Loading…
Loading…
3,920 results • Best match
NCTPS I ES Circle EM II Dn Sub Dn III PHL Carrying out Time bound maintenance works of lighting in Power House area comprising of Station Service buildings Cable Gallery TG floor of all three units Switchyard and Transformer yard for a perio
SET OF RUBBER BUSH (1) FOR A-34 BUSHING AS PER DRG.NO.ELW/BSL/WAM- 4/4/113.024QTY- 01 NO. (2) OIL SEAL FOR TRANSFORMER BUSHING(A3,A4,A5,A6) AS PER DRG.NO. ELW/BSL/WAM-4/4/F-91.019 QTY-04 NOS.
Providing view cutter to EB transformer at vadivel main street junction of chinaya new colony 1st main road, vadivel main street junction of BB road, chinaya colony 1st street, chinaya colony 2nd street,various street in Division-71 Unit-17 Zone-6
Addition/Alteration and Special repair to transformer and provision of LT Panel at ICGS Mandapam and Provision of street lights and garden lights and Special repair to street light poles and solar light poles at ICGS Mandapam Under GE(I) CG Chennai
Provision of one no. diesel/petrol driven Van/Jeep/Car on hire basis for the official use of Executive Engineer/Transformer Erection/GCC I of Superintending Engineer/GCC-1/Chennai Circle for a period of one year from the date of utilization
NCTPS I ES Circle EM II Dn SD III PHL Carrying out Time bound maintenance works of lighting in Power House area comprising of Station Service buildings Cable Gallery TG floor of all the three Units Switchyard and Transformer yard for a period
TTPS MechII AHP Attending breakdown maintenance works in Unit I II III Heat exchanger discharge pipe line Tunnel pipe line from transformer yard to stage I II ash water sump and High pressure pipe line fittings for the period from 01 04 2026
NCTPS I ES Circle EM II Division S Dn III PHL Carrying out Time bound maintenance works of lighting in Power House area comprising of Station Service buildings Cables Gallery TG floor of all the three Units Switchyard and Transformer yard for
TTPS ES EM III Fabrication and erection of A Type MS Welding distribution box B Type Lighting supply distribution box and replacing the existing damaged pillar box by spare pillar box base structure near Ash silo Transformer in Unit IV and V area
Sp.38 NCTPS II ES circle EM I Division SD II Annual overhauling works on 11KV 3 3KV 415V Switchgears panels 11KV 3.3KV SPBD Bus duct GCB Dry type transformer of Unit II during the overhaul program for the year 2024-25.
TTPS ES Circle EM I Rewinding of 0 40 kW 3 Phase 415V LT Exhaust Fan Motor released from 6 6kV SWGR control room and rewinding of failed Control transformer 415V 110V released from various LT Modules of Unit I II and III
Oil Cooler radiator 165 KW for main transformer 5400 KVA for WAG-7 locomotive to CLW Specn. No. CLW/ES/0-4 Alt-E, CLW Drg. No. CLW/ES/SK- 1/0-4/E. Firm's offer: Same as above. Make/Brand: SELF.
SET OF "O" RING FOR FLOWWELL MAKE TRANSFORMER OIL PUMP MOTOR (MPH), MODEL NO: 1143L (MPH) SET CONSISTS OF 03 ITEMS 1. O RING SIZE ID 195MM X 5MM DIA - 01 NO./SET 2. O RING SIZE ID 38MM X 3MM DIA - 01
SET OF "O" RING FOR FLOWWELL MAKE TRANSFORMER OIL PUMP (MPH), MODEL NO: 1143L (MPH) SET CONSISTS OF 03 ITEMS AS GIVEN BELOW: 1. O RING SIZE ID 195MM X 5MM DIA - 01 NO./SET 2. O RING SIZE ID 38MM X 3MM
200 VA, 750/415 V AC, 50 HZ, 1 PHASE, DRY TYPE AND AIR-COOLED CONTROL TRANSFORMER FOR THE SBC OF LHB POWER CAR/LHB AC COACH/LSRD COACHES, AS PER RDSO SPECIFICATON NO. RDSO/PE/SPEC/AC/0203-2020(REV-0).
