Loading…
Loading…
3,215 results • Best match
Construction of Culvert from Pole No:G316 G302 transformer at Main Road and from (Dead end of the Street) G159,G150,G149,G133,G132,G114,G113,G97 to G96 at Main Road and from G36,G85,G84,G54,G76,G55 to G47 & from G47,G46,G36 to G26 and G426,G450,G217,G275,G338 to G386 and G295 to G317 at Nakkabanda in Ward No:15
Providing power infrastructure by erection of 6KM 11kV Line & 5KM LT Line along the proposed internal roads with required distribution transformers along with erection of 4.9KM 11kV incoming line from 33/11kV SS and Providing 60 Nos. 2x90W LED Street lights and 134 Nos. 1x90W LED Street Lights on 9 Mtrs long octagonal poles and 100 Nos. 60W LED Street lights to the existing PSSC Poles along the Main roads and Internal roads at IP-Narampeta(V), Atmakur(M), Nellore Dist. under MSE CDP (4th Call).
Providing sewerage and septage Treatment Scheme in Kakinada Municipal Corporation under AMRUT Project for 2016-20, which includes Survey & Investigation, Design & Engineering, supply, construction, installation, Testing and commissioning of UGD net ... set, transformers and ...
Laying of CC Road from 3rd Road, 4th Road Junction Point transformer to 12th Cross Road Junction in Sainath Nagar Division No. 21.
Supply, Installation, Testing, Comm. of Transformers, DG Set, LT Switch Gears, High Mast, Cabling, Lighting, Earthing, Plant Communication System and allied Electrical, Civil and Structural Works for New Grass Root POL Terminal at Atchutapuram, AP
Extension of 3-Ph Supply to Villages having Population above 5000 in Nellore, Chittoor and Kadapa Districts in APSPDCL by erecting 11 kV Lines, 3 Ph Distribution Transformers and Connected LT Lines on Turnkey Basis
Repairs and remedial measures to transformers and panel boards along with procurement of battery sets in Old Lingala, Bonala, Lopatnuthala and Sothrium pump houses of CBR Right Canal in Lingala mandal of YSR Kadapa District.
Drilling of Bore wells and installation of Transformer for electrical supply in SS Palli cheruvu area of Gooty Municipality Under DMF Grants 2025-26
Maintenance and Repairs of Transformers Motors Pump sets starters Gate Valves Vaccum Pipelines and Supply and Fixing of batteries to Generators in Head Water Works and Sump Under Summer action plan 2025 26 in Bhimavaram Municipality
Repairs and remedial measures to transformers and panel boards along with procurement of battery sets in Velidandla, Thathireddy palle and Beyond Thathireddy palle pump houses of CBR Right Canal in Lingala mandal of YSR Kadapa District.
Maintenance works of lighting system at all locations of main plant of Stage-IV,RTPP such as TG Building,Boiler,Mills,ID Fan,FD Fan,PA Fans,ESP Hoppers,ESP Building,Vaccum Pump House,Slurry pump house,Water System,DG House,Transformer Yard,Compressor house,FOPH,remote silo,Street lights,Fire station,SPF gate etc and attending of all fuse off calls as and when required during the year 2020-2021
Set of Gasket for Transformer Oil cooling system for 3 phase locos Material as per CLW Specificat ion No.CLW/ES/3/0142-Alt.F or latest. Set requirement consisting of 5 items as per the details in given annexure. Note: CLW approved sources shall only participate in the tender or supplier offers shall be considered with valid tender specific authorisation certificate from CLW source shall be submitted along with their offer.
Strengthening of earth mat by providing 100X16mm MS flat, 75X12mm MS flat, 40mm MS rods & additional earth pits for 220KV Tekkali-I feeder bay, 220KV bays of 160MVA PTR-I & 100MVA PTR-II, 7Nos 132KV feeder bays, 3Nos 132KV Transformer bays and 9Nos 33KV feeder bays to minimize /nullify equipment damages during fault periods and also to provide metal spreading at 220KV SS Garividi under RMI 24-25
Macherla Municipality- APUFIDC Grant - 1st Call - Providing CC Road from Upputholla Ramana house (14-2-600) to mukkalaramana house (transformer) in 9th ward Macherla Municipality.
