Loading…
Loading…
15,045 results • Best match
Work of Repairing and maintenance of HT/LT Bushing, radiator, top plate, oil leakage of 2 nos 10 MVA Power Transformer in the area of EUDD-IV under the Jurisdiction of EUDC-III GZB.
Work of Repairing and maintenance of HT/LT Bushing, radiator, top plate, oil leakage of 2 nos 10 MVA Power Transformer in the area of EUDD-IV under the Jurisdiction of EUDC-III GZB.
Work to stop oil leakage from the 05 MVA power transformer installed at the Manglaur substation under the Shikarpur Electrical Distribution Division, Bulandshahr, and to repair the faulty 11 kV bushing rod and packing.
Quantum of work attending oil lekage Power Transformer 05 MVA related work at 33/11 KV sub station Maurawan Town, Unnao under area of EDSD-III, Maurawan of Electricity Distribution Division-III, Purwa, Unnao
Work regarding the relocation of a 05 MVA power transformer from its plinth to a suitable location, on a rate contract basis, within the jurisdiction of EDSD-I, Kakod, Bulandshahr under EDD-Kakod, Bulandshahr.
FOR THE WORK OF , Stopping of oil leakage form 10 MVA Power Transformer No. 1 at 33/11 KV Sub Station Mohanlalganj under the jurisdiction of E.E., EDD, CESS-III, Ciss Gomti-LESA, Lucknow.
Making Plinth and fencing of Distribution Transformer
Distribution Transformer Carrige Work in EDD Dadri
BP 2025-26 Distribution Transformer Increase capacity
REPLACEMENT OF DAMAGED WIRE AND DISTRIBUTION TRANSFORMER
vcb work and distribution transformer protection work
Distribution transformer shamtavardhi under eudd ii sre
work for repairing distribution transformer pipe earthing
BP 2025-26 increase capacity distribution transformer
Replacement of damaged LT Transformers by new/repaired Transformers
Replacement of 40MVA 132/33KV Transformer (Alstom make) by new 63MVA 132/33KV Transformer (Transformers and Rectifiers India Ltd. make) alongwith other associated Works at 132KV Sub Station Bisauli, Budaun under E.T.D., Budaun
SCHEDULE OF RATES AND QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER, REPLACEMENT OLD JARJAR BATTREY CHARGER SET) UNDER THE SPECIAL BUSINESS PLAN YEAR 2023-24 IN THE AREA OF E.D.S.D.-II, HASANGANJ UNDER E.D.D.
For Proposed Spliting of LT Circuits of Distribution Transformer at Gudamba, Bharkhurdarpur, Jankipuram Garden, Mishrapur under the head of Naveen JilaVikasNidhiYojna in the area of S/div. G.P.R.A., Under the jurisdiction of EDD-BKT, LESA, T.G. LKO
ON SITE Preventive maintenance of medium Power Distribution Transformer 160, 250 400 630 to 1000 KVA) installed at different places in the area of E.U.D.D Aishbagh/UPTRON/Rajajipuram under jurisdiction of E.U.D.C.-III LESA CIS Gomti Lucknow
Laying of ABC for reducing the load of L.T. Circuit of different Distribution Transformer at Balkhandi, Tubewell No. 10, Shukla Vihar, Toffy Factory in the area of E.U.D.S.D.-Rajajipuram-I under E.U.D.D.-Rajajipuram, LESA CIS Gomti,LKO
9 KVA, 750V/415V/190V AC, 3 Phase, Star-Star-Star, Dry type, Air Cooled Power distribution Transformer for LHB type coaches. RDSO/PE/SPEC/PL/0158-2010, REV-0, Type-1, Packing Instruction: PI146 VER 1.
9KVA Dry type Distribution Transformer, 750V/415V/190V AC, 3 Phase, confirming to RDSO/PE/SPEC/TL/0158-2010, Rev-0 or latest. Suitable for Non AC LHB LS and LWSCN Coaches. With all accessories as per
9 KVA, 750V/415V/190V AC, 3 Phase, Star-Star-Star, Dry type, Air Cooled Power distribution Transformer for LHB type coaches. RDSO/PE/SPEC/TL/0158-2010, REV-1, Type-1, , Packing Instruction: PI146 VE R
9KVA, 750V/415V/190V AC, 3 PHASE, STAR-STAR-STAR DRY TYPE AND AIR COOLED POWER DISTRIBUTION TRANSFORMER TO RDSO SPEC NO. RDSO/PE/SPEC/TL/0158-2010 REV.1, TYPE.1.ITC Accepted make/brand:- VIMAL.