Set Of O Ring And Sealing Ring For transformer Oil Pump Motor Type 1530 Consist Of : 1) O Rings Item No-1 = 01 No /set 2) Sealing Rings Item No 2 = 02 Nos/set 3) Sealing Rings Item No 3 = 02 Nos/s
Oil Cooler radiator 165 KW for main transformer 5400 KVA for WAG-7 locomotive to CLW Specn. No. CLW/ES/0-4 Alt-E, CLW Drg. No. CLW/ES/SK-1/0-4/E. Note:- Supply by sources from IREPS Vendor Directory ,
11kV HT VCB PANEL SPARES FOR THE FOLLOWING ITEM OF AREVA BRAND SCHNEIDER MAKE OF 1) CURRENT TRANSFORMER 150-75/5+5, CORE 1: CL: 0.5,VA15, CORE 2: CL: 15 VA, CL-5P10, 1L.12/8kV,RMS, IL:75kV(PEAK FREQUE
250 VA, 750/415 V AC, 3 PHASE, 3 WIRE STAR/STAR VOLTAGE MEASURING TRANSFORMER FOR LHB AC POWER CAR, TYPE-VIII, AS PER RDSO SPECIFICATION NO: RDSO/PE/SPEC/AC/0203-2020 (REV-0).AS PER RDSO OR RCF EDTS 1
SET OF RUBBER BUSH (1) FOR A-34 BUSHING AS PER DRG.NO.ELW/BSL/WAM- 4/4/113.024QTY- 01 NO. (2) OIL SEAL FOR TRANSFORMER BUSHING(A3,A4,A5,A6) AS PER DRG.NO. ELW/BSL/WAM-4/4/F-91.019 QTY-04 NOS.
OIL PUMP COMPLETE WITH MOTOR FOR TRANSFORMER (WOUND WITH CORONA RESISTANCE WIRE) AS PER CLW SPEC.NO. CLW/ES/3/0106 ALT-F OR LATEST AND RDSO SPECIFICATION No. RDSO/SPEC/E- 10/03/09 (MOTOR) WITH AMENDMENT NOS 01 TO 06 OR LATEST.
SET OF RUBBER BUSH (1) FOR A-34 BUSHING AS PER DRG.NO.ELW/BSL/WAM- 4/4/113.024QTY- 01 NO. (2) OIL SEAL FOR TRANSFORMER BUSHING(A3,A4,A5,A6) AS PER DRG.NO. ELW/BSL/WAM-4/4/F-91.019 QTY-04 NOS.
NCTPS 1 EM II Dn SD III PHL Carrying out Routine maintenance works of lighting in Power House area comprising of Station Service buildings Cable Gallery TG floor of all the three Units Switchyard and Transformer yard for a period of 360
Balance works - Providing RCC drain cover slab in transformer yard, COT, DOT inside and outside painting, providing M.S door plinth protection in DG building,transformer maintenance build
MTPS-I ES Circle EM-II SD-III- Cleaning of HVR Transformers, support insulators and rapping motors at ESP roof top of Unit-I to IV and scrapping painting of Unit III HVR transformers during the respective Unit AOH COH for the year 2026 2027
Virudachalam - Tholudur road-Sub work- Shifting of EB Poles and Transformers from Km 10/0 - 14/210 -VPM-001
MTPS II CHP I Routine Preventive Maintenance works in Wagon Tippler MCC LT Transformers all the electrical equipment etc
MTPS-I-ES-EM-I-Unit- II -Transformer oil circulation in the 250MVA, Generator Transformer -2 due to increasing of hydrogen gas values during AOH 2018 ( Short tender)
SC050480093, TRANSFORMER - 50KVA, 11KV/230V, 3 PHASE Qty: 3 Nos. (Q3)
TRANSFORMER REWINDING INSULATION LABOUR CHARGES AND BUY BACK OLD COPPER LT
SC050520019: 3.3KV/433V, 3 Phase, 30KVA, Transformer, QTY: 7 Nos (Q3)
Air Conditioner, automatic line voltage corrector or step type auto transformer
Air Conditioner, automatic line voltage corrector or step type auto transformer
Servicing of 500 KVA, 11KV/433V Transformer as per enclosed specification
supply of 11KV Single Pole Transformer Centre Set to KVMDI division
Transformer Structure Clamp Suitable for 9 mtr 300 Kgs PSC Pole
Main PCB Part No- PCB - MAIN -ED- 2012-06-01-IA by IT, VRD Control PCB Part No- PCB - VRD -ED-2013-13-00-INVAARC- 400T, Protection PCB Part No- PCB - SINGLE PHASE-IA4T-ED- 2014-25-R1, Current Transformer Part No- CURRENT TRANSFORMER- 22x38x10M430, DC ... CURRENT TRANSFORMER - ... Control Transformer Part ... CONTROL TRANSFORMER - ...
