Loading…
Loading…
15,100 results • Best match
PROVIDING GPS ENABLED VEHICLE FOR REPLACEMENT OF DAMAGED TRANSFORMERS IN WHOLE AREA OF EUDD-CESS-I, CESS-II, CESS-III AND CESS-IV, LESA UNDER CTR-ALIGANJ/TALKAORA, LESA, LUCKNOW
Stripping of uneconomical distribution transformers having capacity of 10 kVA to 1000 kVA and lying at various workshops Aliganj Talkatora within the jurisdiction of LESA Store Division Zone of MVVNL
Business Plan-2025-26, work of increasing the capacity of 100 kVA to 250 kVA and 10/16 to 25 KVA transformers under under Subdivision Charkhari Mahoba (Semi-Turnkey Basis)
For the Work of Business Plane Scheme 2024-25 of Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different Sites Under EUDD-III, Meerut.
For the Work of shifting of Distribution Transformers and Pole under the Full Deposit Scheme at various Crossroads in the Jurisdiction of Electricity Urban Distribution Division-Chandra Nagar/Asafabad, Firozabad.
For the Work of Business Plane Scheme 2024-25 of Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different Sites Under EUDD-II, Meerut.
For Repairing of L.T. panels, cleaning for panels, cleaning of transformers and poles, resagging of loose wire and removal of unwanted pole support under Urban Electric Distribution Division-II, Varanasi.
Work of cleaning of transformers, Sagging of dilapidated wires and pruning of tree branches up to Harhua, Sato Mahua and Panchkoshi road in the Jurisdiction of EE,EDD I,VNS.
Quantum of works involved for providing bore type earthing at Distribution Transformers different places in the Town AND Rural Area of EDSD-II, Nawabganj, Unnao under EDD-V, Hasanganj, Unnao
Under the Electricity Distribution Division Mehdawal, under the Deposit Scheme 2025-26, work of shifting LT/HT/Distribution Transformers passing over the primary operated at a total of 35 places.
Under the Electricity Distribution Division Khalilabad, under the Deposit Scheme 2025-26, work of shifting LT/HT/Distribution Transformers passing over the primary operated at a total of 54 places.
Work of repair/construction work of 33 kv HT/LT line after their poles, wires and transformers are damaged due to storm Auri in the coming year under All Divisions
Quantum of works involved for providing boaring type earthing at distribution transformers under the area of 33/11 KV S/S Kabba Khera and Kashi Ram Under EDD-I, Unnao.
Work of installation of additional transformers (as per attached list) in 39 villages/localities under Executive Engineer Electricity Distribution Division, Khalilabad on semi-turnkey basis (under 20 crore work plan)
Work for Shifting of 11 KV, LT lines and Transformers under semi turnkey in road wending of Khuja to Umra via Hardaspur Thone touch road under EDD-III Khaga, Fatehpur
FOR THE WORK OF WIRE MESH FENCING AROUND ON PLINTH OF VARIOUS DISTRIBUTION TRANSFORMERS in the Area of EE, EUDD-III, GZB in the Jurisdiction of SE, EUDC-III Gzb.
Increasing capacity of Distribution Transformers upto 100 KVA and above Capacity on Semi Turnkey basis and related Electrical works in Business Plan Year 2024BY25 Under Electricity Distribution Division-I_II_III Mainpuri
Installation of L.T. ACB on Distribution Transformers of 11 KV Feeders to make tripping free zone to maintain 24x7 Hrs. supply to area consumers under EUDD-Vikas Nagar, Kesco., Kanpur.
Quantum of works involved for providing bore type earthing at Distribution Transformers different places in the Town AND Rural Area of EDSD-I, Hasanganj, Unnao under EDD-V, Hasanganj, Unnao
For the Work of Business Plane Scheme 2024-25 of Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different Sites Under EUDD-IV, Meerut.
REPAIR/MAINT TO TRANSFORMERS, HT/LT OVERHEAD LINES, UG CABLES, HT/LT PANELS, EARTHINGS, AREA LIGHTING AND CONNECTED WORKS AT MIL STN NOWGONG UNDER AGE E/M AT GE JHANSI
REPAIR/MAINTENANCE OF 33 /11 KV HT,SUB STATION INCLUDING CALIBRATION /TESTING 0F 33/11 KV TRANSFORMERS, VCBs, HT SWITCH GEAR AND ALLIED WORKS AT BABINA CANTT UNDER GE BABINA
Installation of protection system on various distribution transformers (250/400/630 KVA) installed under the area of Electricity Distribution Division-Ist (Gauriganj), Distt. Amethi in Business plan year 2024-25
Establishment of 100 KVA, 250 KVA, 400 KVA Transformers at various places in Sujabad Nagar Panchayat under Deposit Scheme in Sujabad under EDD-IInd, Mughalsarai On full turn-key basis.
Business Plan-2025-26, work of increasing the capacity of 100 kVA to 250 kVA and 10/16 to 25 KVA transformers under under EDD-Kulpahar Mahoba (Semi-Turnkey Basis)
For the Work of Business Plane Scheme 2024-25 of Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different Sites Under EUDD-I, Meerut.
