Loading…
Loading…
6,344 results • Best match
For repairing of 1500KVA 11KV/3.3 Transformer of Nichitpur Main Substation S.No.RY2646/4 Make NEI of Nichitpur Colliery under Sijua Area
For complete rewinding and repairing of 1000KVA, 6.6KV/550Volts ECE make Sl.No.C6520/82 Transformer of Sendra Bansjora Colliery under Sijua Area.
For Complete repairing / rewinding of Transformer 500KVA, 6.6KV/550, Sl. No. 28000/22208 Make NGEF of Mudidih Colliery under Sijua Area
Day to day Tower shifting, Transformer shifting and Switch shifting for 3 months in the mines of PEOCP under Hazaribagh Area.
For complete rewinding /repairing of ECE make 750 KVA,6.6 KV/550V Transformer Sr.No.C6506/82 of Mudidih Colliery under Sijua Area
For Partial repairing of 200 KVA,550/440V lighting Transformer 3 Ph, at Jogta More Colony(Jogta Filter) of Mudidih Colliery
For patch repairing of 750KVA transformer 6.6KV/440 -450V, make - Mirzapur Electricals at Feeder Breaker No. 02, SBC, under Sijua Area
Repairing and maintenance of electric connection of 500 KVA Transformer located at Lapanga colony under Bhurkunda Project.
Rewinding and repairing of 100KVA, 3.3KV/415 Volt of transformer with Sr. no. TS/02, make Marschan and maintenance of 500KVA, 11KV/440V transformer of TSOCP under Hzb Area.
Dismantling of 20 MVA, 132_34.5KV transformer at DVCs Gola Substation and erection, testing and commissioning of the same transformer along with other associated works at Konar Substation of DVC.
Onsite providing, fixing and commissioning of transformer auxiliary cooling fan of 415 volt for cooling of 02 nos. of HT transformer installed at 33KV main sub-station , BnK Area
Transformer Oil Filteration, Testing Silicagel with Breather Cork Sheet Stud Changing of 500 KVA and 750 KVA Transformer and Temprature Meter or Sensor Fitting at BNR Siding, ROCP/SJ.
Separate copper earthing of 11KV/3.3KV, 1.5MVA Transformer, 11KV/440 volt, 100 KVA transformer, 11KV VCB, 3.3KV VCB and 3.3KV starter at intake well under GM unit, Piparwar Area.
(i)for the complete rewinding and repairing of Transformer 6.6KV/440V 750KVA ECE Make at Basdeopur(ii)and Maintenance of 1MVA 6.6KV/3.3KV Transformer of Sendra Bansjora Section ASBNC
Repairing and rewinding of 03 nos. transformer of rating 250KVA, 3.3KV/440V and 02 nos. 25KVA. 3.3KV/440V transformer installed at different locations of Topa Project under Kuju Area.
Complete repairing/rewinding of 500 KVA, 11KV/440V, Transformer, make - Eastern Transformer and equipment (P) Ltd., Sl.No.5811-1 at Lal Bunglow sub-station under NGKC of Kusunda Area
Work in respect of Part repairing or rewinding of 500 KVA 11KV 440V transformer at Raja Bungalow and 315 KVA transformer at Central Hospital Colony GM unit Dhori Area
Shifting, dragging ,transportation (from Kumardubi ss to Nimaghat SS_80KM APPROX) and erection, testing ,commissioning of 25MVA BBL make 132_25KV Railway transformer at Railway transformer 1 Bay of Nimiaghat SS.
Repairing of fencing of the transformer room at river side and for making of new shed for 1 MVA 11KV/440V Transformer installed at Turio Colony under SDOCM Project
COMPLETE OVERHAULING and MAINTENANCE OF 300 KVA TRANSFORMER 3.3KV/440V Lighting TRANSFORMER OIL COOLED TYPE, MAKE GEC, SL. NO TR4B OF BHOWRA POWER HOUSE UNDER E. J. AREA BHOWRA
Complete Repairing/ Rewinding of 200 KVA/ 11 KV/ 440V Lighting Transformer Oil Cooled Type Aluminum Winding Transformer of PCW Under SCW, Make Kirloskar, Sl. No. 83 ED - 072/2.
Complete overhauling and maintenance of 400 KVA transformer 3.3KV/440V lighting transformer oil cooled type make Cromton Sl No 2237 at Bhowra 16 No sub station under E.J. Area.
