPI BI ...
Calibration Services - Radiometer Calibration; Irradiance calibration; NABL Labs; Buyer premises (onsite)
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Comprehensive Development to roads, drains and Asphalting roads from Shampura Village to Via (LR Bande Office to Govindapura Railway gate, Dinnur Main Road From Starm Water Drain, Via Kavalbyrasandra Govt School Upto Shampura Village, Amc Road Venkateshwara Swami Temple To Ambedkar Medical College, KHB Main Road From Dinnur Main Road Pushpanjali Theatre To Veeran Palya Railway Gate, Sultanapalya Main Road From Dinnur Main Road To Manorayanapalya Arch, Assaye Road Cross Road & 2nd Cross Promenade Road And Cross Road, Wheeler Road Cross Roads, Cleveland Town Road, Promenade Road From Neethaj To St . Johns Church Road & Surrounding area in ward no 69 Kavalbyarsandra, 70 Kushalnagar, 75 Pulikeshinagar (Govt Sl No. 58, 59, 60, 61, 62, 63, 64, 65, 66) Package No 01
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 05 (Package Consists of 8 Works Rs.1000.00 Lakhs) 1) Resurfacing at all Service roads of Hegdenagara flyover inculding K Narayanapura main road.2) Resurfacing to Jakkur Main Road behind Jakkur flying school from Shanimahathma Temple to Kempegowda Circle and cross roads and including connecting road to GKVK Layout.3) Improvements to Markadeyanagara main road from kogilu road to agrahara layout main road.4) Improvement to drains and asphalting to prakruthinagara main road from kogilu road to bollineni Appt.5) Improvement to Bellahalli Main road from Kogilu road to Bellahalli Bande.6) Improvement to toad and drains of Krishna Garden Main road from Bagalur Main Road to Kattigenahalli village and connecting road from thanisandra main road (petrol bunk road).
Calibration Services - CALIBRATION OF VIBRATION CALIBRATION EXCITER FOR PERIOD OF 3 YEARS CALIBRATION INTERVAL 1 YEAR; CALIBRATION OF VIBRATION CALIBRATION EXCITER FOR PERIOD OF 3 YEARS CALIBRATION INTERVAL 1 YEAR; NABL Labs, REFER SOW; REFER SOW
Improvements to electrical system of quality control lab and office of No.2 QC Subdivision Mysuru
Providing PMC services including Supervision, Quality Control for the Construction of Commercial complex at CHANARAYAPATNA TMC
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package-2 1. Improvements to Road and Drains at 9th Main, Pillanna Garden from Arabic College Road to 12th Pillanna garden in Sarvagna Nagara Division 2. Improvements to Road, Drain and Footpath Kammanahalli Main Road from Empire Hotel to Corporation Bank in Sarvagna Nagara Division 3. Resurfacing of Oil Mill Road from Kammanahalli Main Road to Hennur Main Road in Sarvagna Nagara Division 4. Improvements to Roads, Drains and Footpath Work at 5th Main HRBR Layout 2nd Block from Kullappa Circle to Service Road in Sarvagna Nagara Division 5. Resurfacing of 9th Main HRBR Layout 1st Block from Service Road to 2K Cross and Surrounding area in Sarvagna Nagara Division 6. Resurfacing of Banasawadi Main Road from Ram Murthy Circle to Mukutamma Temple in Sarvagna Nagara Division
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 01 (Package Consists of 6 Works Rs.1000.00 Lakhs) 1) Resurfacing to BSF Road from Bagalur Main Road at Reva collge junction to GBA Boundary. 2)Improvements and Asphalting to Palanahalli Main Road From bellary Main Road at Palanahalli gate to Bagalur main road at All Mart via Kattigenahalli Village.3) Improvements to New Shanthinaara Main Road from Thanisandra main Road to New Shanthi Layout.4) Improvement to Roads and Drain of Reva Collage Oppsite road from thanisandra main road to kattigenahalli village via Bhatasingh layout.5) Improvement to Drains and Asphalting to Sri Balaji Lyt Main Road and Commanders glorry apt road Singapura.6) Resurfacing of New Krishna Temple road from Doddabommasandra Arch to Vysa school at Railway Gate
Custom Bid for Services - SELECTION OF SERVICE PROVIDER FOR SOFTWARE TESTING AND QUALITY ASSURANCE FOR A PERIOD OF THREE YEARS IN CANARA BANK Similar Category Software Support Services 2.0
Providing Project Management Consultancy Services including Supervision, Quality Assurance, Progress Monitoring/Reporting, Measurement Billing & Documentation for the work of Construction of 24 PC Qtrs. at Halavagalu in Vijayanagara District.
Providing Project Management Consultancy Services including Supervision, Quality Assurance, Progress Monitoring / Reporting, Measurement, Billing and Documentation for the Work of Construction of 2-Bay Fire Station at Nidagundi in Viajapura District. (CALL-2)
Custom Bid for Services - NDT Ultrasonic Testing service
NDT of BCW Pump Casing for Telangana project
Calibration Services - DEBRIS TESTER CALIBRATION; DEBRIS TESTER CALIBRATION; OLYMPUS AUTHORISED LAB; Lab
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package-3 1. Improvements to Roads and Footpath (Both Side) of Chikka Banasawadi Main Road from Bata Show Room to 3rd Cross Chikkabanasawadi in Sarvagna Nagara Division 2. Improvements to Drains and Footpath at 4th Cross OMBR Layout from 7th Main to Channasandra Main Road and 7th Main, Babusapalya, HRBR Layout in Sarvagna Nagara Division 3. Improvements to Footpath and Drains at 2nd Cross HRBR 1st Block from 7th Main to 100 Feet Road in Sarvagna Nagara Division 4. Improvements to Roads, Drains and Culverts at Grace Garden 1st Cross, Raghavendra Nagara 1st, 2nd and 3rd Cross Roads in Ward No.76, Hennur 5. Improvements to Roads, Drains and Culverts at HBR Layout 4th Block, 4th Main Road (VBR College Road) and 5th Block 24th Cross Road
Calibration Services - Calibration for 4 years in calibration interval of 2 years with traceable calibration certificate of Master Load Cells; Calibration for 4 years in calibration interval of 2 years with traceable calibration certificate of Master..
Custom Bid for Services - Miscellaneous Work in Quality Control Operation at Different Locations Under Geology and Quality Control Department i e Screening Plant Loading Plant QC Lab as per suggested location by site incharge for the period of one ..
Calibration Services - CALIBRATION OF DEBRIS TESTER; CALIBRATION OF DEBRIS TESTER; NABL Labs; Lab
Calibration Services - CALIBRATION OF DEBRIS TESTER; CALIBRATION OF DEBRIS TESTER; NABL Labs; Lab
Calibration Services - CALIBRATION OF DEBRIS TESTER; CALIBRATION OF DEBRIS TESTER; NABL Labs; Lab