For Repairing of L.T. panels, cleaning for panels, cleaning of transformers and poles, resagging of loose wire and removal of unwanted pole support under Urban Electric Distribution Division-IV, Varanasi.
Testing of 11/33 KV Breakers and Power Transformers installed at 33/11 KV S/S in the area of Kanpur Road under jurisdiction of E.E., EUTD-III, LESA, Lucknow
Loading-Carriage-unloading of damaged distribution Transformers from site of its damage up to Store Centre/Repair Workshop by Electrical System in the area of EE, EUDD, Chinhat, LESA, Lucknow
Oil leakage work from power transformers of 33/11 KV power substations- Nayabans (05 MVA), Buklana (05 MVA) and Daulatpur (05.10 MVA) of EDSD-III, Bugrasi under EDD-Syana, Bulandshahr.
For Different Works in the Yard of 33/11 KV Sub-Station Mohkampur for Raising the Height of Plinths of Power Disk Transformers, Under Electricity Urban Distribution Division-V, Meerut.
Testing of 11/33 KV Breakers and Power Transformers installed at 33/11 KV S/S in the area of Kanpur Road under jurisdiction of E.E., EUTD-III, LESA, Lucknow
For Replacement Work of 02 Nos. Damaged 10 MVA Power Transformers from Site in the Area of Electricity Urban Distribution Sub-Division-VII, Under Electricity Urban Distribution Division-IV, Meerut.
Installation of protection system on various distribution transformers (250/400/630 KVA) installed under the area of Electricity Distribution Division-IInd (Amethi), Distt. Amethi in Business plan year 2024-25.
For Repairing of L.T. panels, cleaning for panels, cleaning of transformers and poles, resagging of loose wire and removal of unwanted pole support under Urban Electric Distribution Division-I, Varanasi.
Testing of 33/11 KV Breakers and Power Transformers installed at 33/11 KV S/S in the area of Kanpur Road under jurisdiction of E.E., EUTD-III, LESA, Lucknow
For carrying out the work of earthing of different type of transformers installed in the area of 33 11 KV substation Mainather, Jaitwara, Sahaspur and Garhi under EDD-1 Moradabad
11 K.V. HIGH QUALITY BAKELITE STRIP FUSE SET FOR 25 KVA TO 100 KVA DISTRIBUTION TRANSFORMERS ALONG WITH SUITABLE LUG AND ALL ACCESSORIES REQUIRED FOR FITTING ON HT BUSHING ROD
CWE/AF AMB/SAR-T-66/2025-26 REPAIR MAINT AND SERVICING OF HT UG CABLES TRANSFORMERS VCBS AND OTHER MISC WORKS AT 1 AFSB DEHRADUN UNDER GE AF SARSAWA
Under the Business Plan Year 2024-25 Phase-1 under Electricity Distribution Division, Khalilabad installation of safety equipment on power transformers and replacement of dilapidated underground cables at sub-stations.
Painting of structures and SF-6 breakers, Transformers, CT, PT, VCB breakers and control panels with spray painting installed at various substations at Township and Area office of Dudhichua area.
Work of Increasing Capacity of different Capacity Distribution Transformers and Replacement of damaged weasel conductor to avoid overloading under the Jurisdiction of EUDD -II, Moradabad in Business Plan (2023-24).
Business Plan-2025-26, work of increasing the capacity of 100 kVA to 250 kVA transformers under 33/11 kV power substation Patha under EDD-I MAHOBA (Semi-Turnkey Basis)
PROVIDING GPS ENABLED VEHICLE FOR REPLACEMENT OF DAMAGED TRANSFORMERS (10 KVA to 160 KVA) IN WHOLE AREA OF T/F REPAIR WORKSHOP GONDA, BALRAMPUR, BAHRAICH and SHRAWASTI UNDER EWD-GONDA
Conversion of Overhead power lines to under ground and Transformers with LED lighting In ROW of naini Kharkauni crossing Main Entrence Gate Central Jail nani to Arail Road Naini Prayagraj
CONSTRUCTION OF LT FUSE SET AND FENCING WORK FOR DISTRIBUTION TRANSFORMERS, IN THE AREA OF E.D.S.D.-II, HASANGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2023-24.
REPAIR/MAINT OF 33 KV YARD POWER TRANSFORMERS 33 KV/11 KV BREAKERS AND CONNECTED ITEMS AT OLD MRS AND NEW MRS IN THE AREA UNDER GE E/M LUCKNOW
Utility shifting (Shifting of electric poles, Transformers etc) in The work of widening and strengthening of Karwi Budha Rajapur Road (ODR) in ch. 1.500 to 28.410 of in Chitrakoot district.
Work of capacity augmentation of 11/0.4 KV Distribution Transformers of various capacities under the BP 2026-27, within the jurisdiction of the EDD-Sakaldiha (on Semi Turn-key basis).
Maintenance of 33KV, 11KV Lines and Various Capacity Transformers in the area of 33/11KV Substation Sec-14 (New), Munshipulia, Lucknow under the EE, EUDD-Munshipulia, LESA Trans Gomti, Lucknow