60 KVA, 750 V/415 V, Three Phase Dry Type Power Distribution Transformer for LHB type AC coaches (EOG)/Power Car confirming to RDSO Specification No. RDSO/PE/SPEC /AC/0080-2007 (Rev-2) Firm`s Offer -
9 KVA DRY TYPE DISTRIBUTION TRANSFORMER TO RDSO/PE/SPEC/TL/ 0158 -2010 (REV.0) (TYPE-1).AVM SHALL BE TO MODEL NO. EFM 2.65, M12 OF RESISTOFLUX OR EQUIVALENT OF DUNLOP/ METTALISTIC. Please visit ICF Ve
9KVA, 750V/415V/190V AC, 3 PHASE, STAR-STAR-STAR DRY TYPE AND AIR COOLED POWER DISTRIBUTION TRANSFORMER TO RDSO SPEC NO. RDSO/PE/SPEC/TL/0158-2010 REV.1, TYPE.1.ITC Accepted make/brand:- VIMAL.
9 KVA DRY TYPE DISTRIBUTION TRANSFORMER 750/415V/ 190VAC,3-PHASE CONFIRMING TO RDSO SPEC.NO. RDSO/PE/SPEC/TL/ 0158-2010 REV-0 OR LATEST . SUITABLE FOR NON AC LHB LS AND LWSCN COACHES as per Drg.No. -
9 KVA DRY TYPE DISTRIBUTION TRANSFORMER 750/415V/ 190VAC,3-PHASE CONFIRMING TO RDSO SPEC.NO. RDSO/PE/SPEC/TL/ 0158-2010 REV-0 OR LATEST . SUITABLE FOR NON AC LHB LS AND LWSCN COACHES as per Drg.No. -
9KVA, 750V/415V/190V AC, 3 phase, Star-Star-Star (Yyy), Dry type and Air cooled Power Distribution Transformer (Type-I) Suitable for use in LHB type non AC EOG coaches, as per RDSO Specification no. R
Execution of following works for Porviding, Testing and commisioning of Mantinence free chemical earthing for 250 KVA to 630 KVA 11/0.433 KV Distribution Transformer in the area of EDSD Ist Upera under Electricity Distribution Division, Garhmukteshw
Execution of following works for Porviding, Testing and commisioning of Mantinence free chemical earthing for 250 KVA to 630 KVA 11/0.433 KV Distribution Transformer in the area of EDSD IInd Garh under Electricity Distribution Division, Garhmukteshw
Testing of 33/11 K.V. Feeder Panel, Breakers AND Power Transformer at different 33/11 Sub-Stations in area of E.D.S.D.- II AND Bicchiyaa under Electricity Distribution Division-I, Unnao
Distribution Transformers
work for maintenance of power transformer
power transformer neutral and body earthing
work for pipe earthing power transformer
work for maintenance of power transformer
Supply of materials for Power Transformer
Replacement of 400kV Old Current Transformers with new Current Transformer in 400kV BTPS Switchyard.
Control Transformers Rating: 100VA, Control Transformers Rating: 200VA, Control Transformers Rating: 500VA
various electrical work distribution transformer enhancement installation of distribution transformer 11 kv line work new and repairing of LT Line ETC
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT DISTRIBUTION TRANSFORMER INSTALLMENT STRENGTHENING OF 11 KV LINE NEW AND RAPAIRING OF LT LINES
The Erection work of 11 KV Lines due to bifercation of various 11 KV Feeders and Increasing Capacity of Power Transformer from 5 MVA to 10 MVA under Business Plan 2023-24 under EUDD, Banda
The Erection work of 11 KV Lines due to bifercation of various 11 KV Feeders and Increasing Capacity of Power Transformer from 8 MVA to 10 MVA under Business Plan 2023-24 under EUDD, Banda
WORK OF PARTIAL DISCHARGE AND TAN DELTA TESTING OF 220 KV AND 132 CTS/PTS AND TAN DELTA, IR TESTING OF BUSHINGS AND WINDINGS OF POWER TRANSFORMER INSTALLED AT VARIOUS SUB STATIONS UNDER ETD HAMIRPUR.
WORK OF PARTIAL DISCHARGE AND TAN DELTA TESTING OF 220 KV AND 132 CTS/PTS AND TAN DELTA, IR TESTING OF BUSHINGS AND WINDINGS OF POWER TRANSFORMER INSTALLED AT VARIOUS SUB STATIONS UNDER ETD BANDA.
REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE IN 33BY11 KV SUBSTATION POWER HOUSE 10 MVA CIVIL LINE 8MVA JYOTI ROAD 5MVA AND SHAMSHANGHAT 5MVA FOR 04 NOS VARIOUS POWER TRANSFORMER UNDER EDD_I MAINPURI
REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE IN 33BY11 KV SUBSTATION JYOTI ROAD(RURAL) 10 MVA AUNCHHA 10MVA AND JYOTI KHUDIYA 02 Nos 5MVA VARIOUS POWER TRANSFORMER UNDER ELECTRICITY DISTRIBUTION DIVISION KARHAL MAINPURI
Construction of 11 KV Line and installation of 5 MVA Power Transformer for release of 1500 KW connection Regional Manager Prayag. Depot, Rajapur, Prayagraj on Semi turn key Basis Under Electricity Urban Distribution Division Mayohall.