Set of Nitrile bonded cork Gasket for 3 [Set of Nitrile bonded cork Gasket for 3 Phase loco main transformer. One Set consisting of 23 items as per annexure enclosed. Material should be as per RDSO T.C.No. ELRS/TC/0076, Rev.2, dt.01.10.2019.
El.D.C.No.South/532/2021 Supply and Erection of 4 Nos of 6mtr Street Lamp post with Single Arch bracket with hot dip GI and Construction of retaining brick wall and foundation of RMG VCB Transformer to the Floor level in perungudi dumping gnd in Z 14
TTPS Mech II AHP Attending breakdown maintenance works in Unit I II III Heat exchanger discharge pipe line Tunnel pipe line from transformer yard to stage I II ash water sump and High pressure pipe line fittings for the period from 01 04 2025 to
Providing View cutter for TNEB Transformer enclosure at Kumaran nagar main road,Kumaran nagar 3rd cross st,United colony main road,Nermai nagar main road,Balaji nagar 1st cross st and Balaji nagar main road in Division-66,Unit-15A, Zone-6(NNT Scheme)
TTPS Mech II AHP Attending breakdown maintenance works in Unit I II III Heat exchanger discharge pipe line Tunnel pipe line from transformer yard to stage I II ash water sump and High pressure pipe line fittings from the date of commencement of wor
Procurement of set Glass Part of Transformer Oil Gas Extraction Apparatus with glass fitting connecting tubing suitable fixtures, graduated and necessary silicon tubing for DGA machine as per drawing mention as per RDSO/SMI/138 and IS 9434: 1992 and details as per annexure attached.
NCTPS I ES Circle EM I Division S Dn I Erection commissioning of new Aircell bag in Conservator tank of 250 MVA Generator Transformer I and Hot oil circulation of UAT 1A 1B during Unit I Annual Capital Overhauling period for the year 2023
Procurement of i) 500 VA, 230 V/24 V AC transformer with enclosure and inbuilt of 1 No 64 A MCB, 1 No 20 A fuse link and terminals, (ii) 12 module metal surface box with 4 Nos 6A modular switch 4 Nos 6A socket
TPS Mech II AHP Attending breakdown maintenance works in Unit I II III Heat exchanger discharge pipe line Tunnel Pipe line from transformer yard to stage I and II ash water sump and High Pressure Pipe line fittings for the period of work on o
TTPS ES Circle EM II Cleaning with emery sheet on Rusted area and soap Water Washing the external body of HVR Transformer Duct and Field Disconnecting Switch box with two coats of painting with Enamel smoke Gray Aluminium color paint in ESP I duri
TTPS Operation Circle Revenue work OE II FPS Scrapping, Cleaning and painting of one coat of red oxide primer and two coats of P.O.Red Blue enamel paint in Mulsifyre pipelines of various sizes at Unit II GT 3 phase transformer and UAT 2A and 2B