Loading…
Loading…
15,044 results • Best match
The work of neutral and body Earthing of Power Transformer, Earthing of Incoming Pannel and earthing of structure(Isolator) on 33/11 KV S/S Boner of EDD-VI, Aligarh.
Daily routine monitoring, Preventive/ Breakdown maintenance, ESP Transformers, rapping motors and centrifuging of ESP Transformer of 5x200MW, Obra TPS
Repairing of 01 no. 160MVA, 220/132/11KV Auto transformer and 04 nos. 60MVA, 220/33/11KV Power Transformers.
As described in BOQ
REPAIR/MAINT TO VARIOUS POWER TRANSFORMERS DISTRIBUTION TRANSFORMERS RENEWAL OF EARTHING TRANSFORMER YADRD ETC AND CONNECTED WORKS AT JHANSI CANTT, CALEB VIHAR AND AAU UNDER AGE E/M AT GE JHANSI
REPAIR/MAINT TO VARIOUS POWER TRANSFORMERS, DISTRIBUTION TRANSFORMERS, RENEWAL OF EARTHING TRANSFORMER YARD ETC AND CONNECTED WORKS AT JHANSI CANTT, CALEB VIHAR AND AAU UNDER AGE E/M AT GE JHANSI
For Supply of necessary materials to complete the work of 33 KV, 11 KV and LT line, distribution transformer installation/Increasing capacity work in the area of EDSD-Kheragarh under EDD-Kheragarh, Agra.
Quantum of works involved in erection of wire mess fencing on different medium power distribution transformer of 33/11 KV substation Kabba Khera and Kanshi Ram, Unnao under Electricity Distribution Division-I, Unnao.
Work of 11 KV Feeder Bifurcation, Installation of various Distribution Transformer, Damaged ABC cable, 11 KV incoming and outgoing VCB in Business Plan 2023-24 again Semi Turnkey basis under EDD-II, Prayagraj
FOR THE WORK OF- Replacement of 10, 16, 25, 63, 100 and 160 KVA Distribution transformer at IPDS Town and Urban Area UNDER JURISDICTION OF E.E., EDD, CESS-I, CISS GOMTI, LESA, Lucknow
INSTALLING NEW ELECTRICAL POLES IN PLACE OF DAMAGED POLES DISTRIBUTION TRANSFORMER DAMAGED CABLE CONDUCTOR ABC DAMAGED 33BY11 CABLE OUTDOOR AND INDOOR CABLE BOX ETC WORK UNDER SEVERE THUNDERSTORM UNDER THE EDD KARHAL MAINPURI
FOR THE WORK OF -Replacement of 10, 16, 25, 63, 100 and 160 KVA Distribution transformer at IPDS Town and Urban Area UNDER JURISDICTION OF E.E., EDD, CESS-II, CISS GOMTI, LESA, Lucknow
INSTALLING NEW ELECTRICAL POLES IN PLACE OF DAMAGED POLES DISTRIBUTION TRANSFORMER DAMAGED CABLE CONDUCTOR ABC DAMAGED 33BY11 CABLE OUTDOOR AND INDOOR CABLE BOX ETC WORK UNDER SEVERE THUNDERSTORM UNDER THE EDD BHONGOAN MAINPURI
For Supply of necessary materials to complete the work of 33 KV, 11 KV and LT line, distribution transformer installation/Increasing capacity work in the area of EDSD-Jagner under EDD-Kheragarh, Agra.
Work of 11 KV Feeder Bifarcation, Installation of various Distribution Transformer, Damaged ABC cable, 11 KV incoming and outgoing VCB in System strenghting 2023-24 again Semi Turnkey basis under EDD-Handia, Prayagraj.
Quantum of works involved in erection of wire mess fencing at 250/400 KVA distribution transformer installed at different places under the area of EDSD-I III, under Electricity Distribution Division-I, Unnao.
Work of 11 KV Feeder Bifurcation Installation of various Distribution Transformer Damaged ABC cable, 11 KV incoming and outgoing VCB in System strengthning 2023-24 against Semi Turnkey basis under EDD-Phaphamau, PrayagrajPrayagraj.
The strengthening of 11 kv line/LT line and capacity enhancement of distribution transformer of newly border extended area in nagar nikay under deposit scheme 2022-23 in Juridiction of EE EDDI BHADOHI
Quantum of work for replacement of damaged bushing rod, packing and general cheeking of distribution transformer area of EDSD- Patan and Bhagwant Nagar, Unnao under the area of Electricity Distribution Division- Purwa ,Unnao.