Repair/Rectification and complete overhaul of failed 3 Ph,15 MVA , 15.75kV/6.9kV, Unit Auxiliary transformer (Sl. No: 1627/3), Make :Bharat Bijlee,YOM:1976.
Laying of CC Road from Transformer to D.no.14-79 SK .Baji house in 14th ward in Chilakaluripet municipality 15th FC 2024-25 1st Inst
Procurement of M.S. Stay Clamps for 8m PSCC Poles (SET), M.S. Stay Clamps for 9.1M PSCC Pole (SET), LT STUT AND SIDE ARM, LT 1 PH 3 WIRE CROSS ARMs with back CLAMP for 9.1mts PSCC poles, 11KV side arm with strut S/F 9.1 mts PSCC Poles, Pole Mount Arrangement for 16/25KVADTR (channel)
i)Providing Facilities Like CC Road, Compound wall, Water supply etc to SC Burrial Ground in Muktyala Road in Jaggaihapet Municipality. ii) Construction of SC Community Building with 200 seating capacity at 15th Division of Williampet in Jaggaiahpeta ... road transformer to ... road transformer to ...
i).Providing Facilities Like CC Road, Compound wall , Water supply etc to SC Burrial Ground in Muktyala Road in Jaggaihapet Municipality. ii) Construction of SC Community Building with 200 seating capacity at 15th Division of Williampet in ... road transformer to ... road transformer to ...
Providing HVAC System to the Staff Halls/work stations to all the Department offices in all 4 floors (G+1+2+3) of Integrated Collectorate Complex Building at Srikakulam (Indoor & Outdoor Power cables, Panel boards, Transformers & APEPDCL Charges).
U/V Release, Racking Handle S2, Transformer, Cluster contacts for S2500A Naval Application, Boiler heating element, Voltmeter selector switch 10A Position RY- YB-BR- OFF- 48x48m
Capital Overhaul of TELK Make 31.5 MVA, 220 KV/7.1 KV Station Transformer-4 (Sl.No:120328) during the Capital Overhaul period for the year 2026-27.
Contstruction of CC drain from Transformer to D.no 14-79 SK.Baji house in 14th ward in Chilakaluripet municipality under 15th FC Grant 2024-25 (1st inst)
Survey, Design, Supply, Installation, Commissioning of 4No.33/11KV Semi- Indoor Sub-stations and 3Nos. 33/11KV Indoor Sub-stations with connected 33KVand 11KV Lines in operation circles, Tirupati, Kadapa, Sri Sathya Sai and Kurnool on Semi - Turnkey ... and DTR are ...
Raising of 3 No.s 33KV LV bay VCB's including the dismantling and erection of bus isolators and 33KV current transformers, strengthening of bus structures with RS joist poles at 132/33KV Sub-station Amalapuram in B.R. Ambedkar Konaseema District
Supply and fixing of 160 KVA Transformer at Chinnatekur Booster station of O&M of CPWS Scheme to Ulindakonda, Dhone and 28 Other habitations in Kurnool District.
Minor Overhaul, Oil filtration and its associated works of Generating Transformer 8R, 8Y & 8B as and when required for the period 2026-27 of Stage-V, Dr.NTTPS
Construction of CC road from D.NO. 62/37 to 62/41, 58/299 ro 58/315-1, 59/166-6 to Transformer point in Nabikota Main road, CC Patches at Mariyapuram Church near Food Court and CC drain from 59/2 to 59/6, 61/51-A to 61/61, 61/39-1 to 62/45 and Culvert at 59/6, 61/39-1 in Akkayapalli 47th Division of Kadapa Municipal Corporation
Laying of CC Road 1) from Deepala Siva jagan Mohan Rao house (d.no: 3-5-20) upto transformer at Kamisetty vari Street 2) From Neeli Raghavayya house (d.no:3-5-65) upto RMC Pole no:27/38 in Padmasalivari street 3) From P Ramakoteswara rao house (D.no: 3-5-98/1) upto Pole No SS9/A1/3 in 27th ward under 15th FC 2022-23 untied Grant (1st Installment ) in Repalle Municipality.