Matting of colony substation, 1MVA Transformer, 1.6 MVA transformer, main substation and providing of 4 nos. of telescopic discharging rod for main substation of Kedla OCP under Hazaribagh Area
On line filtration of transformer oil for different transformer (LT and HT) installed in different substation like, 4211,4212,4213,4214,4215,4216, Reclaimer I and II, Stacker I and II under CHPCPP,PPR.
Providing stone gravelling in switchyard floor area between inter connected Transformer no. 3 and 4 inclusive of sub-station service transformer bay in 220/132 kV GSS, Chandil-I
PROVN OF ELECTRIC SUPPLY 500 KVA TRANSFORMER FOR MH NAMKUM AND LAY OUT OF HT CABLE AND INSTALLATION OF TRANSFORMER AT OFFRS MD ACCN AND OFFICERS MESS AT RANCHI
Transformer Oil Filtration, Testing Silicagel Cork Sheet Stud Changing New Wings Making of Voltas Limited 500 KVA/3.3 KV 440V Transformer Sl. No.- R12818 at BNR Siding ROCP/SJ.
Work of Providing antiweed Treatment by Laying of Plain Cement Concrete alongwith Metal Gravel Spreading in 132KV and Power Transformer Switchyard at 132 and 33KV Grid Sub-Station, Namkum
Repairing of 02 nos. Auto transformer means for stable power supply to Submersible pump installed for domestic water supply to GRD Project.
For complete rewinding/repairing of 750 KVA 6.6 KV/550 Transformer Crompton Parkinson make Sl.No.24913V of Tetulmari Colliery under Sijua Area
For complete rewinding of 500 KVA, 6.6 KV/550 Transformer make Crompton Parkison Sl No. 6359 at Tetulmari Colliery under Sijua Area
For patch repairing of 500 KVA 11KV/440V Transformer Sl.No.4009855 of CAP-2 Substation of Tetulmari Colliery under Sijua Sijua Area
For complete rewinding of 50 KVA,550/220V Lighting Transformer Sl.No.MDC/SIJ/Tr-134 at Club more Mudidih Colliery under Sijua Area
Part repairing of 100KVA, 3.3KV/220V, Transformer with its unit, Sl.No.-2309 make-Elecon installed at 14 no. coal stock of GVP Phase-II OCP
Replacement of copper Z piece patti for transformers, ACBs,VCBs at different locations as required under KUGP of Hazaribagh Area.
Procurement of Insulating Materials for repair/ rewinding of Electrical Motors and Transformers in respect of RWS Bhurkunda, Barka-Sayal Area
SUPPLY AND INSTALLATION OF CHEMICAL EARTH PIT AT 4 NO. SUBSTATION AND CONNECTION WITH POWER TRANSFORMERS AT AKWMC , KATRAS AREA
Repairing and maintenance and oil filtration of different rating of transformers installed at Substations of Karma Project of Kuju Area.
Installation of double interposing gland bus in various switch gears, motors and transformers installed at Religara Colliery under Argada Area.
Maintenance and repairing of 33kV control panels, VCBs and cooling arrangement of Transformers installed at 33/11kV South Loyabad Substation
Repair/Maintenance of HT OH line for safety view of Transformers from thundering at different locations under GM unit, Kathara
Painting of Transformers, SMs, ILMS, Swaged Steel Tubular street lighting poles and Nomenclature of equipment at CHP, DVC, KTPS, Koderma
Painting of various Transformers and nomenclature of Electrical panels and equipment pertaining to AHP electrical and Colony DVC, KTPS, Koderma
REPAIR OF 33 KV SUB STATION, VCB, RELAY, EARTHING, UG CABLES ETC AND REPAIR/MAINT OF TRANSFORMERS AT RAMGARH CANTT.
Making of new earth pits at 2, 3 and 4 no colony transformers at 4 no substation under Kathara Colliery
Making of new earth pits for different transformers and power controlling switches at sub-station no. 2 under Kathara Colliery
Making and installation of 03 nos fan-stand (including fan) for different transformers at Regional Sub-station under Kathara Colliery
Onsite Oil Filtration of all the Distribution and the Power Transformers under Karo OCP, w.r.t. Karo OCP, under BnK Area
Making of chemical erthing of different power transformers at colony maintenance (9.0) and River side pump house of Kathara Colliery
Extension of Gandhi Nagar Colony Substation boundary wall for installation of New transformers, VCBs and ACBs at GNC, CCL, Ranchi