Loading…
Loading…
3,316 results • Best match
C24M26R106 8720620463 Transformer Oil IS: 335/1972
Single phase Transformer 230V/12-0-12V
TRANSFORMER OIL CONFORMING TO SPECIFICATION IEC-60296
Set of Quick Coupling for main transformer
Transformer Oil as per IS 335 (Q4)
HIGH VACUUM TRANSFORMER OIL FILTER MACHINE (Q3)
Custom Bid for Services - TRANSFORMER OIL TESTING
Coil Winding and assembling of 31.5 MVA 66/11 KV Power Transformers at Perungudi Works (Q3), Coil Winding and assembling of 20 MVA 110/33-11 KV Power Transformers at Perungudi Works (Q3), Coil Winding and assembling of 10 MVA 110/11 KV Power ... Power Transformers at ...
Dismantling Pulling of 100MVA Transformer Erection
SUPPLY AND ERECTION OF 109 Nos. OF 16 MVA, 110 KV CLASS POWER TRANSFORMERS
Supply and erection of 15 No. 25 MVA, 110/33-22 KV Power Transformers
ICHP- Removal of carbon dust deposition in lighting equipments, maintaining of lighting transformers etc.,
Replacement of LT and HT Bushings in Voltamp Transformers 2.5 MVA 11KV at Energy
Custom Bid for Services - REPLACEMENT OF 33 KV CURRENT AND POTENTIAL TRANSFORMERS IN MRSS
LT Current Transformer (Protection CT), VA: 5, Voltage Class: 1.1KV
ONLINE UPS WITH ISOLATION TRANSFORMER, SERVO STABILIZER AND STATIC SWITCH
CONTROL TRANSFORMER 415/230V, 200VA USED IN ELGI MAKE COMPRESSOR PANEL. ELGI PART NO: 008937054, CONTROL TRANSFORMER 415/24V, 100VA USED IN ELGI MAKE COMPRESSOR PANEL. ELGI PART NO: 008937050
Dismantling, pulling of failed 1No.100 MVA, 230-110KV, IMP TFR from plinth to safer place at S.P. Koil 230KVSS and Dismantling, loading and transportation of 1No. Healthy 100MVA,230-110KV TandR TFR from Guindy 230KV SS and erection at SPKoil 230KVSS
SUPPLY OF INSULATING OIL FOR TRANSFORMER AND SWITCH GEAR
HIGH VOLTAGE TRANSFORMER BUSHING 35 KV, 600A SUITABLE FOR 25KV 3 PHASE LOCOMOTIVE TRANSFORMER FOR WAG-9/WAP-7 LOCO
High Voltage Rectifier Transformer 70 KVA, DC 70KV Peak, 1000 mA MEAN (Equivalent to BHEL make 75 KVA HVR Transformer)
2A rating, Single phase variable Auto Transformer (VARIAC). Accepted as per tender descrption and Make: NMC 2A AUTO TRANSFORMER PORTABLE.
TRANSFORMER HALF BRIDGE RESONANCE FOR POWER SUPPLY PCB OF MIGATRONICS WELDING SET, Transformer Half Bridge Resonance, Migatronics Part No.16160122
TTPS ES- EM II External cleaning and attending minor maintenance Works in Electrical equipments such as Power Transformers Rectifier Transformers electronic control panels LT Switchgear panel cable trays etc in ESP I II III
Earthing, cable laying and termination etc., towards commissioning of allotted 3rd 16 MVA Power Transformer in existing Veerapandy 110/22 KV substation.
Reclamation of used and un serviceable Transformer oil
Service provider for assembling of 10 MVA 110/11 KV Power transformers at Perungudi works (Q3), Service provider for assembling of 31.5 MVA 66/11 KV Power transformers at Perungudi works (Q3)
FILTERING AND TESTING OF OIL IN TRANSFORMERS AT ENERGY AREA IN TNPL UNIT - II TRICHY
FILTERING AND TESTING OF OIL IN TRANSFORMERS AT BOARD MACHINE IN TNPL UNIT - II, TRICHY.
50KVA 415/415V TRANSFORMER PANEL FOR NEUTRAL FORMATION, 10KVA 415/415V TRANSFORMER PANEL FOR NEUTRAL FORMATION, MANUAL CHANGEOVER SWITCH PANEL
Repair and Overhauling Service - REPAIR OF CONTROL TRANSFORMER AGAINST 43; REPAIR OF CONTROL TRANSFORMER AGAINST 43; No; Buyer Premises, Service Provider Premises
FILTERING AND TESTING OF OIL IN TRANSFORMERS AT ENERGY AREA IN TNPL UNIT - II
Service provider for assembling of 31.5 MVA 66/11 KV Power Transformers as per scope of work, Service provider for assembling of 20 MVA 110/11 KV Power Transformers as per scope of work, Service provider for assembling of 20 MVA 66/11 KV Power ... Power Transformers as ... Power Transformers as ...
External cleaning of electrical equipments such as Power Transformers Rectifier Transformers Electronic control panels LT Switchgear panel cable trays etc in ESP I II and III from the date of commencement of work upto 31.03.2022
Annual overhauling maintenance works in Generator 24 KV isolated busducts 6.6 KV busducts Generator Transformers R Y B phases Unit Auxiliary Transformers A and B during Unit IV Annual overhaul for the year 2021 2022
(i) Providing 2000kVA, 11kV /433V Distribution Transformers at MSB, ESB and BSB Substation for power supply to district cooling new chillers and equipment (ii) Shifting and re-erection of existing distribution transformers and substation equipment
TTPS ES EM I Replacement of oil by new transformer oil and hot oil circulation and its allied works due to the poor characteristics of transformer oil in Station Transformer II at Switchyard I
Procurement of 2000Nos. of 63KVA/11KV/433V Energy Efficient Level-2 Distribution Transformers
Indoor resin cast current transformer 15 VA, 50/1A
SUPPLY OF 16/20 MVA (110/33-11KV) POWER TRANSFORMERS AS PER OUR SPECIFICATION (Q3)
Supply and erection of 16 MVA, 33/11 KV Indoor Cable Box Type Power Transformers
SUPPLY AND ERECTION OF 10MVA, 110KV CLASS POWER TRANSFORMERS OPEN TENDER UNDER RATE CONTRACT SYSTEM
Biennial Maintenance Contract for HT LT Transformers Busducts and Rectiformers in Main plant and Offsites
establishment of 33/11 KV out door SS with 2x8 MVA power transformers at Vilagam
SUPPLY SUPER ENAMELED COPPER WIRE VARIOUS SIZE FOR SPECIAL MAINTENANCE FAILED DISTRIBUTION TRANSFORMERS REPAIR WORKS