Estimate for replacing the existing 12V/100 AH Batteries - 30 Nos. and 40 KVA Online UPS System - 01 Nos. with New 40 KVA Online UPS system (3Ph-in-3Ph out) double conversion & IGBT inverter online UPS System fully Microprocessor Controller, ... Isolation Transformer Based ...
Construction of cc drain 1) from Deepala Siva jagan Mohan Rao house (d.no: 3-5-20) upto transformer at Kamisetty vari Street 2) From Neeli Raghavayya house (d.no:3-5-65) upto RMC Pole no:27/38 in Padmasalivari street 3) From P Ramakoteswara rao house (D.no: 3-5-98/1) upto Pole No SS9/A1/3 in 27th ward under 15th FC 2022-23 untied Grant (1st Installment ) in Repalle Municipality.
Construction of CC road from D.NO. 62/37 to 62/41, 58/299 ro 58/315-1, 59/166-6 to Transformer point in Nabikota Main road, CC Patches at Mariyapuram Church near Food Court and CC drain from 59/2 to 59/6, 61/51-A to 61/61, 61/39-1 to 62/45 and Culvert at 59/6, 61/39-1 in Akkayapalli 47th Division of Kadapa Municipal Corporation
Set of Bushing porcelain insulators(Top & Bottom) for the main transformer 7775 KVA in 3-phase locos as follows. 1) DT 3/2000 of ABB drawing no. HSTN 310508. Qty/set. = 20 nos. 2) DT 3/1000 of ABB drawing no. HSTN 310507. Qty/set. = 10 nos. 3) DT 3/630 of ABB drawing no. HSTN 310506. Qty/set. = 10 nos. 4) DT 1/250 of ABB drawing no. HSTN 310500. Qty/set. = 20 nos.
High voltage rating HRC cylindrical type fuses 2A ( without holder ) 1.2 KV, size 8 x 50 mm for voltage control, used in prime circuit of 200VAcontrol transformer of LHB type Non AC and AC coaches suitable for fitment in existing holder. Similar to Siba make part No.184000.2 in switchboard cabinet of LHB AC coaches. Acceptable Makes: Siba, Eaton Bussmann, Wohner, Ferraz,GE,Schneider,L&T. Spec:2A 1.2 KV Size 8 x 50 mm.
Providing overhead 11 kV/LT lines with 3 Nos. 100 kVA Distribution Transformers, 80 Nos. 90 W LED Street lights on 9.0 m long single arm Octagonal poles along internal roads at IP- Nayunipalli (V), Vetapalem (M), Bapatla District under MSME.
Supplying of 1No. 3MT Diesel Van on Monthly hire basis for Transportation of Distribution Transformers, Meters and other materials to various Locations in Operation Circle, West Godavari. The vehicle is under the control of the Deputy Executive Engineer/Operation/Palacole
Supplying of 1No. 3MT Diesel Van on Monthly hire basis for Transportation of Distribution Transformers, Meters and other materials to various Locations in Operation Circle, West Godavari. The vehicle is under the control of the Deputy Executive Engineer/Operation/Bhimavaram
Supplying of 1No. 3MT Diesel Van on Monthly hire basis for Transportation of Distribution Transformers, Meters and other materials to various Locations in Operation Circle, West Godavari. The vehicle is under the control of the Deputy Executive Engineer/Operation/Tanuku
Supplying of 1No. 3MT Diesel Van on Monthly hire basis for Transportation of Distribution Transformers, Meters and other materials to various Locations in Operation Circle, West Godavari. The vehicle is under the control of the Deputy Executive Engineer/Operation/Tadepalligudem
EA3778V-T-14/2P(LAMP TUBULAR 200W 6.6 APMS FOR RUNWAY LIGHT), EA3778V-APP-2PIN(TWO PIN PLUG ASSEMBLY), EA3778V-AMA-2001(ISOLATING TRANSFORMER 200W), EA3778V-100772(SOLENOID)
Servo controlled automatic voltage stabilizer 300 KVA Three Phase, Servo controlled automatic voltage stabilizer 250 KVA Three Phase, Servo controlled automatic voltage stabilizer 200 KVA Three Phase, Servo controlled automatic voltage stabilizer 150 ... Isolation Transformer , ... Isolation Transformer , ... Isolation Transformer , ... Isolation Transformer , ... Isolation Transformer , ...
