Loading…
Loading…
15,044 results • Best match
INSTALLATION AND INCRASING OF DISTRIBUTION TRANSFORMER
repair damaged plinth for distribution transformer
work for pipe earthing distribution transformer
repairing damaged plinth of distribution transformer
work for pipe earthing distribution transformer
Supply of 25 KVA Distribution Transformer
Work involving the proper placement of one damaged 5 MVA power transformer currently situated at the Bhimpur 33/11 kV Power Substation under the EDD Dibai as well as the transportation of a new or repaired transformer to the site and its subsequent r
Increasing Capacity of Distribution Transformer and other electrical work against Business Plan 2025-26 (Package No. 1, 2, 3, 4, 5, 6, 7, 8 /25-26) Under jurisdiction of EDD, Nadarganj, Amousi Zone, Lesa, Lucknow
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-IInd Ballia.
Tender Specification for carrying out the construction of Additional 11.04 Substation, Increasing capacity of Distribution Transformer, construction of new 11 KV Feeder and changing conductor under business Plan 2025 26 in the jurisdiction of Electri
Quantum of works involved in erection of wire mess fencing on different medium power distribution transformer in area of different places in the area of E.D.S.D.-II, Patan under Electricity Distribution Division-III, Purwa, Unnao.
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-2nd Mau
Execution of work for PROTECTION OF L.T. EQUIPMENT SUCH AS 100 KVA and above DISTRIBUTION TRANSFORMER (on semi turnkey basis) IN THE AREA OF Electricity Distribution Division-ii, Gorakhpur against Business plan scheme 2024-25
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-Ist Ballia.
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-III Ballia.
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-IV Ballia.
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-3rd Ghosi
For the Work of Additional Business Plan 2023-24 for the Installation of Distribution Transformer and Making 02 No Separate Feeders for Load Bifurcation of Ramleela Ground, Mokhampur 11 KV Feeder Under EUDD-V, Meerut.
QUANTUM OF WORKS (69 WORKS) INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2023-24 UNDER THE AREA OF EDSD-I, IIANDIII UNDER THE EDD-IV BANGARMAU UNNAO.
QUANTUM OF WORKS (53 WORKS) INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2023-24 UNDER THE AREA OF EDSD-I, IIANDIII UNDER THE EDD-IV BANGARMAU UNNAO.
Supply of 11/0.433 KV, 630 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with LT Protection box MCCB
QUANTUM OF WORKS (17 WORKS) INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2023-24 UNDER THE AREA OF EDSD-I, IIANDIII UNDER THE EDD-IV BANGARMAU UNNAO.
The Work for increasing capacity of 400/630KVA T/F by Installation of additional 250 KVA T/F and Increasing capacity of Distribution Transformer from 250 to 400 KVAin the area of UEDD-V, Varanasi
Providing and installing Bakelite strip set with connector and Sutaible capacity Fuse Wire with 6 Nos. zast Bolt with Nut at 11 KV Bushing of 25,63 and 100 Kv Distribution Transformer under EDD-1st Mau
Increasing Capacity of Distribution Transformer against and construction Line against Business Plan 2022-23 (Package No. 127, 128, 129, 130, 131, 132, 133/22-23) under jurisdiction of EDD, CESS-I, Cis Gomti Lesa, Lucknow
Increasing Capacity of Distribution Transformer against and construction Line against Business Plan 2022-23 (Package No. 151, 138, 139, 140, 144 and 145under jurisdiction of EDD, CESS-I/II/III/IV, Cis Gomti Lesa, Lucknow
Quantum of works involved for providing boaring type earthing at distribution transformer and earthing of pole with fixing of danger board at diff. location in the area of EDSD-II under the EDD-I, Unnao.
Supply of 11/0.433 KV, 630 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with LT Protection box MCCB
9 KVA 750V /415V / 190VAC, 3-Phase, Star-Star-Star, Dry Type, AIR Cooled Power Distribution Transformer for LHB Type Coaches Confirming to RDSO Specification No. RDSO/PE/SPEC/0158-2010 (Rev-1) [Item r
9KVA 750V / 415V / 190V AC, 3-PHASE, STAR-STAR-STAR, DRY TYPE, AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE COACHES CONFIRMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/0158-2010,REV-1,TYPE-1
15KVA, 750V/415V/190V AC, 3 phase, Star-Star-Star (Yyy), Dry type and air cooled power distribution transformer suitable for pantry car load & train lighting load (10.5 KVA-415 AC+ 4.5KVA -190 AC) of
9 KVA 750 V, 415 V, 190 V, 3 Phase Star, Star, Star Dry type Air Cooled Power Distribution Transformer for LHB Type Coaches as per RDSO/PE/SPEC/TL/0158-2010, REV.0 Type .
