Loading…
Loading…
12,220 results • Best match
QUANTUM OF WORKS INVOLVED FOR MINOR MAINTENANCE OF POWER TRANSFORMER UNDER THE AREA OF EDSD-Ist UNDER EDD-Ist, UNNAO.
Removal of leakage of oil in the power Transformer 10 MVA installed at 33 avam 11 KV sub station Laplas
QUANTUM OF WORKS INVOLVED FOR MINOR MAINTENANCE OF POWER TRANSFORMER UNDER THE AREA OF EDSD-II UNDER EDD-I, UNNAO.
Replacement of Bushing rod, Gasket etc of 05 MVA Power transformer installed at sub station Dilari under EDD-3 Moradabad.
Work for Installation 60 Nos. GI Pipe 80 feet deep bore of power transformer in different Sub station under KESCO.
FOR OVERHAULING OF DIVERTER SWITCH INSTALLED IN OLTC OF POWER TRANSFORMER AT DIFFERENT PRIMARY SUB STATION UNDER ETC GREATER NOIDA
FOR ATTENDING AND WORK of 33/11 KV Power Transformer installed at various 33/11 KV Substation UNDER ETD BALLIA
Work for Earthing of 10 MVA Power Transformer Installed at 33/11 KV S/s Murain Tola in EDD Fatehpur
For the Work of Testing of Power Transformer BDB and DGA at 33/11 KV Sub-Station Under EUDC, Meerut.
NECESSARY CIVIL WORK FOR THE ESTABLISHMENT OF AN ADDITIONAL POWER TRANSFORMER AT 33/11 K.V. S/S BENIABAGH, DISTT-VARANASI.
Custom Bid for Services - Storage all risk Insurance for Power Transformer 160 MVA Similar Category Marine and Transit Insurance Service
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6655975 Dated : 08-09-2025 Bid Document 1/11 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
33/0.4 KV, 630 KVA, 1 Star Rating Level-1 (Previously Level-2) Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified
Increasing capacity of 10 Nos. 11/0.4KV Distribution Transformer under the area of UEDC-I, Varanasi under Additional Business Plan 2022-23
Capacity Enhancement of distribution transformer under additional business plan 2024-25 in the area of edd i bhadohi and edd ii gopiganj
work of Preventive/Breakdown maintenance of Distribution Transformer, Switch Gear and other related works inside Plant and various Colonies of PTEP, Panki
Capacity Enhancement of overloaded distribution transformer in the area of edd i bhadohi and edd ii gopiganj under business plan 2024-25
The work of capacity enhancing of Distribution Transformer and making double pole structure and also making plinth under Bussiness Plan- 2022-23
Increasing Capacity of Distribution Transformer against Business Plan 2022-23 under jurisdiction of EDD, CESS-II and IV, Cis Gomti Lesa, Lucknow.
Repairing of 10/16 KVA SP Alu. to 1000 KVA TP Cu. Wound Damaged Distribution Transformer at workshop Etawah under EWD, Kanpur
11/0.4 KV Distribution Transformer Increasing Capacity, 11 KV Line Construction and Bifurcation Work and Strengthening Work of 33 KV Line Work
Quantum of works involved for minor maintenance and replacement of old and damaged Gaskets from top cover, Bushing, Radiators and other of 05 MVA power transformer No.-2 at 33/11 KV S/S Industrial Area and 05 MVA Power Transformer No.-2 at 33/11 KV
5KVA, 415/190 Volt, 3 Phase Dry Type Distribution Transformer as Per EDTS 366, Rev. Nil, Cor-1 or Latest. Make: Bhasin Packard/Vimal Transformer/P.D.Steel/Electrowaves. Make/Brand:- VIMAL
Installation, testing, commissioning of safety device of power transformer 5MVA, 33kV/6.6kV of Kakri Project. (For detailed description please refer to scope of work section of NIT document).
The Carriage of New/Repaired Medium power Transformer from Store to site and Carriage Damaged/burnt Transformer from Site to Store in juridiction of EE EDD I bhadohi.
Supply of Power Transformer 5MVA,132/6.9KV, 3 Phase, 50Hz (with all fittings and accessories) including installation, erection, commissioning, testing and charging work at ATPS, Obra Transformer yard.
REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE FOR 33BY11 KV SUBSTATION JYOTI ROAD, POWER HOUSE AND SHAMSHANGHAT FOR VARIOUS POWER TRANSFORMER UNDER EDD I, MAINPURI
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7103980 Dated : 12-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 36000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Executive Officer NAGAR PANCHAYAT BILRAM KASGANJ, Urban Development Department Uttar Pradesh, e-Municipalities - eServices to citizens and Employees of Urban Local Bodies of Uttar Pradesh, (Executive Officer)
STOPPING OIL LEAKAGE FROM 10 MVA POWER TRANSFORMER INSTALLED AT MEDICAL ROAD SUB-STATION IN THE AREA OF EUDD-4 ALIGARH
Work of replacement of cork sheet, gasket etc of 05 MVA power transformer installed at Rasoolpur substation under EDD-2 Moradabad.
Work of replacement of bushing rod, gasket etc of 05 MVA power transformer installed at Dilari substation under EDD-3 Moradabad.
Work of replacement of cork sheet, gasket etc of 10 MVA power transformer installed at Dalpatpur substation under EDD-2 Moradabad.
FOR THE EMERGENCY WORK OF REPLACEMENT TRANSPORTATION ETC OF 132 KV AND 220 KV POWER TRANSFORMER UNDER TRANSMISSION WEST ZONE MEERUT
One Site Shifting, Opening Work, Weighment and Re-sealing with videography of 06 Nos. 15 MVA Power Transformer under ESD, LESA.
Work of repairing the damaged material of 05 MVA power transformer installed at 33 11 KV substation Sikri and Alawalpur Mazra
BODY EARTHING AND NUTRAL EARTHING WORK OF POWER TRANSFORMER AT DIFFERENT SUB STATION IN EDSD Ist SHIKARPUR UNDER EDD III BULANDSHAHR.
Work of earthing of power transformer/VCB at 33/11 KV S/S Anoopshahar Road and C.D.F. under EDD-III, Aligarh
Works of repair, maintenance and other associated work of existing 5 MVA power transformer at Sub Sation Bukhara under EDD Bijnor.
BODY EARTHING AND NUTRAL EARTHING WORK OF POWER TRANSFORMER AT DIFFERENT SUB STATION IN EDSD 2nd SHIKARPUR UNDER EDD III BULANDSHAHR.
REPAIR OF POWER TRANSFORMER INCLUDING ALLIED WORKS AT BHAGAT LINE AREA UNDER AGE E/M (ES) AT GE (U) MEERUT CANTT
Installation of Additional 5 MVA Power Transformer at Substation Jaiguru Dev, Pachehra and Khayra in District Mathura on semi Turnkey basis.
Custom Bid for Services - all risk Insurance for Power Transformer of M/s APTRANSCO Similar Category Marine and Transit Insurance Service
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Banda
Earthing Work of 25, 63 and 100 KVA distribution transformer in EDD-I, II, Saidpur and Zamania, Ghazipur under MD Sir discretionary item
Replacement of damaged Distribution Transformer of different capacity against O and M scheme 2024-25 under jurisdiction of E.E, E.U.D.D-Vrindavan, LESA, Lucknow
the work of setting up additional distribution transformer of various capacity under EDD-Ist and IInd Bijnor and Chandpur in BP 2024-25
Replacement of healthy T F instead of damage small Capacity Distribution Transformer (10 KVA to 100 KVA) Under Electricity Distribution Division-Sandila, Hardoi.
For Installation of Modem Meter on 55 Nos Distribution Transformer of R-APDRP Town in EE, Test Division UNDER EDC , BARABANKI , MVVNL, BARABANKI
QUANTUM OF WORKS INVOLVED FOR PROVIDING BORE TYPE EARTHING AT DISTRIBUTION TRANSFORMER UNDER THE AREA OF EDSD PURWA-MAURAWA, UNDER EDD-PURWA, UNNAO.
Installation of 250 KVA Distribution Transformer and related lines in the area of EUDD Hanspuram and Daheli Sujanpur under EUDC-III, KESCo Kanpur