Loading…
Loading…
72,907 results • Best match
Procurement of Transformer Oil Pumps for HVDC Converter Transformers at HVDC, POWERGRID Bhiwadi.
TTPS ES Circle EM II Arresting oil leak in the HV LV bushing and improve the BDV of transformer oil in 2MVA Power Transformer at Clarified Water Pump House
Repairing / Rewinding of 300 KVA, 11 KV/440V Power Transformer Oil cooled type, Make Abhay Transformer and Switch gear, Sl. No. 1866 of Intake Well at Bhojudih Coal Washery.
Complete overhauling and maintenance of 250 KVA Transformer 11KVby440V power transformer oil cooled type make NEI Electrical Sl. No 86014 of Bhowra 4A patch project under E. J. Area.
Maintenance and overhauling of 600KVA power transformer installed at sub-station and repairing of 100KVA, 11KV/440V Lighting transformer installed at crusher unit under North searsole OCP, Kunustoria Area.
Design, Supply, Erection, Testing, Commissioning of 25 MVA Power Transformer at Tembhu LIS Stage 3, Mahuli. 4 MVA Transformer and 33 kV bay at stage 4 Vejegaon, Tal.Khanapur, Dist.Sangli
REPAIR /REPLACEMENT AND MAIN OF HT OVER HEAD LINE, HT CABLES, POWER TRANSFORMER AND DISTRIBUITON TRANSFORMER AND ALL CONNECTED ITEMS OF VARIOUS LOCATION S AT 25 ED AFS DEOLALI
ERECTION OF 160MVA, 220/132KV POWER TRANSFORMER AT 220 KV GSS KUNDA KI DHANI UNDER TRANSFORMER AUGMENTATION PLAN (2023-24) on labour contract basis against TN-1145/2025-26
Complete Repairing / Rewinding of 200 KVA , 11KV/440 V Power Transformer Oil Cooled Type , Make ALFA Transformer (Pvt Ltd) , Sl.No . 200/1 of New Colony at Bhojudih Coal Washery.
The Carriage of New/Repaired Medium power Transformer from Store to site and Carriage Damaged/burnt Transformer from Site to Store in juridiction of EE EDD II Gopiganj bhadohi.
Complete rewinding and repairing of power transformer 500KVA/11KV, 440V Sl. No. Dugda/Sector-2/Transformer no.2 installed at Sector -2 of Dugda Township under Block-II Area
Loading, unloading and carriage of 10 MVA 3 phase power transformer and carriage of the same from MT lab Sundar Nagar to 33/11 KV S/Stn. Maliana Shimla via baddi route and installation of 10 MVA three phase power transformer at 33/11 KV S/STn. Ma
ENIT for hole sealing- rodent repellent- improve conductivity of joints of CB of 11kV panel set of 1.Power transformer 2x25-31.5 MVA 66-11kV TF at 66kV S-Stn. Sadhaura during FY 2022-23 2.Power transformer 2x12.5-16 MVA 66-11kV TF at 66kV S-S
Providing One Vehicle (tata Ace/maxi Cab Or Equivalent) With Driver For Transportation Of Transformers From Divisional Store To Site Locations In Sub-divisions And Sections Of Sirsi Division And For Transportation Of Failed Distribution Transformers From Sites To Sirsi Divisional Store In Hescom, O & M Sub-division, Mundagod In Sirsi Division Of Sirsi Circle In Uttara Kannada District.
Transformer Oil filtration and maintenance of Transformers during MTA-24 at HWPM
STANDARDIZATION OF TRANSFORMER STATIONS AND REPLACEMENT OF AGED TRANSFORMERS IN KINFRA SEETHANGOLI
Series Resonant Transformer with Partial Discharge Measurement System for Instrument Transformers an
TESTING OF TRANSFORMER OIL OF POWER TRANSFORMERS AT ALUMINA REFINERY, NALCO, DAMANJODI
Replacement of 220KV bushings, inspection of core, filtration of oil and maintenance of Interconnecting transformer-2 at Captive Power Plant, HWP(Manuguru)
Custom Bid for Services - Job Work of Testing of 33kV 440V 1200 kVA Power Transformer and Testing of 33kV HT Cable from Circuit Breaker to Primary of Transformer of Utility Transformer at Finlay Mills Achalpur
Providing and fixing outdoor distribution transformer substation and separate meter for each and every quarter in GST Bhavan Residential Complex, Pune. Subwork/Packages: As per NIT
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5833147 Dated : 06-02-2025 Bid Document 1/10 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 7221600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 144440 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : FA and CAO/East Central Railway/Hajipur East Central Railway, Hajipur (Fa And Cao/east Central Railway/hajipur) MII Purchase Preference 2/10 MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6383328 Dated : 11-07-2025 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 7 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1475000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 29500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/11 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr Divisional Finance Manager, NR, LKO 1.EMD/PBG to be submitted to the Sr. Divisional Materials Manager, Hazaratganj Lucknow Office. 2. For any bid related query/submission of documents/correspondence, you may contact following Supervisor: Mr.Nripendra Kumar, ChDMS [Mob9794833772] of the Office of Sr. Divisional Materials Manager, Hazaratganj Lucknow. (Sarvesh Singh) Splitting
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6711064 Dated : 23-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 4 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/8 NA MADHYA PRADESH, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Jeevan Roy Mathur) Splitting