INSTALLING NEW ELECTRICAL POLES IN PLACE OF DAMAGED POLES DISTRIBUTION TRANSFORMER DAMAGED CABLE CONDUCTOR ABC DAMAGED 33BY11 CABLE OUTDOOR AND INDOOR CABLE BOX ETC WORK UNDER SEVERE THUNDERSTORM UNDER THE EDD KARHAL MAINPURI
INSTALLING NEW ELECTRICAL POLES IN PLACE OF DAMAGED POLES DISTRIBUTION TRANSFORMER DAMAGED CABLE CONDUCTOR ABC DAMAGED 33BY11 CABLE OUTDOOR AND INDOOR CABLE BOX ETC WORK UNDER SEVERE THUNDERSTORM UNDER THE EDD BHONGOAN MAINPURI
Increasing Capacity of Distribution Transformer against Business Plan 2021-22 (Package No.46, 47, 50, 51, 52, 53 and 54/21-22 under jurisdiction of EDD, CESS-I/II, Cis Gomti Lesa, Lucknow
For Supply of necessary materials to complete the work of 33 KV, 11 KV and LT line, distribution transformer installation/Increasing capacity work in the area of EDSD-Kagarol under EDD-Kheragarh, Agra.
Supply of 11/0.433 KV, 63 KVA 1 Star Rating Previously Level-2 now Level-1 (as per IS 1180) (Part-I) 2014 (Amendment-4) Aluminum Wound Distribution Transformer BIS Certified with ICB
Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 63 KVA, 1 Star Rating Previously Level-2 now Level-1 (as per IS 1180 (Part-I) 2014 (Amendment-4) Aluminum Wound Distribution Transformer BIS Certified with ICB
Supply of 11/0.433 KV, 400 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 400 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 100 KVA, 1 Star Rating Previously Level-2 now Level-1 (as per IS 1180) (Part-I) 2014 (Amendment-4) Aluminum Wound Distribution Transformer BIS Certified with ICB
Supply of 11/0.433 KV, 100 KVA, 1 Star Rating Previously Level-2 now Level-1 (as per IS 1180 (Part-I) 2014 (Amendment-4) Aluminum Wound Distribution Transformer BIS Certified with ICB
Supply of 11/0.433 KV, 400 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features
Supply of 11/0.433 KV, 630 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with LT MCCB
60 kVA, 750 /415 V, 3 phase Dry type distribution transformer complete for LHB type AC EOG coaches as per RDSO Specification No. RDSO/PE/SPEC/AC/0080-2007 (Rev.2). MAKE- VIMAL
60 KVA, 750V/415V, 3-phase dry type distribution Transformer, conf. to RDSO Specification No.RDSO/PE/SPEC/AC/0080-2007(REV 2), suitable for LHB Type Rajdhani/ Shatabdi EOG AC Coaches. (ACCEPTED FIRMS
60 KVA, 750V/415V, THREE PHASE DRY TYPE POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE AC COACHES AS (EOG)/POWER CAR CONFIRMING TO RDSO SPECIFICATION NO: RDSO/PE/SPEC/AC/0080-2007 (Rev.2).
Supply of Distribution Transformer 250 KVA, 3 phase 11 KV ,ISI marked , 4 star rated,Dyn-11, core material: CRGO as per IS :3024 latest, energy efficiency level-2, conductor winding material - copper
9KVA DRY TYPE DISTRIBUTION TRANSFORMER TO RDSO/PE/SPEC/TL/0158 2010(REV.1)(TYPE-1) . ITSHALL BE SUPPLIED WITH NECESSARY ACCESSORIES [ IE., ANTI VIBRATION MOUNTING & APPROVED MAKE LT/HT HRC FUSES.] IC
Supply of 11 KV/415 Volt;500 KVA Delta/Star connected copper wound power distribution transformer outdoor type complete with accessories confirming IS 2026 (Pt-I to Pt.21 as applicable) : 2011(Reaffir
60 kVA, 750 /415 V, 3 phase Dry type distribution transformer complete for LHB type AC EOG coaches as per RDSO Specification No. RDSO/PE/SPEC/AC/0080-2007 (Rev.2). MAKE-VIMAL
For Water level Earthing Neutral and Body of Power T F and Distribution Transformer installed in the area of SDO EUDSD VII Kanker Khera Meerut at different places under EE EUDD IV Meerut
Increasing Capacity of Distribution Transformer
work for earthing distribution transformer
Replacement of damaged distribution transformer.
Complete and Minor overhauling 1.6MVA, 6.6/0.4kV Service transformers (UST-09A, 09B, ESP-09A, 09B, Booster Pump Transformer, Ash handling Transformer-09A) during overhauling of unit 09 BTPS Obra
Complete and Minor overhauling 1.6MVA 6.6/0.4kV Service transformers (UST-12A, 12B, ESP-12A, 12B, Booster Pump Transformer Ash handling Transformer-12A) during overhauling of unit-12 BTPS Obra
For the Works of Maintenance of 33 KV TPMO and 11 KV VCB, Replacement of Damaged Packing of Power Transformer at Partapur, Aman Vihar, Udyogpuram Under EUDD-33 KV Line, Meerut.
Quantum of work involved for maintenance of power transformer at 33/11 KV Sub station Dhani Khera in the area of EDSD-II, Patan under Electricity Distribution Division-III, Purwa, Unnao.