Loading…
Loading…
15,083 results • Best match
Erection of 40 MVA Transformer at 132KV Sub-Station Harraiya under Electricity Transmission Division-I, Basti
Repair and Maintenance of 11/0.4 kV, 400 KVA and 250 KVA Transformer at MMMUT, Gorakhpur
CC SADAK NIRMAAN KARYA SHREEVASTWA KE MAKAAN SE TRANSFORMER TAK WARD NO 07 RAM WATIKA COLONEY
Providing and fixing of cooling fan for 40 MVA Transformer at 132 KV Substation, Bodla,Agra
For Repairing of 10/16 KVA to 1000 KVA Transformer at Workshop Lalitpur under EWD, Jhansi
The work for Work for carriage of old and damage transformer form site to Workshop Centre
Construction of CC flooring from transformer to Idgah Mosque in Zone-3 Room No. 39, Nagner.
HT cable laying inside FGK for GS-I ET-3 and Admin. Block F-T Transformer
For Repairing of 10/16 KVA to 1000 KVA Transformer at Workshop Mathura under EWD, Agra
Name of Work 38 - Construction of Drain from Transformer to Pond in Village- Uncha, Block-Shamsabad
Interlocking work from Anjuman Talab to Transformer in Ward No-23/17/22 Mohd-Topkhana/Mriyasitola
THE WORK OF DAMAGE TRANSFORMER AND SAFE CARRIAGE UNDER EDD II EDD SHAHGANJ AND MACHHALISHAHAR JNP
Gram sabha suryapura mein vidhva prathmik pathshala se Surya pura gaon transformer ke aage Tak cc
Block-Brahmpur Gram Panchayat Dihghat mein Transformer se Dindyal ke Ghar Tak CC Road Ka Nirman
Construction of R.C.C. Nala from Deepak Genrel Store To Transformer In Khadepur ward -21 zone -3
For Repairing of 10/16 KVA to 400 KVA Transformer at Workshop Etah under EWD, Aligarh
Ward-72 Vaishali S0-01 Repair work of damaged road from Thursday to Transformer by Danes.
Construction of C.C. Road From Vijay Bhargava ji House to Near Transformer in Khanwakhera, Block- Khairabad
W/S of Siddiqpur jamuhai marg hetu kairage wey padane wale Electric pole, Transformer Shiffting work
Repairing of 100 to 630 KVA Damaged Transformer at newly workshop Orai (Jalaun) under EWD, Jhansi
Construction of open shed for painting of transformer tanks at Balrampur workshop and other civil works.
Gramsabha devrar pipra main sheshnath tiwari ke ghar se transformer tak CC Road ka nirmad karya.
Ward 1 Bank Colony Transformer se Gajendra Chauhan ke ghar tak Interlocking Road and Naali Nirman
Shifting of Highmast Transformer and Providing pole at U turn on DSC road sector-15, Noida
PROVN OF 1500 KVA TRANSFORMER FOR 33 KV AT 24 ED UNDER AGE (I) AF MANAURI
SPECIAL REPAIR / REPLACEMENT AGAINST BER TRANSFORMER 11 KV / 433 V AND CONNECTD ACCESSORIES AT AGRA CANTT
For Repairing of 10/16 KVA to 400 KVA Transformer at Workshop Hamirpur under EWD, Banda
Repairing of 10 and 16 KVA Cell type Damaged Transformer at Naini Workshop Under EWD Prayagraj
For Repairing of 10/16 KVA to 1000 KVA Transformer at Workshop Shikohabad under EWD, Agra
Repair work of transformer/pole/wire damaged due to storm, strong winds under EDD-Saidpur, Ghazipur
WORK OF CAPACITY INCREASING OF TRANSFORMER AND REPLACEMENT OF G.I. WIRE ETC. UNDER EDD 2 MORADABAD
WARD 4 MALIYAN KE TRANSFORMER SE BHATWADE KI PULIYA TAK RCC RETAINING WALL KA NIRMAN KARYA
Repair work of transformer/pole/wire damaged due to storm, strong winds under EDD-Zamania, Ghazipur
Work of construction of drain and interlocking from transformer to Shamsuddin house in Ward Bhitari Pirbatavan.
work provide electric connection in various places and Increasing capacity of transformer under EDD-Mahmoodabad, Sitapur
Repairing of HT/LT Transformer 400 KVA at New parikalp Vihar Colony, Telibagh, Lucknow (Lot-31)
Sehmau me Tikanapur mod par transformer ke pas me semi LED high mast light ki sthapana.
Centrifuging of Transformer No. 1 and 2 oil and repairing at 80 MLD STP, Dinapur, Varanasi
Stoppage of oil leakage from 132KV 40 MVA transformer-II at 132 KV Sub station Sandila
Work For Preventive Maintenance of 250/400 KVA Transformer installed in area of EDD-III, Fatehpur
Dismantling and shifting (63 40) MVA Transformer at 220 KV Substation Atrauli under ETD I Aligarh
Work of expansion of pipeline from community toilet to transformer in Ward No. 8 Hussain Nagar.
High Voltage HRC fuse (Non indicating type) for use in PT / VT and auxiliary transformer system
automatic line voltage corrector or step type auto transformer Experience with Government Required 4 Year (s)
automatic line voltage corrector or step type auto transformer Experience with Government Required 10 Year (s)
SOLENOID OPERATED INTERLOCK FOR DRY TYPE TRANSFORMER AS PER DRG. 34736250471 REV-00 VAR-00 (Q3) ()
CARRIAGE OF DAMAGE TRANSFORMER FROM SITE TO BULANDSHAHR AND BULANDSHAHR TO SITE UNDER EDD-IV BULANDSHAHR.
work of addtional transformer and construction of new HT Line in Dumariyaganj under bp 2024-25
Repairing and Overhauling of 5 MVA Transformer installed at Kaiserganj Sub Station under EDD-3 Kaiserganj
COMPLETE REPARING OVERHAULING STOPPAGE LEAKAGE OF POER TRANSFORMER IN AT 33KV Ss UNDER EUDD 7 NOIDA