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number ( ) : GEM/2024/B/5729217 Dated : 27-01-2025 Bid Document 1/15 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 2362500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 47250 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : GM (MM) Materials Management, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi - 834008 (Cmpdil) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 2/15 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6910873 Dated : 27-11-2025 Bid Document 1/11 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority RITES Auto CRAC Days 30 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 71300 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 36 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/11 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : FA and CAO ER KKK Eastern Railway HQ, Indian Railways, Eastern Railway, Ministry of Railways (Fa And Cao, Er, kkk)
for supply of BIS Certified Level-III 100 KVA and 200 KVA Distribution Transformer
Construction of 01 no of Power Transformer Plinth and 05 nos of CT VCB foundation plinth in different Sub Stations underDistUttar Dinajpur
Urgent repairing of 1250 KVA power transformer at Head works Churu under Division Bhaleri with one year defect liability period
Procurement of Transformer Cooler Fans Motor for installation at Generator Transformer, Station Transformer, ICT and Unit Transformers located at 400kV Switch Yard/ Transformer Yard of DVC-RTPS
Overhauling/repairing of 11/0.433KV, 2MVA Distribution Transformer at sub-station
Rate Contract Award Rate Contract Award For Purchase of Small Distribution Transformer Repairing Unit Spare Parts under Jurisdiction of General Manager ONMMPMKVVCL,Ashoknagar
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 07 No. Power Transformer
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 08 No. Power Transformer
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 08 No. Power Transformer
Capital Capital maintenance including overhauling and change of transformer oil for longevity of 1Nos 31.5 MVA, 132,11 KV Power Transformer CGL Make at 181.5MVA, 132,33,11KV Grid Station Bari Brahmana I.
Supply and delivery of Outdoor type 22/0.433KV, 200KVA , Energy efficiency Level-II Distribution Transformer with ISI Mark and BIS certification in Puducherry under R-APDRP Part-B.
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7011413 Dated : 18-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 3098000 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 61960 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 26 (a). 2/11 EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/AGC DRM office office campus Near Agra Cantt Station, Agra-282001 (Sr. Dfm/agc)
Power Transformer Augmentation related work along with other associated Electrical Work at different 33 KV Sub Station under DDUGJY Scheme under Bankura Region in the District of Bankura
For Partial Repairing Cork Sheet Change Stud Changing ,Oil filtration etc. for 03 nos.(a)750KVA 6.6KV/440V Sl.No.35281(b)500KVA,6.6KV/550V Asst.No.KNC/JS/TR 1(C )315KVA,6.6KV/440V Sl.No.5790C) Power Transformer at Substation under Kankanee Colliery
supply and delivery, dismantling of existing transformers at site, erection, testing and commissioning of new transformer at site including all civil works as required, and Supervision of installation and commissioning of the 16 MVA with OCTC Power
Replacement of Existing transformer, SITC of 500KVA Distribution Transformer with OLTC and PF panel (Q3)
Supply, Erection, Commissioning and Testing of 2000 KVA, 11000V/440V Distribution Transformer Outdoor Type, filled with fresh transformer oil, complete with all fitting, accessories and mandatory spare parts for CEMD, OTPS, Obra
Augmentation of existing outlived transformer including cabling, distribution feeder pillar at substation of BSF campus Gandhinagar FTR HQ BSF Gujarat SH SITC of 630 KVA 11/0.433 KV Oil Cooled Distribution Transformer
60 kVA transformer 750 / 415V, 3 Phase dry type distribution transformer confirming to RDSO Specification No. RDSO / PE / SPEC / AC / 0080 - 2007 (Rev.2) suitable for LHB type AC Coaches. Firm's offer
5KVA Transformer, 415V/190V AC, 3phase, Type III, Dry type distribution Transformer without filter, confirming to ICF Specn. No. ICF/ELEC/906 Rev.01 or latest. suitable for LHB AC coaches.MAKE/BRAND-
5 KVA, 415/190 Volt, 3 Phase Dry Type Distribution Transformer as Per EDTS 366, Rev. Nil, Corr - 2.suitable for LHB Type Coaches, Make: Bhasin Packard / Vimal Transformer / P.D.Steel / Electrowave, or
9KVA, 750V/415V/190V, 3-PHASE DRY TYPE DISTRIBUTION TRANSFORMER, as per Drawing: RDSO/PE/SPEC/TL/0158-2010 REV.1 (TYPE-1), Packing Instruction: ALTERNATOR,RRU, ERRU &ACCESSORIES, TRANSFORMER,BULK INVE
500 KVA, 33/0.416 KV, 3- Phase, 50 Cycles, ONAN cooled, Delta/Star, (Dyn 11 Group), Outdoor Type, Copper Wound Distribution Transformer with first fill of Transformer Oil and standard fittings confirm
PC-1407 Manufacture, Testing, Supply and Commissioning of Distribution Transformer Test Benches as per tender Technical Specification and to provide training to the staff of concerned Divisions in GESCOM to use the Test Benches