60 KVA 750/415V 3 phase Dry Type power Distribution Transformer for EOG LHB Coaches as per RDSO's SPEC No.RDSO 's SPEC No. RDSO/ PE/ SPEC/ AC/ 0080-2007 [Rev-2] with amendment No. 1
9KVA,750V/415V/190V AC, 3 Phase, Star-Star-Star, Dry type, Air Cooled Power Distribution Transformer for LHB type Coaches, Confirming to RDSO Specification No RDSO/PE/SPEC/TL/0158-2010 (Rev-1), (type-
Dry type Power Distribution Transformer 60KVA capacity,750/415 V,3-Phase for LHB type AC coaches as per RDSO Specification No. RDSO /PE /SPEC /AC/0080 - 2007 (Rev-2). Accepted Make/Brand : PTC/SELF
Supply of 60 KVA 750/415V 3 phase Dry Type power Distribution transformer for LHB Coaches as per RDSO's SPEC No. RDSO PE SPEC AC 0080-2007 (REV- 2) with Amend. No. 1 or lastest.
15KVA, 750V/415V/190V AC, 3 phase, Star-Star-Star (YYY), Dry type and air cooled power distribution transformer suitable for pantry car load & train lighting load (10.5 KVA-415 AC+ 4.5KVA -190 AC) of
15KVA, 750V/415V/190V AC, 3 Phase, Star-Star-Star (Yyy), Dry Type and Air Cooled Power Distribution Transformer suitable for pantry car load & train lighting load (10.5 KVA-415AC + 4.5 KVA-190 AC) of
9 KVA DRY TYPE DISTRIBUTION TRANSFORMER 750/415V/190V AC,3-PHASE CONFIRMING TO RDSO SPEC.NO. RDSO/PE/SPEC/TL/0158-2010 REV-1 OR LATEST . SUITABLE FOR NON AC LHB LS AND LWSCN COACHES
Anti vibration mounting pad (AVM) for 60 KVA ,750/415 3 phase Dry type distribution transformer for LHB type EOG/AC coaches confirming to RDSO specification no RDSO/PE/SPEC/AC/0080-2007 (Rev-2).
9KVA 750V / 415V / 190V AC, 3-PHASE, STAR-STAR-STAR, DRY TYPE, AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE COACHES CONFIRMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/0158-2010,REV-1 OR LATES
60KVA, 750V /415V, 3 Phase dry type distribution transformer, conf. to RDSO Spec. No. RDSO/PE/SPEC/AC/0080 -2007 (Rev - 2), suitable for LHB type Rajdhani /Shatabdi EOG AC coaches. as per Drg.No. RDSO
9 KVA DRY TYPE DISTRIBUTION TRANSFORMER 750/415V/190V AC, 3-PHASE CONFIRMING TO RDSO SPEC.NO. RDSO/PE/SPEC/TL/0158-2010 REV-0 OR LATEST. SUITABLE FOR NON AC LHB LGS, LWSCN & LSLRD COACHES.
15KVA, 750V/415V/190V AC, 3 phase, Star-Star-Star (Yyy), Dry type and air cooled power distribution transformer suitable for pantry car load & train lighting load (10.5 KVA-415 AC+ 4.5KVA -190 AC) of
Construction work of Transformer Plinth for 10 Transformers of 250 kva capacity being installed under Business plan 2023-24 (339 crores)
Works of shifting, dismantling, testing, centrifuging, construction of new transformer plinth and installation of new transformers at Obra Thermal Power Station
work of stopping transformer oil leakage from Power Transformers installed at various 33/11 KV sub-station under EUDD-III, Aligarh
Construction work of Transformer Plinth for 10 Transformers of 250 kva capacity being installed under Business plan 2023-24 (20 crores)
Routine and Breakdown maintenance of HT/ LT Transformers, Ventilation system and Overhauling of LT Transformer of 3x210 MW, ATPS, Anpara (Sonebhadra)
THE WORK OF CARRIAGE 8 MVA TRANSFORMER GANWA SUB STATION AND INSTALLED, SIRVICE OF 8 MVA TRANSFORMERS PACKING AND GAS KIT.