Analog MI Multi range Voltmeter, Analog MI Multi range Ammeter, Analog MC Multi range Voltmeter, Analog MC Multi range Ammeter, Analog Wattmeter UPF, Analog Wattmeter LPF, Digital Power Factor Meter, True RMS AC and DC Clamp Meter withFrquency ... Auto Transformer , ... Changing Transformer
Spark Rod with Tip Make BCPL, Spark Tip Make BCPL, Ignition Cable, Spark Gap, Capacitor, Transformer, Primary power supply board, Push Button, Switch Lock 3 way Push Button, Battery
Supply of (i)BCH make contactors and (ii) EPDM Rubber Bellows of Cylindrical Type for Isolated Phase Bus Ducts of Generator Transformer(GT-5) pertaining to Stage-III,Dr.NTTPS
Supply, Installation ,testing and commissioning of 25 KVA automatic power factor capacitor at Tadipatri,Dharmavaram,vajrakarur,Peddapappur K.M at Ananthapaur Dist for the work of AME for IEI and EEI,yard lights,LTOH Lines,Transformer sub-station etc., in S.V Rest house and Vishnu Nivasam rest house at Tirupati,TTD Kalyanamandapams in Ananthapur Dist., and purchase of materials from Imprest and fabrication charges etc., pertaining to A.E-III in ESD-II, Tirupati for the year 2018-19.
Providing CC Roads From 1) d2-3/a2 to ep no d2-3/b5 at bangaramma colony 2) transformer to mpp school at prasanthi nagar 3) culvert to burrial ground at prasanthi nagar 4) public bore well to dno 114.at prasanthi nagar 5) drain from dno 4-51 to pakala sriram murthy house. 6) public bore well to gedda in bangaramma colony in Ward No.17 Under General Fund 2018-19. Est cost:39.55 Lakhs
Supply, Installation ,testing and commissioning of 25 KVA automatic power factor capacitor at Tadipatri,Dharmavaram,vajrakarur,Peddapappur K.M at Ananthapaur Dist for the work of AME for IEI and EEI,yard lights,LTOH Lines,Transformer sub-station etc., in S.V Rest house and Vishnu Nivasam rest house at Tirupati,TTD Kalyanamandapams in Ananthapur Dist., and purchase of materials from Imprest and fabrication charges etc., pertaining to A.E-III in ESD-II, Tirupati for the year 2018-19.
Providing CC Roads From 1) d2-3/a2 to ep no d2-3/b5 at bangaramma colony 2) transformer to mpp school at prasanthi nagar 3) culvert to burrial ground at prasanthi nagar 4) public bore well to dno 114.at prasanthi nagar 5) drain from dno 4-51 to pakala sriram murthy house. 6) public bore well to gedda in bangaramma colony in Ward No.17 Under General Fund 2018-19. Est cost:39.55 Lakhs
Maintenance works of lighting system at all locations of main plant of Stage-IV,RTPP such as TG Building,Boiler,Mills,ID Fan,FD Fan,PA Fans,ESP Hoppers,ESP Building,Vaccum Pump House,Slurry pump house,Water System,DG House,Transformer Yard,Compressor house,FOPH,remote silo,Street lights,Fire station,SPF gate etc and attending of all fuse off calls as and when required during the year 2023-2024. i.e., from 01.04.2023 to 31.03.2024.
Maintenance works of lighting system at all locations of main plant of Stage-IV,RTPP such as TG Building,Boiler,Mills,ID Fan,FD Fan,PA Fans,ESP Hoppers,ESP Building,Vaccum Pump House,Slurry pump house,Water System,DG House,Transformer Yard,Compressor house,FOPH,remote silo,Street lights,Fire station,SPF gate etc and attending of all fuse off calls as and when required during the year 2022-2023 i.e. from 01.04.2022 to 31.03.2023